This Solicitation opportunity from Utah was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Engineers Estimate: $45,000.00
The purpose of this IFB is to enter into a contract to provide:The Utah Division of Purchasing is accepting bids for the Reclamation Construction Sowbelly Gulch Project. The WORK consists of the closure of 1 abandoned mine, maintenance of 4 previously closed abandoned mines, and revegetation of disturbed areas at abandoned coal mines in Carbon County, Utah.
Mandatory Site Visit: Vendor MUST attend the pre-bid meeting (site visit:) See Attachment 007959_specs_complete for details (See also Pre-Bid Meeting (Site Visit.). Vendors will then travel to other sites. (Please see the coordinates for the Pre-Bid, Site Visit: Here are the coordinates: 39.699968, -110.921501)
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
Length of Contract: The WORK under this CONTRACT shall be commenced upon notice to proceed and shall be completed within 14 calendar days after the date of email delivery, date of hand delivery, or date marked on registered mail receipt of said Notice to Proceed and no later than August 31, 2026 . WORK delays caused by weather may, at the discretion of the OWNER, extend the completion date. CONTRACTOR also agrees to the liquidated damages provisions of Article 12.
Vendor must guarantee its pricing through the completion of the project.
More opportunities from Utah
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
