Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on May 25, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Refuse and Recycling Services

Closed
SB1341-16-RQ-0242Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562111
New
MI 2026-09 Waste Removal Collection Services
Solicitation # MI2026-09
Adams and Associates, Inc., operating on behalf of the U.S. Department of Labor, is soliciting bids for weekly waste removal and recycling collection services at the Miami Job Corps Center in Florida. The contract period runs from November 1, 2026, to October 31, 2027. The scope of work requires the provision and servicing of one 6-yard solid waste container twice weekly, two 8-yard solid waste containers twice weekly, one 8-yard recycling container twice weekly, and one 4-yard recycling bin once weekly. As a federally funded facility, the center is entitled to GSA pricing, and the agreement is subject to Service Contract Act regulations, including specific wage determinations and payroll submission requirements for service incidents exceeding 2,500 dollars. Bids are due by October 23, 2026, and must be submitted on company letterhead to the Purchasing Department. Required documentation includes a W9, Vendor Questionnaire, Authority to Commit, proof of Florida business and employee licensure, and a Certificate of Liability Insurance showing at least 1,000,000 dollars per occurrence. All vendors must maintain an active SAM.gov registration and a valid Unique Entity ID. Award selection is based on the most responsible bidder rather than the lowest cost alone. Payment terms are NET 30 days from the date of invoice, and contractors must adhere to strict center regulations regarding security screenings and the prohibition of fraternization with students and personnel.
Miami Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 1 day
NAICS: 562111
New
SLED
Solid Waste Collection and Disposal Services at Possum Kingdom.
Solicitation # 27-1404
The Brazos River Authority (BRA) is soliciting bids under RFB No. 27-1404 for a qualified contractor to provide comprehensive solid waste collection, removal, and disposal services at Possum Kingdom Lake. The selected contractor must self-perform 100 percent of the services, which include the collection and transportation of municipal solid waste to permitted sanitary landfills or transfer facilities. All operations must strictly adhere to Texas Commission on Environmental Quality (TCEQ) criteria and TAC Chapter 330 Rules. Key responsibilities include maintaining collection equipment in safe working condition, repairing or replacing unusable dumpsters, and resolving collection complaints within 24 hours. The contract will be awarded to the lowest responsible respondent based on price, past performance, and responsiveness. Bidders must submit a comprehensive proposal organized in a tab format, including company history, a list of similar services completed within the last five years, and a completed bid form. Required documentation includes a W-9, Conflicts of Interest Questionnaire, Non-Collusion Affidavit, and Vendor Compliance to State Law form. Submissions are due by November 10, 2026, and can be delivered via BidNet Direct, hand delivery, or mail to the BRA office in Waco, Texas. Payment for accepted services is typically processed within 30 days of receipt of a proper invoice.
BRAZOS RIVER AUTHORITY

POSTED

about 17 hours ago

DEADLINE

in 20 days
NAICS: 562111
New
Federal
J045--SOLID WASTE REMOVAL
Solicitation # 36C24626Q0898
The Department of Veterans Affairs Network Contracting Office 6 is soliciting quotes for comprehensive solid waste, garbage, and recycling collection and disposal services at the Richmond Central Virginia VA Health Care System. This is a firm-fixed-price IDIQ contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The period of performance consists of a base year ending September 30, 2027, with three subsequent one-year options, potentially extending through September 30, 2030. The scope includes the scheduled removal of waste from various containers, including 42 CY and 35 CY compactors, as well as the management of universal waste such as batteries and lamps. The contract specifically excludes hazardous chemical and radioactive waste, and regulated medical waste is handled under a separate agreement. The contractor is responsible for providing clean, serviceable containers and managing the collection of mixed recyclable metals and miscellaneous yard waste. While the VA maintains ownership and responsibility for the repair of the Sani-Pak compactor and baler, the contractor is responsible for hauling and emptying the receivers. Award will be based on a best-value determination, where technical approach and past performance combined may be weighted more heavily than price. Key requirements include compliance with SDVOSB subcontracting limitations, maintaining minimum general liability insurance of 500,000 dollars, and adhering to strict packaging and labeling standards for universal waste. Total estimated tonnage for the requirement is 1,800 tons.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 21 hours ago

DEADLINE

in 2 days
NAICS: 562111
New
Federal
Site Visit - Removal of Old Fluid Cell
Solicitation # 82247
The Maintenance Support Group at Robins Air Force Base, Georgia, requires a contractor to provide all labor, equipment, materials, and transportation to decommission, remove, and dispose of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press located in building 140. The scope of work includes dismantling and rigging heavy components, such as a 148,000 lb unwound main cylinder and an 86,000 lb lower filler piece, relocating them to a designated on-base cutting site, reducing the materials to recyclable sizes, and hauling all scrap and debris off-base. The contractor is also responsible for restoring the work area and any cutting sites to their original pre-project conditions, ensuring they are free of industrial waste and grease. A critical requirement is the submission of a Draft Technical Removal Plan within 14 calendar days of the award, which must be formally approved by the Contracting Officer before any physical work begins. Operational constraints include a strict floor loading limit of 350 PSI on concrete floors and the requirement to secure daily DAF Form 592 hot work permits for any on-base cutting activities. Additionally, the contractor must maintain operational fire extinguishers at all cutting sites. This sources-sought opportunity, solicitation number 82247, includes a site visit scheduled for December 14, 2026, requiring visitors to provide identification and vehicle documentation at the Robins AFB Visitor's Center.
FA8571 Maintenance Contracting Afsc Pzim

POSTED

about 21 hours ago

DEADLINE

in about 2 months

General Info

Contract Value

$213,455.4

NAICS

562111 - Solid Waste Collection

Place of Performance

Department of Commerce National Institute of Standards and Technology 325 Broadway, BOULDER, CO, 80305, USA

Set-Aside

SBA

Award Issued Date

Documents

13

Attachment_1_-_Solicitation_Addenda_--_Instructions_Evaluation_Criteria_and_Basis_for_Award.docx

DOCX

Attachment_2a_-_Historical_Data_NIST_tonnage.pdf

PDF

Attachment_2b_-_Reference_Drawing.pdf

PDF

Attachment_2c_-_Contractor_Pricing_Sheet.xlsx

XLSX

Attachment_2_-_PWS_Trash_and_Recycle.docx

DOCX

Attachment_3_-_GENERAL_INSTRUCTIONS_Trash_and_Recycle.docx

DOCX

Attachment_4_-_Past_Performance_Questionnaire_%28PPQ%29.docx

DOCX

Attachment_5_-_SCA_WD_15-5415_Rev2_12-29-15.txt

TXT

Attachment_6_-_RFQ_Experience_Submittal.docx

DOCX

FormSF1449_-_SB1341-16-RQ-0242.pdf

PDF

SB1341-16-RQ-0242_-_SF30_Amendment_001.pdf

PDF

SB1341-16-RQ-0242-SF30_Amendment_002.pdf

PDF

SB1341-16-RQ-0242-SF30_Amendment_003.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Patricia M. BullingtonContract Specialist
Matthew E. GomerContract Specialist

Full Description

Show more
AMENDMENT 003 - The purpose of this amendment is to post questions received and government responses. Please reference the attached SF30 Amendment 003 for the questions and responses.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS