Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Request for Information Pursuant to FAR Part 15.201(e).

Active
N0016711I0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The document is a Request for Information (RFI) issued by NAVSEA, under the Department of Defense, seeking input from industry and academia on Smart Voyage Planning (SVP) technologies aimed at enhancing the current Navy Optimum Track Ship Routing (OTSR) system. This RFI does not constitute a solicitation or contract but serves as a means for government planning to gather insights on architectures, algorithms, sensor technologies, and products capable of improving fleet fuel efficiency and navigation safety by mitigating environmental hazards. The SVP Decision Aid (SVPDA) sought should be able to exceed current OTSR capabilities by integrating government hydrodynamic and environmental models and digital navigational charts, allowing route development ashore with export capability for import into shipboard navigation systems. The solution must address both classified and unclassified route planning, incorporate real-time environmental forecasts, and optimize routes for fuel savings, safety, and operational efficiency. Further, the SVP architecture must comply with Naval Oceanography Enterprise and Department of Defense information enterprise architecture standards, including the use of DODAF 2.0 constructs. Respondents are requested to provide company capabilities, prior relevant experience, descriptions of proposed technologies and concepts, system performance details, potential shortfalls, and any additional supporting information. Responses must adhere to specific formatting and submission requirements and be sent electronically by the stated deadline. All information submitted will be used for evaluation purposes only, with confidentiality protections in place as appropriate, but no contractual obligations or payments will arise from this request. The government reserves the right to use the information in any way it sees fit without obligation to participants.

General Info

NAVSEA requests industry input on Smart Voyage Planning technologies to enhance Navy ship routing efficiency and safety.

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance

MD

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nswc Carderock
ContactsNo contacts available
OfficeBETHESDA, MD, 20817-5700, USA
Office AddressBETHESDA, MD, 20817-5700, USA
ContactsNo contact information available

Full Description

Show more
1.0 DESCRIPTION 52.215-3 Request for Information or Solicitation for Planning Purposes (Oct 1997). (a) The Government does not intend to award a contract on the basis of this solicitation or to otherwise pay for the information solicited except as an allowable cost under other contracts as provided in subsection 31.205-18, Bid and proposal costs, of the Federal Acquisition Regulation. (b) Although “proposal? and “offeror? are used in this Request for Information, your response will be treated as information only. It shall not be used as a proposal. (c) This solicitation is issued for (see 1.1 below). 1.1 PURPOSE This is a Request for Information (RFI) and NOT a solicitation. NAVSEA is seeking Smart Voyage Planning (SVP) technologies suitable to improve upon current Navy Optimum Track Ship Routing (OTSR) processes in order to improve Fleet fuel efficiency while continuing to mitigate weather related hazards to safe navigation. Specifically, this RFI documents a Government request to industry and academia for information on architectures, approaches, products, technologies, and/or solutions for a Smart Voyage Planning Decision Aid (SVPDA). This includes information on algorithms, baseline navigation information, and sensor technologies which have the potential to meet or exceed the requirements herein. All interested sources are encouraged to respond. 1.2 BACKGROUND SVPDA solutions must be able to exceed current OTSR capabilities using U. S. Government furnished hydrodynamic and environmental models, Digital Nautical Charts (DNC) as well as authorized electronic navigational charts (ENC). Routes must be capable of being developed ashore and imported into shipboard Electronic Chart Display and Information System – Navy (ECDIS-N) or ECDIS. Initial Operation Capability (IOC) is envisioned in the FY12 timeframe. 1.3 CURRENT OTSR CAPABILITIES OTSR provides recommendations for minimum time loss and circumnavigation of environmental conditions that could cause excessive pounding, rolling, pitching, crew discomfort, cargo damage or hull fatigue. Recommendations may also provide favorable areas for conducting sea-sensitive operations. OTSR also provides: 1) Recommendations for assistance/avoidance when operating in the vicinity of strong ocean currents, such as the Kuroshio and the Gulf Stream. 2) Route surveillance and recommendations for damage avoidance for voyages in more restricted waters such as the Sea of Japan, South and East China Seas, or U.S. coastal routes when the ship has selected the route. The routing system provides the following at a minimum, today: 1) Route request receipt and handling. 2) Optimal route determination. 3) Ship movement monitoring and weather forecasting. 4) Generation of high winds and seas warning. 5) SURVEILLANCE, ADVISORY, and RECOMMENDATION Message formatting and transmission. 6) Management and access to ship platform information. 7) Display of situational awareness information. 1.4 SMART VOYAGE PLANNING OPEN ARCHITECTURE CONSIDERATIONS The SVP solution architecture will be required to align and comply with the Naval Oceanography Enterprise (NOe) Enterprise Architecture (EA). The NOe EA will assure alignment to the DON EA Hierarchy and with the priorities, principles, rules, and activities defined in the DOD Information Enterprise Architecture (DOD IEA) specification in order to assure movement to an effective net-centric solutions environment. Where the NOe EA does not provide adequate guidance, higher level architecture guidance specified by the DON EA Capstone and Reference Architecture Layers will need to be considered. In addition, compliance to DOD IEA “constraints and mechanisms? will need to be demonstrated where interactions with the net-centric environment are indicated in the solution. Specifically, solution architecture will need to be created that is expressed in DODAF 2.0 constructs and UML2 modeling conventions. Vendors should review and understand the DODAF 2 Data Model (DM2) and indicate willingness to document architecture products in compliance with this model. 2.0 DISCUSSION 2.1 TECHNICAL DISCUSSION The output of the SVPDA is a planned route that meets all Navy ship safety requirements, including known/charted hazards to navigation in addition to mitigating environmental hazards, and maximizes fuel efficiency while ensuring that the ship reaches its destination on or ahead of time. The SVPDA will be required to provide for both unclassified and classified route planning. It must be able to accept and automatically parse MOVEREPS, identifying the intended route, date/time of arrival, and the ship class. The ship class hull form and safety threshold values will be considered in route development as well as real time, authoritative environmental predictions for the intended route. Additional route optimization criteria such as “minimal hull stress? or “minimal ship motion? are also desirable features. The SVPDA will have the ability to quantify the savings from the optimized route, to include time, fuel, and risk from environmental hazards. This route will be developed ashore and a Navy “forecaster? will have the ability to re-run this optimization based on additional information and/or risk tolerances. The format of this route will be such that, once satisfied that the route meets all requirements, the ashore component can export the optimized route in a format compatible for import into ECDIS/ECDIS-N. Shipboard sensors and tools that can monitor onboard fuel consumption and sense the physical environment in real time would enhance the performance of a SVPDA and will be examined as part of a solution. 2.2 INFORMATION REQUESTED NAVSEA is requesting that the following items (where applicable) be provided: 1. A company description and discussion of company capabilities with respect to fulfilling the objectives outlined in this RFI. 2. A description of previous experience in the development of SVP systems. 3. A discussion of a SVPDA or SVP concept which has the potential to meet the performance requirements including a discussion of previous experience/accomplishments with the identified concepts and system error budgets. Available data collected on representative system platforms is also requested for analysis. 4. A description of the proposed technology, including a discussion of the proposed concept of operations, the input hydrodynamic and environmental parameter data needed, present and future users, production quantities, and present and predicted reliability. 5. An identification of shortfalls in the proposed solution relative to the performance requirements and an approach to improving the performance to meet requirements. 6. Provide any additional information that will assist in understanding your responses to the RFI. 3.0 STRUCTURE FOR RESPONSES Responses to this RFI should be in writing and should be in electronic copy form. Limit responses to a maximum of 30 pages. Respondents shall submit an electronic copy of the response in PDF. The entire submission must be received by 08 April 2011. The electronic copy must be formatted to print as typewritten on single-sided paper with one-inch margins on all sides and 1.5-spaced text. Use 12-point font with normal (uncondensed) spacing. The Navy may choose to meet with respondents to this RFI. A meeting would be intended to obtain further clarification of respondent capabilities and technical details. Submissions should identify a point of contact in case meetings are requested. Please submit information via e-mail to Timothy Schuler at contact@example.gov, phone +1 (555) 000-0000. 4.0 PROPOSAL INFORMATION, TECHNICAL DATA, AND OTHER INFORMATION NAVSEA Carderock will disclose respondent's information to only authorized government and non-government third-parties for purposes of evaluation. Information submitted in response to this RFI constitutes the respondent's written consent to such disclosure. Non-government third-parties will be required by the Government to sign a certificate of non-disclosure prior to their gaining access to the respondent's information. In accordance with FAR Part 15.201(e), this RFI is issued solely for information and planning purposes. It does not constitute a solicitation and should not be viewed as a request for proposal. All information received in response to this RFI that is marked “Proprietary? will be handled accordingly. Responses to the RFI will not be returned. The responses will not be considered offers and will not be accepted by the Government to form a binding contract. Responders are solely responsible for their expenses associated with responding to this RFI. NAVSEA Carderock reserves the right to accept, reject, or use without obligation or compensation, any information submitted in response to this RFI that is not proprietary. The Government does not commit to providing a response to any comment or questions.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → Nswc Carderock

Same awarding agency

NAICS: 541330
New
Federal
Synthetic Signature Generation (SSG) Support Services
Solicitation # N0016726R1006
The Department of the Navy, Naval Surface Warfare Center, Carderock Division (NSWCCD) is soliciting a single-award indefinite-delivery/indefinite-quantity (IDIQ) contract for scientific, engineering, and technical services to support Synthetic Signature Generation (SSG) based simulation systems. The scope includes the design, development, fabrication, integration, testing, fleet implementation, and maintenance of systems across five Navy fleet training categories: Submarine Team, Navigation, Surface, Surveillance, and On-Board. The contractor will operate within an Integrated Product Team (IPT) to provide technical engineering support to onsite maintenance personnel and support tactical testing and analysis for common simulation subsystems. The contract is structured with Cost-Plus-Fixed-Fee (CPFF) Level of Effort (LOE) CLINs and Cost Only Other Direct Costs (ODC) CLINs, with a total estimated labor requirement of 455,040 hours over a three-year period from August 10, 2027, to August 10, 2030. The procurement is a full-and-open competition evaluated on a best-value basis, prioritizing technical approach, management, and personnel over past performance and cost. Key requirements include a Top Secret facility clearance and Secret safeguarding for personnel, with specific Cyberspace Workforce (CWF) certifications aligned with DoDM 8570.01. Performance will be monitored via a Quality Assurance Surveillance Plan (QASP) using a rating scale from Exceptional to Unsatisfactory. Proposals must be submitted by November 9, 2026, and include detailed staffing plans and past performance narratives. The government has established a small business participation goal of 17 percent and requires the use of Wide Area Workflow (WAWF) for invoicing, with a 15 percent fixed fee withholding policy until a threshold of 100,000 dollars is reached.
Engineering Services

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 336611
New
Federal
Tailcone Studs
Solicitation # N0016727Q0001
The Naval Surface Warfare Center Carderock Division is seeking a small business contractor under NAICS code 336611 to manufacture and deliver 96 tailcone studs, organized as eight shipsets of 12 studs each. This firm fixed price contract requires the contractor to provide all labor, equipment, and materials to produce the hardware in accordance with specific technical drawings and ASME B1.3 System 21 thread acceptability standards. The contractor must maintain a quality system meeting ISO 9001:2015 or later and ensure all material certifications comply with DFARS specialty metals restrictions. Deliverables include the hardware, a digital final certification technical report, and certificates of conformance. The period of performance is three months from the date of award, with final delivery to West Bethesda, Maryland. Packaging requirements are stringent, requiring each shipset to be individually packaged with a hardcopy certification package and then consolidated into a single watertight, heavy-duty hard plastic container. Marking must adhere to MIL-STD-130 and MIL-STD-129, utilizing two-dimensional data matrix symbology for unique identification. Award will be granted to the responsible quoter with a technically acceptable quote deemed most advantageous based on price and past performance. The contract also mandates strict cybersecurity compliance, including CMMC requirements and the safeguarding of covered defense information.
Ship Building and Repairing

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 333415
New
Federal
NSWCCD York Chill Pump Replacement
Solicitation # N0016727Q1002
The Naval Surface Warfare Center, Carderock Division (NSWCCD) is soliciting quotes for the procurement, delivery, and turn-key installation of a replacement pump (Pump No. 1) for York Chiller No. 1 in Building 157. This equipment is critical for providing chilled-water cooling to the Building 13 Server Rooms. The project requires the removal of the damaged pump and the installation of a York Chill Pump, Model YLAA0080SJ46X, Serial SEMM-609950. Due to the proprietary nature of the equipment, the contractor must utilize certified Johnson Controls technicians or representatives. The installation must be completed on or before December 18, 2026, at the NSWCCD facility in Bethesda, Maryland. This is a brand-name restricted procurement under full and open competition and is not set aside for small businesses. The government intends to award a single firm-fixed-price purchase order based on the lowest price technically acceptable method, evaluating quotations on a pass/fail basis for technical requirements and considering past performance via the Supplier Performance Risk System. All quotes must be submitted on official company letterhead, including all-inclusive pricing and business size, and sent via email to the contract specialist and contracting officer by 09:00 AM EDT on November 06, 2026. The contract includes specific requirements for item unique identification per MIL-STD-130 and electronic invoicing through the Wide Area WorkFlow system.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 541330
New
Federal
RFP for Advanced Signatures Technologies (AST)
Solicitation # N0016726R3104
The Department of the Navy, Naval Surface Warfare Center Carderock Division (NSWCCD), is soliciting Advanced Signatures Technologies (AST) Support Services to integrate emerging software technologies into systems-of-systems for naval signatures tactical guidance, training, and synthetic simulation. The scope focuses on Big Data processing, cloud computing, predictive data analytics, and the development of software capabilities for Navy systems afloat and ashore. Technical requirements emphasize the use of Agile software development, DevSecOps, and adherence to Intelligence Community data standards. This effort involves both classified and unclassified programs, requiring personnel to hold Secret clearances at a minimum, with some roles requiring TS/SCI access. This requirement is a total small-business set-aside restricted to SeaPort-NxG Multiple Award Contract holders, with proposals submitted via the PIEE Solicitation Module. The contract is structured as a five-year period of performance consisting of a one-year base period and four one-year option periods. Pricing is based on a Cost-Plus-Fixed-Fee (CPFF) arrangement for labor and Cost No Fee for other direct costs. The total estimated level of effort over five years is approximately 200,640 hours for key personnel and 133,440 hours for non-key personnel. Award will be determined using a best-value trade-off approach, evaluating technical approach, management, personnel qualifications, and past performance.
Engineering Services

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS