Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on September 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removals and Surface Restoration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract for Removals and Surface Restoration involves providing demolition and restoration services for prime contractors on University of Washington facility projects. The scope of work includes the obliteration of pavement markings, the salvage and disposal of materials, and the patching of anchor or post holes. Additionally, the contractor is responsible for repairing pavement, curbs, sidewalks, and landscaping to ensure they match adjacent materials and delivering a clean, restored site. The opportunity is categorized under NAICS code 238910 and was posted on September 3, 2026. Interested parties must submit their responses by the deadline of October 5, 2026.

General Info

Subcontract for University of Washington demolition and surface restoration services due October 5, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 1255123.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SWR-ITB 1255123 - UW Tacoma Street Vacation Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Washington
ContactsNo contacts available
OfficeN/A
Organization / AgencyUniversity of Washington
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs demolition of existing elements and restores damaged surfaces for prime contractors on University of Washington facility projects. Obliterates pavement markings, salvages and disposes of materials, and patches anchor/post holes and repairs pavement, curb, sidewalk, and landscape to match adjacent materials. Delivers a clean site and restored surfaces.

More opportunities from University of Washington

Same awarding agency

New
SLED
209276 RFQ for Design Build Services - Padelford, Triangle, Central Parking Garage Renewal
Solicitation # university-of-washington-1255920
The University of Washington is soliciting Statements of Qualifications from design-build teams for the Padelford, Triangle, and Central Plaza Parking Garage Renewal project. This initiative aims to extend the useful life of these three facilities by ten years through a comprehensive scope of structural repairs, including spalling concrete remediation, crack injections, new traffic coatings, waterproofing, and the replacement of expansion joints. Additionally, the project includes upgrades to lighting, conveyance, ADA access, and sprinkler systems. The work is scheduled to be executed across four summer seasons between 2027 and 2030, with a target budget of 4.6 million dollars to start and 15 million dollars overall, exclusive of Washington State sales tax. The procurement follows the Design-Build alternative public works contracting procedure under chapter 39.10 RCW, utilizing a single progressive design-build contract that begins with a not-to-exceed preliminary agreement. Selection is based on qualifications, with the University shortlisting up to three finalists based on their proposed team, firm philosophy, innovative solutions, and safety records. Finalists will be evaluated on their management plans, ability to meet time and budget constraints, and a price factor. Required submission materials include a one-page cover letter, an A3 format SOQ, and an appendix containing bonding and insurance letters, a safety and health statement, team resumes, and two reference letters. The project also mandates a minimum 15 percent apprentice labor utilization and requires monthly payment reporting through the Access Equity system.

POSTED

about 22 hours ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS