Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Building S-1832, Camp Casey, Korea (MATOC Only)

Closed
W90VN824R0062Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Camp Casey, Korea, KR-41, KOR

Set-Aside

NONE

Documents

5

317446_DWG-MECH - Mechanical Material Indications & Symbols

PDF, High priority: read this first17 pages · specifications
High

317446_DWG-STRC - Structural Drawings and Specifications

PDF, High priority: read this firstspecifications
High

Electrical Drawings - Repair Bldg S-1832 (Project 317446)

PDF, High priority: read this first16 pages · specifications
High

Repair Building S-1832 KIM, YK Camp Casey - Architectural Drawings

PDF, High priority: read this first12 pages · specifications
High

W90VN824R0062 - Repair Building S-1832, Camp Casey, Korea

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0906 Aq Co Contracting Bat
Contacts2 people available
OfficeAPO, AP, 96224-5228, USA
Office AddressAPO, AP, 96224-5228, USA
Contacts
MAJ Alexander Duvaldadrian

Full Description

Show more
Repair Building S-1832, Camp Casey, Korea (MATOC Only) 2.1.1. Structural Work 2.1.1.1. Repair by replacing existing column w/ steel column. 2.1.2. Architectural Work 2.1.2.1. Floor Work 2.1.2.1.1. Replace deteriorated existing floor tile with new PVCT including VCB or wooden base as shown on new floor plan & interior finish schedule. 2.1.2.1.2. Replace deteriorated existing CMT with new FCT including cement bond coat, waterproof membrane, mortar bed as shown on floor plans, section and details drawings. 2.1.2.2. Interior & Exterior Wall Work 2.1.2.2.1. Replace deteriorated existing gypsum wall board walls with new GWB wall (GWB, normal, water resistant or 'X' type) including metal studs, metal clips and metal bar as shown on floor plans, sections and detail drawings. TP I-1 2.1.2.2.2. Paint all interior walls and designated exterior surfaces as shown on floor plan, detail drawings and interior finish schedule. 2.1.2.2.3. Replace deteriorated existing GCWT with new including cement bond coats, waterproof membrane, plastering w/metal lath and waterproof GWB as shown on floor plans and sections. 2.1.2.3. Interior & Exterior Ceiling/Roof Work 2.1.2.3.1. Replace deteriorated existing ceiling with new acoustical tile ceiling and gypsum wall board (GWB, normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plan, sections and finish schedule. 2.1.2.3.2. Paint on all interior ceiling surfaces as shown on interior finish schedule and section. 2.1.2.3.3. Replace deteriorated existing insulations with new at bottom of the roof surfaces including fluted metal linings as shown on floor plan, sections and interior finish schedule. 2.1.2.3.4. Replace existing metal roof with new protected metal roof at storage facility area including 2-ply of 12THK plywood sheathings, roof insulations and fluted metal linings at bottom of the roof as shown on elevation, sections and finish schedule. 2.1.2.3.5. Repair by installation of fluid applied waterproofing system on existing metal roof at the straight metal roof area and new protected metal roof at storage facility area including replacement of wooden fascia boards, metal rain gutters and downspouts as shown on floor plan, elevations and finish schedule. 2.1.2.4. Misc. Work 2.1.2.4.1. Replace deteriorated existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule. 2.1.2.4.2. Replace deteriorated existing windows with new including horizontal fireproof type mini blinds. 2.1.2.4.3. Replace deteriorated existing columns with new as shown on floor plan. *See structure drawings. 2.1.2.4.4. Replace deteriorated existing fire extinguishers cabinets (FEC) with new as shown on floor plans and detail drawing. 2.1.2.4.5. Replace deteriorated existing all toilet accessories with new as shown on floor plans, schedule and detail drawings. 2.1.2.4.6. Replace interior & exterior signages with new as shown on floor plan, elevations and signage schedule. 2.1.2.4.7. Replace deteriorated existing bulletin board with new as shown on floor plan, detail drawing and signage schedule. 2.1.2.4.8. Clean the existing main entrance aluminum double doors. 2.1.2.4.9. Replace deteriorated existing concrete stoop and metal canopy with new including wooden step inside the door as shown on new floor plan and pictures. 2.1.3. Mechanical Work 2.1.3.1. Repair the heating and cooling system by installing new split heat pump system, split air conditioning unit, electric wall heater, electric unit heater, valves, piping, insulations, controls, equipment support (Conc. pad), and all associated accessories for HVAC system as shown on drawings. TP I-2 2.1.3.2. Repair the ventilation system by installing new split compact dedicated outdoor air system, exhaust fans, controls, diffusers, register, ducts, insulations, outside air intake louver with birdscreen, motorized damper and all associated accessories for ventilation system as shown on drawings. 2.1.3.3. Repair the plumbing system by installing new electric domestic hot water heater, domestic hot water recirc. pump, electric water cooler, domestic cold and hot water piping system, insulation, sewer and vent piping system, water hammer arrests, floor drain, floor cleanout including plumbing fixtures, and all associated accessories as shown on drawings. 2.1.4. Electrical Work 2.1.4.1. Replace deteriorated existing interior/ exterior lighting fixtures, exit lights, toggle switches, wires and conduits with new. 2.1.4.2. Replace existing watthour meter, current transformers, panelboards, receptacles w/cover plates, associated wiring & conduits with new. 2.1.4.3. Replace deteriorated existing safety switches, motor controllers, junction boxes, control/power wires and conduits for mechanical systems with new. 2.1.4.4. Replace deteriorated fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector & relay module, antenna, visual/signal strobes (15 or 75 candela), microphone, speaker (wattage as req'd) device, fire alarm building transmitter, antenna, surge protector, and associated wiring and conduit. 2.1.4.5. Replace deteriorated existing telecommunication system including telephone terminal board, telephone/data outlets w/cover plates, terminal blocks, equipment rack and associated wire & conduit with new. 2.1.4.6. Replace existing exterior underground telecommunication line, accessories with new. 2.1.4.7. Replace existing exterior power distribution system with new including pad mounted transformer. Army Contract Writing System (ACWS) Transition Information for Offerors The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation. During this transition period, Offerors are hereby advised: The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this: This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall: Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer: May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

More opportunities from Department Of Defense → 0906 Aq Co Contracting Bat

Same awarding agency

NAICS: 561790
New
Federal
Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.
Solicitation # W90VN827RA001
Solicitation W90VN827RA001 seeks a contractor to provide non-personal cleaning services for kitchen exhaust systems, including hoods, ducts, and rooftop exhaust fans, at 33 dining facilities within USAG Yongsan-Casey, South Korea. The primary objective is to mitigate fire hazards caused by grease accumulation in accordance with NFPA 96 and Army Regulation 420-1. Services are generally performed monthly, with the exception of the Koryosan DFAC, which requires semi-annual cleaning. The total contract duration, including options, shall not exceed 66 months, with a performance schedule operating Monday through Saturday between 06:00 and 22:00. The government will award the contract based on best value, evaluating offers on technical capability, past performance, and price. Technical capability is heavily weighted toward the contractor's registration and certifications, specifically requiring a valid ROK Government business license, a Hygiene Management Permission License, and an Annual Hygiene Training Certificate for 2026. Proposals must be submitted via the PIEE Solicitation app in three separate volumes, ensuring that no pricing data is included in the technical volumes. Contractors are responsible for maintaining a Quality Control Plan to meet a performance threshold of no more than one defect per year. Administrative requirements include the use of the Wide Area Workflow system for electronic invoicing and payments in Korean Won. Additionally, all personnel must complete annual DoD Cybersecurity Awareness Training, and all contractor vehicles must be registered with the Provost Marshal within 30 working days of the contract start date.
Other Services to Buildings and Dwellings

POSTED

5 days ago

DEADLINE

in 2 days
View Details
NAICS: 811310
New
Federal
Fuel Tank Inspection
Solicitation # W90VN626QA018
Solicitation W90VN626QA018 is a request for quotations for fuel tank inspection, testing, and maintenance services at Osan Air Base, Republic of Korea. The scope of work includes monthly and annual inspections of 369 active aboveground and underground storage tanks, emergency service calls, and repair services. The contract is structured as a Firm-Fixed-Price award consisting of a base year from January 1 to December 31, 2027, with four subsequent option years extending through 2031. This requirement is conducted under the Logistics Cost Sharing program and is funded by the Republic of Korea Ministry of National Defense, meaning the U.S. Government incurs no financial liability. The award will be based on a best-value comparative evaluation of four factors in descending order of importance: a practical demonstration via a mock inspection, technical factors including approach and staffing, past performance, and price. Offerors must meet strict eligibility requirements, including specific ROK business registrations for fuel tank maintenance and mechanical facility construction, and must provide key personnel such as an STI SP001 Certified Inspector and a licensed Contract Manager. All quotes must be submitted in English via the PIEE Solicitation Module by October 28, 2026, divided into four separate volumes covering technical, past performance, price, and administrative documentation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier systems and associated Access Control Point control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for the demolition and disposal of existing barriers, all necessary civil and electrical site work, and the complex reprogramming of Programmable Logic Controllers to ensure synchronized, fail-safe operations across multiple gatehouses and inspection centers. Technical requirements specify that equipment must meet ASTM F2656-20 standards, with minimum ratings of H30/P1 for the Morin Gate and M50/P1 for the Main Gate. The project includes a 240-day performance period with an estimated completion date of July 30, 2027. The government will award a firm-fixed-price contract based on best value, prioritizing the lowest-priced offer that is deemed technically acceptable with an acceptable past performance rating from the last five years. Key submission requirements include a material supply and technical support agreement from an authorized domestic supplier and manufacturer certification for installers. All quotes must be submitted electronically via the Procurement Integrated Enterprise Environment by the extended closing date of October 29, 2026, at 1300 hours KST. Notably, this contract is funded by the Republic of Korea Ministry of National Defense, meaning no U.S. government funds are obligated, and contractors must certify tax exemptions under the US-ROK SOFA.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS