Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Removal and Replacement of Trees at Seaport Village

Forecast
2025-136State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Unified Port District is overseeing a project for the removal and replacement of six trees at Seaport Village in San Diego, California, managed by Protea Properties. The scope involves removing three coral trees, two Ficus trees, and one bottlebrush tree due to root damage to concrete pavers and unstable limbs. These will be replaced with at least ten drought-tolerant, non-invasive trees in the Embarcadero area, maintaining a minimum 1:1 replacement ratio. Tree removal is scheduled for late 2025 and is expected to take three weeks, with replacement plantings occurring in mid-2026. The project includes a five-year maintenance period during which any failed trees must be replaced. Operational requirements include a mix of standard weekday hours and overnight work for two trees to minimize business disruption. Specific logistics involve staging at the Market Place cul de sac and temporary partial closures of Kettner Boulevard, requiring traffic control and flagmen for two days. Pedestrian redirection is required for all sites. Environmental safeguards include bird nesting surveys if work occurs between February 15 and September 1, with strict buffer zones for active nests. The District will ensure compliance with all federal, state, and local laws regarding stormwater, hazardous materials, and demolition debris. The project is categorized as exempt under CEQA Guidelines 15301 and 15304 due to its limited scope and minimal environmental impact.

General Info

San Diego Port District replacing six trees at Seaport Village with drought-tolerant species.

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Julia NagyProperty Manager

Full Description

Show more
The proposed project would involve the removal and replacement of six (6) trees by Protea Properties (Applicant) on behalf of the San Diego Unified Port District (District) in Seaport Village in the city of San Diego, California. The six (6) existing trees require removal due to their roots lifting concrete pavers and/or top weighted limbs prone to breaking. The existing trees consist of three (3) coral trees, two (2) Ficus trees and one (1) bottlebrush tree which would be replaced at a minimum ratio of 1:1, with at least ten (10) drought-tolerant and/or water wise, non-invasive trees to be planted at more suitable locations within the Embarcadero. The District and/or the District’s landscape service providers would remove the trees in approximately late 2025 using a truck, chainsaw, chipper, bucket truck, stump grinder and associated tree removal equipment. The tree removal operations would take approximately three (3) weeks of work to complete. Tree replacement plantings would be completed in approximately mid-2026, with ongoing maintenance as needed, including replacement of the trees within the first five (5) years of planting if they fail. Work hours for approximately two (2) of the trees would include overnight work in order to minimize disturbance to businesses in the area, while the remainder of the trees would be removed from approximately 7:00 am-3:30pm Monday-Friday. Staging for the proposed project would primarily occur on the Market Place cul de sac. Temporary parking stall closures and partial closure of a section of Kettner Boulevard would be required for one (1) Ficus tree removal, which would include traffic control and flagmen for approximately two (2) days of work. As a result of the temporary and partial nature of the street closure, there would be a less than significant impact on traffic. All six (6) of the trees are located adjacent to sidewalk, walkways or promenade and would include a work crew safely redirecting pedestrians around the tree removal site during work. With tree removal activities, if the bird breeding and nesting season cannot be avoided and removal must occur between February 15 and September 1, a breeding and nesting bird survey would be conducted prior to tree removal activities. If an active nest is located, all work within 500 feet of raptor nests and 300 feet of other nests, or a distance determined to be appropriate by a qualified biologist, would be postponed until such nest is vacated and the juveniles have fledged and when there is no attempt of a second nesting. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater. The following categorical determinations are based on the project submittal and all project information known to the District as of the date of this determination.

Similar Contracts

Same NAICS industry code

NAICS: 115112
SLED
AS27-125 Iron Fire Chaining Private and TLA 2026
Solicitation # AS27-125
The State of Utah Division of Wildlife Resources is soliciting bids for the Iron Fire Chaining Private and TLA 2026 project to provide wildfire rehabilitation services in the Tintic Valley area of Tooele County. The project consists of single pass chaining across approximately 1,699 acres to assist in restoration efforts. Participation is strictly limited to pre-qualified contractors who must provide all necessary labor, supervision, and equipment, including two steel tracked crawler tractors with a minimum drawbar horsepower rating greater than 200 and an on-site arc/acetylene welder. The government will provide at least one 240-foot Ely style anchor chain. Work must be performed on the contour at a maximum speed of 4 mph with lateral spacing not exceeding 100 feet, and is prohibited on slopes greater than 35 percent or in soil with moisture exceeding 15 percent. The contract will be awarded to the lowest cost responsive and responsible pre-qualified vendor based on a per-acre price. All work is expected to be completed by December 18, 2026, with a weather-related extension possible until April 30, 2027. Payment will be issued as a single lump sum upon final inspection of the completed acreage. Contractors must maintain commercial general liability insurance of 1 million dollars per occurrence and 3 million dollars aggregate, as well as statutory workers compensation. Additionally, vendors must certify compliance with Utah Code regarding anti-boycott actions, forced labor restrictions, and E-Verify employment status verification. Performance will be evaluated based on quality of service, timeliness, and contract management to determine future eligibility for the rangeland pre-qualification list.
Utah

POSTED

7 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS