This Solicitation opportunity from California was posted on June 29, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Bid No. 5117 - Addendum 2: McClellan-Palomar Airport Access Stairway: Addendum 2 dated July 26, 2011, for Bid No. 5117 (Oracle Project No. 1013289) regarding the construction of the McClellan-Palomar Airport Access Stairway. This document corrects an omission in the bid package by adding the required 'Representations and Certifications' form (Page 2-6a), which bidders must execute and submit with their offers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 5117 Addendum 3 - McClellan-Palomar Airport Access Stairway: Addendum 3 dated July 27, 2011, for Bid No. 5117 (Oracle Project No. 1013289). This document provides clarifications to the contract documents, specifically modifying project plan sheets 1 and 6 regarding San Diego Regional Standard Drawing M-26 and removing page 8-31 from the contract documents.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid No. 5117: Construction of McClellan-Palomar Airport Access Stairway: This is a bid package for the construction of the McClellan-Palomar Airport Access Stairway (Oracle Project No. 1013289) for the County of San Diego Department of Public Works. The document includes bidding information, required execution documents (bid schedule, certifications, bonds), special conditions, FAA technical provisions, and federal requirements for federal aid construction projects. The bid opening date was July 28, 2011.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid No. 5117 - McClellan-Palomar Airport Access Stairway: This document is a formal proposal and bid package for the construction of the McClellan-Palomar Airport Access Stairway (Oracle Project No. 1013289), issued by the County of San Diego Department of Public Works. It includes a detailed bid schedule with 15 line items (including mobilization, excavation, and landscaping), prequalification requirements per FAA Advisory Circular 150/5370-10, and a Public Contract Code Section 10162 questionnaire. The document specifies that bids must be submitted with evidence of competency and financial responsibility to be deemed responsive.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid No. 5117 - McClellan-Palomar Airport Access Stairway: This document is a bid proposal and bid schedule for the construction of the McClellan-Palomar Airport Access Stairway (Oracle Project No. 1013289) for the County of San Diego Department of Public Works. It includes a detailed bid schedule with 15 line items, prequalification requirements per FAA Advisory Circular 150/5370-10, and a Public Contract Code Section 10162 questionnaire.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 5117 - McClellan-Palomar Airport Access Stairway Addendum 1: Addendum 1 dated July 25, 2011, for the construction of the McClellan-Palomar Airport Access Stairway (Oracle Project No. 1013289). This document modifies the contract by replacing specific pages in Part 6 and Part 4, primarily to update the Davis Bacon federal wage rate determinations (General Decision Number: CA100001).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for County Stairs Project Geotechnical Evaluation - McClellan-Palomar Airport: A geotechnical evaluation report prepared by Ninyo & Moore for Kimley-Horn and Associates, dated May 1, 2009. The document provides subsurface exploration findings, soil analysis, and design recommendations for the construction of a new set of stairs at McClellan-Palomar Airport in Carlsbad, California, including seismic design factors and foundation recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for McClellan-Palomar Airport Access Stairway Project - Community Health and Safety Plan: A Community Health and Safety Plan (CHSP) prepared by Ninyo & Moore for Kimley-Horn & Associates, dated July 9, 2010. The document outlines measures to protect the public and surrounding land uses from health hazards during excavation and construction of an access stairway at the McClellan-Palomar Airport in Carlsbad, California. It includes sections on air monitoring, control methods for dust and vapors, emergency planning, and site security.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for McClellan-Palomar Airport Access Stairway Project - Soil Management Plan: Prepared by Ninyo & Moore for Kimley-Horn & Associates on July 9, 2010, this Soil Management Plan (SMP) establishes protocols for the excavation, stockpiling, handling, and disposal of soil and waste materials encountered during the construction of an access stairway at the McClellan-Palomar Airport in Carlsbad, California. The document includes site descriptions, project team roles, and guidelines for waste characterization and transport to ensure compliance with County of San Diego and federal regulations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Palomar Airport Landfill Gas Collection System - Specifications/Plans: Technical drawings and specifications for the Landfill Gas Collection System and Ancillary Facilities at Palomar Airport Landfill in Carlsbad, CA. Prepared by Metcalf & Eddy, Inc. for the County of San Diego Department of Public Works, the document includes a drawing index, site plans, manifold profiles, and a detailed well schedule specifying depths and coordinates for horizontal and vertical collection wells.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Palomar Airport Landfill Monitor Well Locations Figure 2-1: A technical figure (Figure 2-1) from Geosyntc Consultants dated February 2006 for Project No. SC0226. The document provides a map of monitor well locations, including deep and shallow monitor wells, subdrain locations, and a subdrain sump at the Palomar Airport Landfill in Carlsbad, California.
PDF
PDF, High priority: read this firstaward
HighAI Summary for RFB 5117 - Construction of McClellan-Palomar Airport Access Stairway: This document contains a Notice of Intent to Award for RFB 5117 regarding the construction of the McClellan-Palomar Airport Access Stairway for the County of San Diego. Dated August 2, 2011, it identifies SD&B Construction, Inc. as the intended awardee following a preliminary evaluation of bids. The file also includes a bid abstract showing ranked bidders and a detailed bid schedule with unit prices for items such as concrete, stairs, and landscaping.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 5117 Plan Set - County Stairs Project: Technical specifications and plan set notes for the County Stairs Project at McEllian-Palomar Airport. The document includes critical environmental monitoring requirements for work near an old landfill (VOCs, methane, H2S), structural steel fabrication and erection standards conforming to AISC and AWS, and a summary of required special inspections for steel construction.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid #5117 - McClellan-Palomar Airport Access Stairway Planholders List: A planholders list for Bid #5117, McClellan-Palomar Airport Access Stairway, dated July 2011. The document lists general contractors and subcontractors who have obtained bid documents, including company names, contact persons, addresses, and phone numbers.
PDF
PDF, Low priorityspecifications
LowAI Summary for Figure 2-1: Monitor Well Locations - Palomar Airport Landfill: A technical figure (Figure 2-1) from February 2006, Project No. SC0226, detailing the locations of deep and shallow monitor wells, subdrain locations, and sumps at the Palomar Airport Landfill in Carlsbad, California.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for RFB 5117 - McClellan-Palomar Airport Access Stairway Planholders List: A planholders list dated July 2011 for the McClellan-Palomar Airport Access Stairway project (RFB 5117), detailing general contractors who have requested project documents, including contact names, addresses, and phone numbers.
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.