Relay and Control Panel Manufacturer

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

OH, USA

Set-Aside

NONE

Documents

This scope was carved out of 24-17.9A.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

24-17.9A

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Piqua
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Piqua
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates specialized electrical protection and communication panels for prime contractors on City of Piqua, Ohio substation projects. Constructs three protective relay panels and one communications panel using bolted/welded steel frameworks and sheet steel enclosures. Performs device wiring using Type SIS copper conductors and Burndy ring terminals per IEEE, NEMA, NEC, and UL standards. Delivers four functional control and relaying panels.

Similar Contracts

Same NAICS industry code

More opportunities from Ohio → City of Piqua

Same awarding agency

NAICS: 238110
New
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for Project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted as hard copies in sealed envelopes. The award will be based on the lowest and best bid, considering relative merits, technical specifications, and the bidder's qualifications. Contractors must adhere to State of Ohio Prevailing Wage laws and provide certified payroll reports. Financial security requirements include a bid bond or certified check for 10% of the total bid amount, as well as performance and payment bonds equal to the full contract price upon award. Technical compliance is strictly monitored, with specific tolerances for pier center location, elevation, verticality, and anchor bolt alignment. Concrete strength must reach 75% of the design compressive strength before structures are erected. Payment is processed monthly, with 90% of equipment costs due upon delivery and the final 10% due upon system energization and acceptance. Performance penalties of $500 per calendar day apply for delays beyond the certified delivery date.
Poured Concrete Foundation and Structure Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS