This Solicitation opportunity from Department Of Defense was posted on August 29, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replace Pumphouse and Truck Fillstands at Moody AFB, GA

Closed
W912HN-16-R-0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days

General Info

Contract Value

$10,787,376.83

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Moody Air Force Base, GA, GA, USA

Set-Aside

NONE

Award Issued Date

Documents

29

SF330 Architect-Engineer Qualifications

PDF, High priority: read this first14 pages · past-performance
High

W912HN-16-R-0015 Amendment 0001

PDF, High priority: read this first3 pages · amendment
High

W912HN-16-R-0015 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

W912HN-16-R-0015 Amendment 0003

PDF, High priority: read this first19 pages · amendment
High

W912HN-16-R-0015 Amendment 0004

PDF, High priority: read this first8 pages · amendment
High

W912HN-16-R-0015 Amendment 0004 - Civil/Mechanical Plans

PDF, High priority: read this first10 pages · amendment
High

W912HN-16-R-0015 Amendment 0005

PDF, High priority: read this first2 pages · amendment
High

W912HN-16-R-0015 Amendment 0006

PDF, High priority: read this first19 pages · amendment
High

W912HN-16-R-0015 Amendment 0007

PDF, High priority: read this first2 pages · amendment
High

W912HN-16-R-0015 Amendment 0008

PDF, High priority: read this first6 pages · amendment
High

W912HN-16-R-0015 Mechanical Site Plan and Demolition

PDF, High priority: read this first20 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first676 pages · ifb
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first676 pages · rfb
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first675 pages · ifb
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first675 pages · ifb
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first677 pages · rfp
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first676 pages · rfb
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands

PDF, High priority: read this first676 pages · rfp
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 2

PDF, High priority: read this first616 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 2

PDF, High priority: read this first621 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 2

PDF, High priority: read this first616 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 2

PDF, High priority: read this first621 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 2

PDF, High priority: read this first619 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 3

PDF, High priority: read this first713 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 3

PDF, High priority: read this first598 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 3

PDF, High priority: read this first697 pages · specifications
High

W912HN-16-R-0015 Replace Pumphouse and Truck Fillstands - Vol 3

PDF, High priority: read this first598 pages · specifications
High

W912HN-16-R-0015_AMD5.pdf

PDF

W912HN-16-R-0015.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline added: Jul 26, 2016. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 26, 2016 to Aug 9, 2016.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts1 person available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA
Contacts

Full Description

Show more
Magnitude of the project: $5M-10M Period of performance:540 days after issuance of Notice to Proceed (NTP) Method of Procurement: Lowest Price Technically Acceptable (LPTA) 2 Technical Factors: 1. Past Performance, 2. Corporate Relevant Specialized Experience. Scope of Work: This project consists of the complete, phased replacement of the existing pump shelter and existing truck fillstands as well as modifications to the existing operating tanks and associated area piping. A new pump shelter based upon the DoD Standard Design Type III Hydrant Fuel System consisting of a 2,400 gpm pump shelter (5 x 600 gpm pumps and 5 x 600 gpm issue filter/separators) and associated appurtenances shall serve 4 x 600 gpm truck fillstands via a loop configuration. Truck fillstands and pump shelter equipment will be protected from the environment by canopies. To improve fuel quality, new receipt filter/separators (2 x 1200 gpm) downstream of the existing truck offloading systems will be provided. Provide required pavement, site improvements, and utilities for the new system and demolish the existing pump shelter and truck fillstands in phases.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 541620
New
Federal
Requirement to support the Formerly Used Defense Sites (FUDS) Program Single Award Task Order Contract (SATOC)
Solicitation # W912HN-27-S-1001
The United States Army Corps of Engineers Savannah District is conducting market research for a Single Award Task Order Contract (SATOC) to provide comprehensive Environmental Consulting Services (ECS) in support of the Formerly Used Defense Sites (FUDS) program. Under NAICS code 541620, the selected contractor will provide program management, administrative, logistical, and community relations support for the South Atlantic Division. Key responsibilities include maintaining the FUDSMIS database and FUDS Documents portal, developing Project Management and Site Management Action Plans, coordinating Cost-to-Complete estimates, and managing community outreach activities such as Restoration Advisory Board meetings and the creation of Section 508-compliant materials. All task orders under this contract will be performance-based in accordance with FAR 37.6 and FAR 37.102, utilizing a tailored Quality Assurance Surveillance Plan (QASP). The prime contractor must possess a Facility Clearance (FCL) and ensure personnel complete required OPSEC and Controlled Unclassified Information training. Additionally, personnel performing IA/IT services must comply with DoD 8570.01-M certifications. Deliverables must be uploaded to government-controlled platforms to prevent vendor lock-in. Interested respondents must submit their business identification, size status, and corporate structure via the provided survey link by November 18, 2026.
Environmental Consulting Services

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract under NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small control tower, a small arms range operations control area, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, and latrine pads. Supporting infrastructure requirements encompass electric service, site improvements, information systems, cybersecurity measures, and sustainability energy measures. The period of performance is 720 calendar days following the notice to proceed. Technical requirements are extensive, covering underground electrical distribution, telecommunications outside plant infrastructure, and specific structural standards for metal roof and wall panels, unit masonry, and concrete. Key deliverables include the installation of fiber optic cabling, grounding and lightning protection systems, and the emplacement of various infantry and armor targets. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Following several amendments to revise drawings and specifications, the final bid opening date is established as October 30, 2026, at 2:00 PM local time. Offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Commercial and Institutional Building Construction

POSTED

about 16 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging Select Sites
Solicitation # W912HN27S5000
The Savannah District Corps of Engineers is conducting a sources sought market research effort to identify capable contractors for the FY26 Atlantic Intracoastal Waterway maintenance dredging project. The scope of work involves unclassified dredging at Hell Gate and Florida Passage in Chatham County, Georgia, and Fields Cut in Jasper County, South Carolina. The project requires dredging to an authorized width of 150 feet and a depth of 12 feet, with an estimated total removal of 265,000 cubic yards of material. Dredged sediment will be transported via pipeline or alternative methods to beneficial use sites or confined upland containment areas, with some transport distances reaching up to 9 miles. The estimated magnitude of this requirement is between 5 million and 10 million dollars, falling under NAICS code 237990 with a size standard of 45 million dollars. The expected duration of performance is 165 days from the notice to proceed. Contractors must demonstrate capabilities in hydraulic cutterhead dredging, island shaping to specific slopes, and the use of low ground pressure or aquatic equipment for soft foundations. Additionally, the government is seeking evidence of experience operating in environmentally sensitive areas, managing high vessel traffic, and working within tidal cycles featuring flows up to 4 feet per second. Responses must be submitted via PIEE by November 20, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS