Request for Proposals - Central Utility Building Purge Unit Replacement for Chiller No. 5 Fermi National Accelerator Laboratory, Batavia, Illinois

Closed
RFP380663CJFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
Federal
Galley Renovation at USCG Station Lake Tahoe
Solicitation # 30670PR260000032
Solicitation 30670PR260000032 is a firm-fixed-price request for proposal issued by the US Coast Guard Regional Support Team – Southwest for the renovation of a 210 square foot galley at Station Lake Tahoe in California. This project is a total set-aside for small businesses with an estimated magnitude between 25,000 and 100,000 dollars. The scope of work includes the demolition and removal of existing cabinetry, countertops, sinks, griddles, and freezer units, followed by the installation of new commercial-grade cabinetry, stainless-steel countertops, a sink and faucet assembly, a combination griddle/burner unit, and a commercial-grade freezer. The existing refrigerator must be preserved and integrated into the new layout. All plumbing, electrical, and gas work must be performed by licensed professionals in accordance with state and local codes. The contract requires performance to commence within 15 calendar days of award, with a mandatory completion period of 60 calendar days. Award will be based on the lowest priced technically acceptable offer, requiring a reasonable technical approach and complete pricing. Key safety and environmental requirements include compliance with OSHA Lead in Construction Standards due to lead-based paint in the southeast corner and adherence to EPA Section 608 regulations for refrigerant reclamation from the old freezer. Offerors must be registered in SAM.gov and provide a detailed pricing breakdown of materials, personnel, and equipment. Proposals must be submitted via email by September 18, 2026, and include a technical approach addressing all statement of work tasks.
Base ALAMEDA(00031)

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This project involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The objective is to replace corroded and obsolete HVAC equipment with high-quality, durable, and coastal weather-resistant systems that exceed commercial and industrial standards. The SCADA portion of the project requires replacing current software and installing two chemical feed pumps to ensure effective water production and wastewater management in compliance with Texas Commission of Environmental Quality standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between 1.2 million and 1.5 million dollars. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price. Key requirements include the submission of a Quality Control Plan, a one-year contractor warranty for installation and craftsmanship, and the appointment of a Project Manager with at least five years of recent federal contracting experience. The project is subject to the Davis-Bacon Act and requires performance and payment bonds. All personnel must undergo background checks to access the secure facility. The contractor is responsible for providing a detailed project schedule following the Notice to Proceed and must adhere to specific working hours, typically 7:00 AM to 3:30 PM. Proposals must be submitted by September 24, 2026, and include a detailed pricing breakdown by CSI division.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 14 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) 1091 – Glazing/Welding/Heavy Mechanics Bldg
Solicitation # 26-140
Adams and Associates, Inc. is soliciting a single lump sum contract to replace a failing 10-ton gas-fired packaged HVAC unit at the Atterbury Job Corps Center in Edinburgh, Indiana, specifically within Building 1091. The project requires the installation of a new 12.5 SEER packaged unit utilizing non-R22 refrigerants, such as R-410A or R-454B, while reusing existing ductwork, thermostat wiring, and electrical disconnects. The contractor must leave the old unit at the maintenance building for parts and provide labeled recovered refrigerant to the facility. Proposals are due by October 5, 2026, and require a mandatory site visit on September 23, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible bidders must possess a valid Indiana Contractor's License, an active SAM.gov registration with a Unique Entity ID, and provide proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must comply with EPA, OSHA, and Davis Bacon Act wage determinations. Deliverables include a sequenced construction schedule within 10 days of the notice to proceed, a one-year workmanship guarantee, and manufacturer product warranties. Final payment is contingent upon a successful substantial completion walk-through, submission of a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 14 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The solicitation RFP380663CJ calls for the replacement of the purge unit associated with Chiller No. 5 at the Central Utility Building on the Fermi National Accelerator Laboratory campus in Batavia, Illinois, requiring full labor, materials, equipment, and transportation to restore the chiller to operational status. The contract has been amended to specify a Firm Fixed Price (FFP) structure for both materials and services, eliminating prior Time and Materials pricing options. The proposal submission deadline has been revised to June 12, 2026, at 12:00 p.m. Central Time, with subsequent amendments requiring formal written acknowledgment via email to the Procurement Specialist, Caroline Jones, to avoid proposal rejection. Offerors must submit proposals electronically in three distinct parts: a Technical Proposal excluding pricing, a Pricing Schedule with required certifications, and a Past Performance section detailing three relevant projects completed within the past five years. All submissions must reference the correct solicitation number in the email subject line and adhere to strict formatting, with signed documents required in PDF format using certified digital signatures. The award will be made under a Lowest Price Technically Acceptable (LPTA) process, where proposals must first pass mandatory technical and past performance thresholds as acceptable or unacceptable. Technical compliance requires valid HVAC/chiller maintenance licenses, demonstrated experience servicing Trane chillers of comparable size and complexity, Trane certification, ability to procure OEM parts, a corporate quality control plan, and evidence of acceptable safety performance. Past performance must include three documented, relevant projects. Offerors must also submit the FermiForward Subcontractor Annual Representations & Certifications (SARC) and Proposal Certifications (PUR-466) with full compliance including SAM.gov registration, UEI, and export control or independent price determination certifications where applicable. Contract performance will begin June 29, 2026, under strict site access protocols, standard work hours of 1:00 p.m. to 5:00 p.m. Monday through Friday, and compliance with Title 10 CFR Part 851, NIST security policies, Buy American requirements, and trafficking in persons prohibitions. Insurance must meet A.M. Best A, VII or higher ratings, including $1 million general liability, automobile liability per ISO standards, and workers’ compensation at statutory limits, with certificates due prior to site access. All work must follow a strict quality assurance plan, including pre-work, in-process, and final inspections,

General Info

Removal, replacement, testing, and restoration of Chiller No. 5 at Fermilab, Batavia, Illinois.

Agency

Department Of Energy → Fermilab - DOE ContractorView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

(16)

FFDG Insurance Requirements for Onsite Non-Professional Services

PDFinsurance-requirements

RFP 380663-CJ Questions and Answers

PDFq-and-a

RFP 380663-CJ Central Utility Building Purge Unit Replacement

PDFrfp

FFDG General Terms and Conditions for Services

PDFcontract-document

Pricing Schedule for Central Utility Building Purge Unit Replacement

XLSXpricing-schedule

Attachment+I+-+WD+-+Illinois+Kane+SCA+2015-5741+Rev.+27+12-03-2025.pdf

PDF

Pricing Schedule for Central Utility Building Purge Unit Replacement

PDFpricing-schedule

Exhibit A for Subcontractor Safety Other Than Construction - CUB Install Purge Unit on Chiller #5

PDFsow

SOW for Central Utility Building Purge Unit Replacement - Chiller No. 5

PDFsow

Amendment 02 to RFP 380663-CJ for Central Utility Building Purge Unit Replacement

PDFamendment

Section 014200 Quality Requirements for Services

PDFsow

Amendment 01 to RFP 380663 Central Utility Building Purge Unit Replacement

PDFamendment

Fermi Forward Discovery Group Subcontractor Annual Representations & Certifications

PDFsubcontractor-annual-reps-certs

PUR-466 Proposal Certifications Revision 5

PDFproposal-certifications

FFDG General Terms and Conditions for Time and Materials Subcontracts

PDFcontract-document

Amendment 03 to RFP 380663 Central Utility Building Installation

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts2 people available
OfficeBatavia, IL, 60510, USA
Organization / Agency
Department Of Energy → Fermilab - DOE Contractor
View Agency Profile
Office AddressBatavia, IL, 60510, USA
Contacts

Full Description

Show more

**************************


AMENDMENT 03


Changes were made to the Request for Proposal and Proposal due date revised to June 19, 2026 at 12:00 p.m. CT. Please see Amendment 03 and uploads.


Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror’s proposal.


**************************


AMENDMENT 02 


Changes were made to the Request for Proposal. Please see Amendment 02 and uploads.


Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror’s proposal.


**************************


AMENDMENT 01 


Overview - Proposal due date revised to June 12, 2026. Amendment 01 uploaded. 


Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror’s proposal.


**************************


The Offerors shall provide services to remove, replace, test and return Chiller No. 5 to operational condition at the Central Utility Building (CUB) on Fermi National Accelerator Laboratory (Fermilab) campus, in Batavia, Illinois. The Offerors shall furnish all labor, supervision, materials, tools, equipment, transportation and items required to perform these services.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236220
New
Federal
MINOS High Bay Roof Replacement & Masonry Wall Repair
Solicitation # ISD_384202_DA
Fermi Forward Discovery Group, LLC is soliciting proposals for a firm fixed price subcontract to perform the removal and replacement of one high bay roof and masonry wall repairs at the MINOS Service Building located at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work is divided into two phases, featuring the installation of a Sika Sarnafil adhered PVC roofing system meeting FM RoofNav requirements and extensive masonry repairs including tuckpointing, brick replacement, and coping stone restoration. This is a total small business set-aside under NAICS code 236220. Proposals are due by 5:00 PM CT on October 6, 2026, and must be submitted in two separate volumes: a technical proposal and a business management and price proposal. The award will be based on a competitive best value with tradeoffs, prioritizing technical criteria over price. Evaluation factors include project approach, safety compliance, past performance—specifically requiring three Sarnafil adhered PVC projects within the last five years—and organizational structure. Key requirements for the selected subcontractor include providing performance and payment bonds, adhering to Davis-Bacon wage standards, and maintaining specific insurance coverages. Additionally, the contractor must comply with the Buy American Act and strict site safety protocols, including the submission of OSHA 300 logs and ES&H certifications. Site visits were scheduled for September 9 and September 16, 2026, to facilitate accurate bidding.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 24 days
View Details
NAICS: 541380
New
Federal
RFP For PORTABLE PHASED ARRAY ULTRASONIC FLAW DETECTOR FOR NDT INSPECTION
Solicitation # RFP386950
Fermi Forward Discovery Group, LLC (FFDG) has issued Request for Proposal RFP 386950 for the procurement of one portable phased array ultrasonic flaw detector for non-destructive testing (NDT) inspection of welds at the Fermi National Accelerator Laboratory (Fermilab). This is a firm-fixed-price subcontract opportunity with a submission deadline of September 21, 2026. The award will be based on a best value source selection, specifically the lowest price from technically acceptable and responsible offerors. The equipment must be genuine, new, and unused, with delivery terms specified as F.O.B. Fermilab to the Receiving Warehouse 2 in Batavia, Illinois, including all freight charges in the quotation. The subcontract is governed by the FFDG General Terms and Conditions for Commercial Products and Commercial Services (08.2025) and incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses. Key requirements include compliance with the Buy American Act, whistleblower protections, and workplace substance abuse programs. Offerors must submit a completed RFP page along with the Subcontractor Annual Representations and Certifications (SARC) and the PUR-466 Proposal Certifications. All contractual inquiries and submissions are directed to Procurement Specialist Patrick Tarpey.
Testing Laboratories and Services

POSTED

3 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS