This Government Contract opportunity from Department Of Commerce was posted on August 24, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - NOTICE OF TASK ORDER FOR CONSTRUCTION SERVICES FOR THE INSTALLATION OF THE ORGANIC PHOTOVOLTAIC FACILITY IN BUILDING 224, ROOMS A330 AND A332 AT THE NIST, GAITHERSBURG, MD CAMPUS

Closed
SB1341-10-RP-0114Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 19 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

NIST, 100 Bureau Drive, MS 1930, GAITHERSBURG, MD, 20899, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Robin JeffriesContract Specialist
Michael R. SzwedSupervisory Contract Specialist

Full Description

Show more
RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER EXISTING NIST MULTIPLE AWARD CONSTRUCTION IDIQ CONTRACTS, L&M Construction (SB1341-10-CQ-0003) and J&L Mavilia, Inc. (SB1341-10-CQ-0004) NIST's multiple award construction IDIQ contracts were competitively awarded. This project is being funded by the American Recovery and Reinvestment Act of 2009. One task order will be awarded will be awarded for the procurement of construction services for the installation of the Organic Photovoltaic Facility in Building 224, Rooms A330 and A332, at the NIST, Gaithersburg, MD campus. This is not a solicitation.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS