Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for White Papers: High-Performance Compressor System

Closed
FA910126RWP_HPCFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333912
New
Federal
Portable Special-Purpose High-Purity Nitrogen Generation Systems
Solicitation # N4523A27RFI0801
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility is conducting market research via Request for Information N4523A27RFI0801 to acquire portable, special-purpose high-purity nitrogen generation systems. The government is seeking a ruggedized, turn-key solution housed within a single ISO 668 Type 1C 20-foot heavy-duty intermodal shipping container that is weather-sealed and salt-air corrosion resistant. Technical requirements specify the system must produce nitrogen with oxygen purity levels below 50 ppm, deliver pressures up to 4,500 psig, and feature a dual-mode feed air architecture, a high-pack booster compressor, and an automated supply manifold. The system must be capable of 180 days of continuous operation without scheduled servicing and 7-day autonomous operation in an unmanned outdoor shipyard environment. The contemplated acquisition strategy is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing streamlined commercial procedures under FAR Part 12 and FAR Part 15. The government intends to procure two initial First Article Test units for qualification and NRTL inspection, followed by up to ten production units ordered via firm-fixed-price delivery orders. The scope includes on-site turnkey delivery, commissioning, operational verification at the Bremerton, Washington facility, 24 months of spare consumable parts, and optional multi-year maintenance agreements. Source selection is expected to be based on Best Value with Tradeoffs or Lowest Price Technically Acceptable, evaluating technical capability, reliability, delivery schedules, and past performance.
Puget Sound Naval Shipyard IMF

POSTED

about 16 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Air Force Test Center’s Installation Contracting Division at Arnold Air Force Base is seeking white papers from industry partners under a 10 U.S.C. § 4022 Other Transaction Prototype agreement to develop an Analysis of Alternatives and deliver a prototype High-Performance Compressor System capable of providing high-pressure, high-mass-flow air. This effort targets a critical capability gap and is structured in three phases: Phase I involves comprehensive design, including a final system design package, Process and Instrumentation Diagram (P&ID) compliant with ANSI/ISA-5.1, and a functional digital model; Phase II is an optional manufacturing effort producing a prototype using a production or limited-run unit to validate high-risk components along with maintenance manuals and a spare parts list; Phase III is optional and includes on-site engineering support during government-led installation and testing at Coopertown, Tennessee. All responses must be submitted as a 20-page PDF by June 15, 2026, at 1:00 PM Central Time to Brooke Vandeman, the Agreements Officer. Proposals must include company identification, technical approach, risk assessment, corporate experience with complex rotating machinery, a notional schedule across all phases, and a Rough Order of Magnitude cost estimate in WBS Level 2 format. At least one-third of the total project cost must be covered by non-federal sources, and vendors must demonstrate compliance with 10 U.S.C. § 4022 by either including a nontraditional defense contractor or nonprofit research institution, ensuring all significant participants are small businesses or nontraditional contractors, or meeting the cost-sharing requirement. Access to the Statement of Objectives, classified as Controlled Unclassified Information with Export Control restrictions, requires a current NIST SP 800-171 assessment in SPRS and certification in the Joint Certification Program. Respondents must grant the Government Purpose Rights to all technical data, drawings, and models, including a Level 3 Technical Data Package and a 20-year life-cycle cost analysis. The estimated total project value ranges from $500,000 for Phase I alone to $50.7 million inclusive of all phases, though this is for planning purposes only. White papers will be evaluated on technical approach clarity, understanding of objectives, and the credibility of the path toward high operational utility, with selected respondents potentially invited to present further details.

General Info

Soliciting White Papers for prototype high-performance compressor system design, testing, strict security, due May 26, 2026.

NAICS

333912 - Air and Gas Compressor Manufacturing

Place of Performance

COOPERTOWN, TN, USA

Set-Aside

NONE

Documents

2

Request for White Paper - High-Performance Compressor System Prototype

PDF, High priority: read this firstrwp
High

Request for White Paper - High-Performance Compressor System Prototype

PDF, High priority: read this firstrwp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from May 26, 2026 to Jun 15, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts2 people available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Brooke Vandeman

Full Description

Show more

The Air Force Test Center’s Installation Contracting Division (AFTC/PZI) at Arnold Air Force Base (AFB) is seeking White Papers from interested parties capable of meeting the Government’s requirement for an Analysis of Alternatives and the design, manufacture, and testing of a Prototype High-Performance Compressor System. This effort is issued under the authority of 10 U.S.C. § 4022 for Other Transaction Prototype (OTP) agreements.


The primary goal of this RWP is to identify potential solutions and innovative approaches to meet the technical objectives detailed in the attached Statement of Objectives (SOO), Attachment 1. The focus of the white paper should be on a comprehensive approach that validates critical design elements and ensures the successful integration and long-term sustainment of the final system. The Government will use the submitted White Papers to assess industry capabilities, refine project requirements, and select vendors for a potential future Request for Prototype Proposal (RPP). See attachment to this posting for full details. 


Note on SOO: The SOO is Controlled Unclassified Information (CUI), Distribution C, and Export Controlled. To receive a copy, vendors must have a current (no more than three years old from the posting of this request) basic NIST SP 800-171 assessment in the Supplier Performance Risk System (SPRS) and be a certified contractor in the Joint Certification Program (JCP). Please contact the Agreements Officer to request the document and verify certification.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS