Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on December 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Expression of Interest (RFEOI) for Construct Shilo Transition Centre

Closed
NRO2006International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility
Solicitation # PD 26-27.004
Solicitation PD 26-27.004 is an invitation for bids to construct a new, resilient, and energy-efficient Escambia County Area Transit (ECAT) facility in Pensacola, Florida. Funded by HUD Community Development Block Grant-Disaster Recovery (CDBG-DR) grants, the project aims to replace infrastructure damaged by Hurricane Sally and relocate operations out of a flood zone. The scope of work involves the construction of five primary structures: an Administration Building, Maintenance Building, Passenger Terminal Transfer Center, Bus Wash, and Fuel Station, along with the addition of a regional stormwater pond to mitigate local flooding. To ensure functionality during emergencies, the facility must be built according to Enhanced Hurricane Protection Area (EHPA) specifications, allowing it to serve as an emergency shelter. The contract is divided into multiple lots, with awards based on the lowest responsive and responsible bid. Bidders must submit electronic responses via the OpenGov portal by November 23, 2026, at 10:00 am. Key requirements include compliance with the Davis-Bacon Act for prevailing wages, HUD Section 3 guidelines to promote economic opportunities for low-income residents, and adherence to ADA and OSHA standards. The successful contractor must provide performance and payment bonds and submit a Quality Control Plan within 10 days of the Notice to Proceed. Liquidated damages for delays are tiered based on the contract amount, with specific daily rates applied per lot.
Purchasing

POSTED

about 1 hour ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract is awarded based on the lowest price, with specific evaluation rules regarding Buy American Act compliance. Bidders must provide pricing for two primary exhibit line items: building renovation and paving removal and replacement. Key administrative requirements include the submission of monthly invoices via Wide Area WorkFlow and adherence to a three-phase quality control process consisting of preparatory, initial, and follow-on phases. Bonding requirements vary by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. All work must comply with the Davis-Bacon Act, ADA accessibility guidelines, and specific military and industry standards for piping and lighting.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 11 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement and repair of drywall, painting, ceiling tiles, flooring, rubber wall bases, electrical components, and cabinetry to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion expected within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid conference on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, and NFPA-101 life safety codes. Payment terms are Net 30, and the contractor must provide a one-year workmanship guarantee and a 20-year manufacturer warranty for LVP flooring.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to restore water-damaged interior spaces, including sixteen residential rooms, bathrooms, and common areas, to return them to safe residential use. Key technical requirements include the restoration of approximately 300 square feet of floor area in mechanical rooms involving drywall installation, joint finishing, and painting. The contractor is responsible for all labor, materials, equipment, and supervision, as well as the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. A minimum one-year workmanship warranty is required upon final acceptance. This solicitation is set aside for Small Businesses and various SBA-certified categories. Proposals must include detailed relevant experience, a comprehensive description of the proposed work methods—including project phasing and occupied-building protection—and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value within ten days of award, along with proof of liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate. Pricing submitted in proposals must remain firm for at least 60 calendar days.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Defence Construction Canada is seeking expressions of interest from general contractors for the construction of a new Canadian Armed Forces Transition Group Transition Centre at CFB Shilo, Manitoba. The project involves the creation of a 928 square meter facility to accommodate approximately 25 personnel, including all associated site work such as excavation, structural framing, mechanical and electrical systems, and landscaping. The estimated contract value is 11,467,000 dollars, excluding taxes and design costs. This is a two-step solicitation process where only contractors who respond to this initial request will be invited to the tender phase, which is expected to begin around December 18, 2025. Successful bidders must adhere to an Indigenous Benefits Plan by including Indigenous businesses as subcontractors or suppliers. Additionally, contractors are required to maintain a valid Designated Organization Screening security clearance. The project timeline mandates substantial completion within 427 calendar days of the contract award, with final completion due within 364 days thereafter.

General Info

General contractors for 11.47M dollar CAF Transition Centre construction at CFB Shilo, Manitoba.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Defence Construction Canada - Western Region
Contacts1 person available
OfficeN/A

Full Description

Show more
English Description DEFENCE CONSTRUCTION CANADA (DCC) – Project No. NRO2006_CN84492 – Construct Shilo Transition Centre at CFB Shilo, Manitoba Defence Construction Canada (DCC) invites general contractors to express their interest in providing all labour, materials, and equipment necessary to build a new Canadian Armed Forces - Transition Group (CAF-TG) Transition Centre building in CFB Shilo, Manitoba This Request for Expression of Interest (RFEOI) is the first step of a two-step solicitation process, the second step being the Tender Phase.  Only the general contractors who will have responded to this RFEOI will be invited to submit a bid during the Tender Phase. DCC reserves the right to terminate this solicitation at the end of the RFEOI. As part of Canada’s commitment to maximize the participation of Indigenous Businesses, bidders are advised that this solicitation includes an Indigenous Benefits Plan (IBP). The Contractor will have to include Indigenous businesses (or eligible joint ventures) as subcontractors or suppliers to this project. Further details will be provided in the Tender phase. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). Project background The scope of this work for this project includes: Infrastructure to accommodate approximately 25 personnel with an estimated total gross floor area of 928 m2; and All associated site work The site work includes, but is not necessarily limited to: Site preparation, excavation, foundations, framing, structural steel, miscellaneous metals, electrical, plumbing, mechanical, roofing, exterior finishes, glazing, insulation, drywall, painting, flooring, acoustical ceiling tiles, furnishings, doors and hardware, blinds, paving, landscaping. Documents Technical plans and specifications are not available during this RFEOI and will be provided during the Tender Phase; however, the Standard Construction Contract Documents for Electronic Bidding, DCL 250E, are available on DCC's website: https://www.dcc-cdc.gc.ca/industry/forms. Tenderers are advised that this contract is subject to DCC's Procurement Code of Conduct, which can be downloaded at https://www.dcc-cdc.gc.ca/industry/forms. A contractor or supplier who has been declared ineligible or suspended by Public Services and Procurement Canada under its Ineligibility and Suspension Policy and whose period of ineligibility or suspension may not have expired will not be able to proceed to the second stage. Bid security will be required during the Tender Phase in accordance with DCL193E- Instructions for Bidders for Electronic Bidding item 5. Estimate The estimate for this Contract is $11,467,000.00 (Current Year $). This amount includes all construction costs, on-site work (including all required services, parking, and landscaping), site utilities, necessary redundant mechanical systems, communication conduits and wiring, backup power equipment, built-in equipment, built-in furniture, and inflation to achieve substantial completion. This amount excludes GST, design costs, travel and disbursements, consultant fees and expenses, movable equipment and furniture, IT equipment and contingencies. Schedule DCC will proceed with the Tender Phase around December 18, 2025 The works shall reach substantial completion no later than 427 calendar days following the notification of contract award and shall be completed no later than 364 calendar days after the substantial completion date. Site visit No site visits will be offered during the RFEOI however, during the Tender Phase, bidders will be invited to a site visit. Access to information Act Tenderers are advised that DCC is subject to the provisions of the Access to Information Act (Canada). Information submitted may be eligible for disclosure in accordance with the requirements of the Act. Questions and clarifications Any questions or requests for clarification must be submitted in writing to DCC's Coordinator, Contract Services whose contact information can be found in the Electronic Bid System. DCC reserves the right to request clarification and/or confirmation regarding any aspect of this RFEOI to the Tenderer. In such a case, the Coordinator, Contract Services will be responsible for making the request. The request for clarification and/or confirmation will be sent to the contact person identified on the Electronic Submission System. Language of the Tender and the contract By submitting a response to this RFEOI, Tenderers will be invited to choose the desired official language for the tender documents and any resulting contract. In the Tender Phase, tender documents will be published in the language chosen by the Tenderer in the Electronic Bid System. Unless otherwise specified in the Contract, all Contract Documents to which the Contract applies or refers, as well as all deliverables, documents, reports and results of the work, services or goods that the Contractor submits, provides, or delivers to DCC or Canada in connection with the performance of the Contract, shall be in the language chosen by the Contractor on the Electronic Bid System. Joint venture A joint venture is an association of two or more parties that pools their funds, assets, knowledge, expertise, or other resources into a joint business venture, sometimes called a consortium, to bid together for a requirement. Tenderers submitting interest as a joint venture will be required to clearly indicate in the Electronic Submission System that they are forming a joint venture and should provide the following information: the name of the joint venture, if applicable, the name of the representative of the joint venture, i.e., the member chosen by the other members to represent them, if applicable, the name of each member of the joint venture. Security Requirements During Construction The Contractor will be required to hold, at all times during the performance of the construction contract, at least a valid Designated Organization Screening (DOS) issued by Public Services and Procurement Canada's (PSPC) Contract Security Program (CSP). In the case of a joint venture, all parties to the joint venture must hold at least a valid Designated Organization Screening (DOS). DCC has issued an Advance Procurement Notice (APN) number 84492 to allow contractors that do not hold a valid Designated Organization Screening (DOS) security clearance to initiate the sponsorship process prior to the launch of the tender phase. For information on the sponsorship process, consult the APN on MERX or visit https://www.dcc-cdc.gc.ca/industry/security-requirements. To be eligible to participate in the tender phase, a Tenderer who does not hold a valid Designated Organization Verification (DOS) clearance will be required to: have submitted a Sponsorship application prior to the date of publication of the Tender phase (second step Tender Phase) as indicated in the Electronic Bidding System (MERX); meet all material requirements of the sponsorship application package by the closing date of the tender call (Tender phase) as indicated in the Electronic Bidding System (MERX); and Have submitted a response to this RFEOI. ” sponsorship application” means the activity of having completed the questionnaire on the DCC web page and having forwarded the answers to the DCC Industrial Security Program (ISP)”. ” sponsorship application package” means the activity of completing and forwarding the following forms to the DCC Industrial Security Program (ISP): the Application for Registration (AFR) for Canadian legal entities form, the Company Security Officer form, the Security Agreement form, the Security Clearance form, the Fingerprints Applicant form, the Alternate Company Security form and the Personnel Screening form”. Failure to comply with these requirements will result in a tenderer not being allowed to participate in the tender phase. However, if DCC determines, in its sole discretion that the tenderer could not comply with these requirements because of an undue administrative delay on the part of CSP or DCC, DCC may, in its sole discretion, allow the tenderer to participate in the tender phase. Closing location Responses to this RFEOI must be received through the Electronic Bidding System.  Responses sent by fax, mail or email will not be accepted.  Closing Date and Time The closing date and time indicated in the Electronic Submission System will be the official closing date and time of this RFEOI.  Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

More opportunities from Government of Canada → Defence Construction Canada - Western Region

Same awarding agency

NAICS: 238210
International
Electrical Contractors Source List for Quick Response Tenders – CFB Edmonton, AB
Solicitation # ED26SL03_CN85912
Defence Construction Canada is seeking qualified electrical contractors to join a Quick Response Tenders source list for work at CFB Edmonton, Alberta, valid for three years from the date of establishment. Applications are limited to the Electrical category under Project No. ED26SL03 and must be submitted via email to Brett Cooper at [email hidden]; faxed or mailed forms will not be accepted. Contractors may apply at any time, but submissions are strongly encouraged by January 13, 2026, to ensure timely processing, which typically takes about ten days. The source list will be used to award contracts with an estimated value of up to $500,000, and the language chosen by the contractor during application will govern all future tender and contract documentation and communications for the duration of the listing. This solicitation follows the tendering procedures outlined in Chapter 5 of the Canadian Free Trade Agreement. While security clearance is not mandatory for inclusion on the list, contractors should be aware that awarded contracts may require organization-level Designated Organization Screening and personnel reliability status, and in some cases, Facility Security Clearance at the SECRET level with approved Document Safeguarding Certification. Performance on all contracts is evaluated using the DCL81-Performance Evaluation Guidelines, and failure to meet standards may result in removal from the source list. Bidding documents and contract details are available through Merx.com, with applicable fees, and further inquiries can be directed to the provided contact information.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

8 months ago

DEADLINE

in over 2 years
View Details
NAICS: 238220
International
Mechanical Contractors Source List for Quick Response Tenders – CFB Edmonton, AB
Solicitation # ED26SL01_CN85910
Defence Construction Canada is establishing a three-year Quick Response Tenders source list for mechanical contractors specializing in plumbing and heating services at CFB Edmonton, AB, under Project No. ED26SL01. Contractors must apply via email using the official source list application form, addressed to Brett Cooper at [email hidden]; submissions by fax or mail will not be accepted. Although applications can be submitted at any time during the source list’s validity, DCC strongly encourages submission by January 6, 2026, to ensure consideration before the list is finalized, with a standard 10-day processing time for inclusion. The source list will support contracts valued up to $500,000 and is governed by the Canadian Free Trade Agreement. Language selection submitted by the applicant will be binding for all tender, contract, and communication documents throughout the term of the list. While security clearance is not mandatory to join the source list, contractors should be aware that future projects may require Designated Organization Screening, reliability status, or higher-level clearances such as SECRET facility and personnel clearances with approved document safeguarding procedures. Performance is monitored using the DCL81 Performance Evaluation Guidelines, and failure to meet standards may result in removal from the source list. All bidding documents are accessible through Merx.com, subject to applicable fees, and further inquiries can be directed to the DCC Western Region office at [phone hidden] or the provided email address.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

9 months ago

DEADLINE

in over 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS