Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reinforced Concrete Boat Ramp Construction

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the construction of three new reinforced concrete boat ramps, each measuring 20 feet in width and 6 inches in thickness. The ramps are specified to have a non-skid V-groove finish for safety and durability, reinforced with #4 epoxy-coated rebar to enhance structural integrity. The concrete used must achieve a strength of 4,000 psi and comply with the AASHTO HS-20 load rating, ensuring the ramps can support heavy loads typical for boat access. The project is classified as a subcontract and is set aside exclusively for small businesses under the SBA Total Small Business Set-Aside program. The solicitation was posted on May 28, 2026, with a response deadline of June 5, 2026. The place of performance is in Kirwin, zip code 67644, and the contract falls under NAICS code 238110, which pertains to concrete contractors. The contracting agency is the Department of the Interior, specifically the Gaoa Fish and Wildlife Service.

General Info

Construction of three reinforced concrete boat ramps with non-skid finish, small business set-aside.

Agency

Department Of The Interior → Gaoa Fws

NAICS

238110 - Poured Concrete Foundation and Structure Contractors View NAICS

Place of Performance

Kirwin, KS, 67644, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Gaoa Fws
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct three new 20 ft wide, 6 in thick reinforced concrete ramps with non-skid V-groove finish, #4 epoxy-coated rebar, and 4,000 psi strength. Must meet AASHTO HS-20 load rating.