Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replacement of Control Room Box for Field Measurements Truck

Closed
FA910124ControlRoomBoxFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336211
New
DIBBS
BODY, CARGO TRAILER
Solicitation # SPE7L4-27-T-0703
Solicitation SPE7L4-27-T-0703 is a request for quotations issued by the DLA Weapons Support LSO Combat Vehicles and Armament for the procurement of one cargo trailer body, identified by NSN 2510-01-521-8067. The requirement is governed by multiple technical drawings and quality standards, including SAE AS9003 or ISO 9001 compliance for the manufacturer's inspection system. Delivery is required within 161 days after order, with a need ship date of April 20, 2027, and a final required delivery date of October 10, 2027. The item is to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania under the First Destination Transportation program. This procurement includes stringent regulatory and security requirements, including CMMC Level 2 certification and compliance with ITAR and EAR export controls for technical data. The contract incorporates the Buy American and Balance of Payments Program and requires adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Inspection and acceptance will occur at the origin per FAR 52.246-2. While the solicitation is listed as a total small business set-aside in some metadata, the contract text specifies it is not a small business set-aside, though it allows for HUBZone price evaluation preferences. All quotes must be submitted via the DIBBS portal, and payment will be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT LSO COMBAT VEHICLES AND ARMAMENT

POSTED

1 day ago

DEADLINE

in 11 days

General Info

NAICS

336211 - Motor Vehicle Body Manufacturing

Place of Performance

Saint Charles, MO, USA

Set-Aside

NONE

Documents

1

AMSC/FMT Truck Control Room Box Replacement Specifications

DOCX, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts1 person available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Brooke Vandeman

Full Description

Show more
AFTC/PZIA located at Arnold AFB, TN intends to solicit and negotiate with a single source, Craftsmen Industries, Inc. (CAGE code 1MT59), small business vendor under NAICS code 336211, to award a new, firm-fixed priced purchase order to meet the Government's requirement for the Replacement of the Control Room Box for its Field Measurements Truck. See Attachment 1 - Specifications for additional details. The statutory authority 10 U.S.C 3204(a)(1) permitting other than full and open competition is being applied to meet the subject requirement, as use of Simplified Acquisition Procedures, 41 U.S.C 1901, is being employed. During calendar year 1999, the Government's requirement for a Mobile Control Room came to fruition, as it was determined that a mobile control area was needed during testing at remote missile test ranges. To adequately meet the need, the Government developed unique specifications for the design/fabrication of the Mobile Control Room and competed the requirement amongst interested/capable vendors. As a result, a contract was competitively awarded to Craftsmen Industries, Inc., who is the Original Equipment Manufacturer (OEM) for the Government's current Mobile Control Room. As discussed above, the subject requirement is for the replacement of the Government's current Mobile Control Room, as it has reached its end-of-life; however, the original design remains optimal and therefore the Government does not require a re-design. Since the design of the Mobile Control Room is proprietary to Craftsmen Industries, Inc., the vendor has unique qualifications to meet this need. Therefore, the property needed by the agency is available from only one responsible source and no other type of property will satisfy the needs of the agency. This notice of intent is not a request for competitive quotes. However, the Government will consider all responses received electronically by 1:00 PM CDT on 27 September 2024. A determination by the Government to not compete this requirement based upon responses to this notice is solely within the discretion of the Government. The information received may only be considered to determine whether to conduct a competitive procurement. All questions and comments should be addressed to Ms. Brooke Vandeman, Contracting Officer, contact@example.gov. If no favorable responses are received by the date mentioned above, a purchase order will be negotiated with the above-named source.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333517
New
Federal
CNC Small Wire EDM
Solicitation # FA9101CNCSmallWireEDM
The Department of the Air Force is issuing a Sources Sought Notice to identify capable small and large businesses for the procurement of a new, fully functional Small CNC Wire Electrical Discharge Machining (EDM) machine for the Arnold Engineering Development Complex (AEDC) at Arnold Air Force Base, Tennessee. The required equipment must support submerged and non-submerged machining, automatic wire threading and alignment, and U-V taper cutting, with minimum axis travel of 15.5 inches for X, 11.5 inches for Y, 8.5 inches for Z, and plus or minus 2.4 inches for U and V. The machine must be compatible with a 480V, 3PH, 60 HZ electrical system and be built to NFPA 79 standards. Delivery is required within 90 days of order receipt, with the contractor providing assembly, startup, and functional testing based on ISO/ANSI standards at the AEDC Model Shop. The government requires a minimum 24-month warranty after installation and a 10-year accuracy guarantee on the linear drive system. Additionally, the contractor must provide two days of formal on-site operator training for up to five people and two days of maintenance training for up to five workers. Service support requirements include a 36-hour on-site repair response time and a 48-hour delivery window for repair parts. Interested respondents under NAICS code 333517 must submit company information, SAM UEI and CAGE codes, a compliance matrix, product literature, and past performance data to the contracting office by November 2, 2026.
Machine Tool Manufacturing

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS