This Solicitation opportunity from California was posted on May 17, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Cajon Air Center at Gillespie Field - Contractor Health and Safety Plan: Health and Safety Plan (HASP) dated May 6, 2016, prepared by Ninyo & Moore for Kimley-Horn and Associates, Inc. regarding the Cajon Air Center project at Gillespie Field, CA. The document outlines site descriptions, scope of work for taxiway and apron construction, and detailed hazard analyses covering physical, industrial, chemical, and biological risks, along with PPE and emergency response protocols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cajon Air Center Soil and Groundwater Sampling Analysis Results: A technical report from Ninyo & Moore dated May 2016 regarding soil and groundwater sampling analysis for the Cajon Air Center at Gillespie Field Hydromodification Vault Project. The document details the detection of TPH, PCBs, and VOCs, providing specific analytical results and recommending the implementation of the Soil and Groundwater Management Plan during construction and dewatering activities.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Cajon Air Center Underground Detention Basin Bid No. 7442: Request for Bids (RFB No. 7442) issued by the County of San Diego Department of Public Works for the Cajon Air Center Underground Detention Basin project. The document includes bidding information, a 3% DVBE participation goal, site inspection details (May 26, 2016), and a bid opening date of June 09, 2016. It contains a comprehensive table of contents covering bidding documents, execution requirements, and special technical provisions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cajon Air Center Underground Detention Basin - Cross Sections: Technical drawing document from the County of San Diego Department of Public Works providing profile views of cross-sections (1 through 9) for the Cajon Air Center Underground Detention Basin project.
PDF
PDF, High priority: read this firsthealth-and-safety-plan
HighAI Summary for Contractor Health and Safety Plan - Cajon Air Center at Gillespie Field: Dated May 6, 2016, this Contractor Health and Safety Plan (HASP) was prepared by Ninyo & Moore for Kimley-Horn and Associates, Inc. regarding the Cajon Air Center project at Gillespie Field in El Cajon, California. The document outlines site descriptions, scope of work for taxiway and apron extensions, and comprehensive hazard analyses including physical, industrial, chemical, and biological risks. It provides critical safety protocols, personal protective equipment (PPE) requirements, and emergency response procedures for personnel operating on-site.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for County of San Diego DPW - Cross-Section Sheet 5A (Addendum 1): Technical drawing sheet containing profile views of cross-sections 10 through 14 for a stockpile area. Issued by the County of San Diego Department of Public Works as part of Addendum 1 for RFB 7442.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Evaluation - Cajon Air Center at Gillespie Field: A geotechnical evaluation report dated May 11, 2016, prepared by Ninyo & Moore for Kimley-Horn and Associates. The document provides findings, conclusions, and technical recommendations for the design and construction of airfield improvements at the Cajon Air Center at Gillespie Field in El Cajon, California, including subsurface exploration, seismic design considerations, and earthwork specifications.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 7442 - Cajon Air Center Underground Detention Basin: This document is a bid submission and abstract for RFB 7442, dated June 9, 2016, for the construction of the Cajon Air Center Underground Detention Basin for the County of San Diego. It includes a bid abstract listing multiple offerors and a detailed bid proposal from Palm Engineering Construction Company, Inc., featuring a comprehensive bid schedule with unit prices for various FAA specifications and construction items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 7442 Cajon Air Center Underground Detention Basin - Addendum No. 1: Addendum No. 1 dated May 31, 2016, for the County of San Diego RFB 7442. This document modifies the project plans by replacing several plan sheets (7, 11, 14, 15, 16, and cross-section 5) and adds references to subsurface investigation reports, including a Health and Safety Plan and Soil and Groundwater Management plans prepared by Ninyo & Moore.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 7442 Cajon Air Center Underground Detention Basin - Addendum No. 2: Issued June 1, 2016, by the County of San Diego, this Addendum No. 2 to RFB 7442 provides critical clarifications via a Q&A section regarding groundwater treatment costs, soil and groundwater sampling results, soil management plans, and excavation payment terms for the Cajon Air Center Underground Detention Basin project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 7442 Cajon Air Center Underground Detention Basin - Addendum No. 3: Addendum No. 3 dated June 6, 2016, for the County of San Diego RFB 7442 regarding the Cajon Air Center Underground Detention Basin. This document modifies technical specifications for dewatering systems, updates the list of subsurface investigation reports, and incorporates the Contractor Health and Safety Plan and Soil and Groundwater Management Plan into Part 8 of the contract documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 7442 Cajon Air Center Underground Detention Basin - Addendum No. 4: Issued June 7, 2016, Addendum No. 4 for RFB 7442 (Cajon Air Center Underground Detention Basin) provides clarifications via a Q&A section. Key updates include confirmation of a 3% DVBE participation requirement for projects exceeding $1 million, guidance on contaminated groundwater treatment, rock removal methods, system watertightness, and soil management/stockpiling procedures for clean and impacted soils.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 7442 Fullsize Project Plans - Drainage and Soil Management: Technical project plans and specifications for RFB 7442, detailing drainage construction notes (RCP storm drains, precast concrete detention basins), easement legends for SDG&E, and a comprehensive soil management plan for the 70-acre Gillespie Field property (former Cajon Speedway) in San Diego County, California.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 7442 Plan Sheets Addendum 1: This document is Addendum 1 for RFB 7442, providing updated or additional plan sheets for the procurement. It contains critical technical specifications and design drawings necessary for bid preparation.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB No. 7442 - Cajon Air Center Underground Detention Basin Proposal: This document is the 'Documents to be Executed by Bidder' section for RFB No. 7442, issued by the County of San Diego Department of Public Works. It includes the formal proposal for the construction of the Cajon Air Center Underground Detention Basin (A.I.P. No. 3-06-0212-026-2016). The file contains a detailed bid schedule with 29 line items, including excavation, storm drain installation, and concrete work, as well as legal certifications regarding non-collusion and bond requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Soil and Groundwater Management Plan - Cajon Air Center Phase I: Dated May 10, 2016, this Soil and Groundwater Management Plan (SGMP) provides technical guidance for the Cajon Air Center Phase I Hydromodification Vault Project at Gillespie Field, El Cajon, CA. Prepared by Ninyo & Moore for Kimley-Horn, the document outlines procedures for soil excavation, monitoring, segregation, and groundwater disposal to ensure compliance with the County of San Diego Department of Environmental Health (DEH) requirements during construction.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Soil and Groundwater Management Plan - Cajon Air Center Phase I: Prepared by Ninyo & Moore on May 10, 2016, this Soil and Groundwater Management Plan (SGMP) provides guidance for the Cajon Air Center Phase 1 – Hydromodification Vault Project at Gillespie Field Airport in El Cajon, California. The document outlines procedures for handling contaminated soil and groundwater, including site characterization, soil excavation, monitoring, segregation, and disposal, to ensure compliance with the County of San Diego Department of Environmental Health (DEH) requirements.
TXT
TXT, Low priority1 page · award
LowAI Summary for Award Letter - PO 554370 - Sukut Construction Inc: Award notification for PO 554370 to Sukut Construction Inc for the Cajon Air Center Underground Basin project. The blanket contract is valued at $4,823,805.50 with a performance period from September 29, 2016, to November 28, 2016.
PDF
PDF, Low prioritysite-visit-log
LowAI Summary for Bid 7442: Cajon Air Center Underground Detention Basin Site Visit Sign-In Sheet: A sign-in sheet from a site visit conducted on May 25, 2016, at Gillespie Field Airport for the Cajon Air Center Underground Detention Basin project (Bid No. 7442, Oracle Project No. 1010625). The document lists attendees from various companies and government departments.
PDF
PDF, Low priority1 page · planholders-list
LowAI Summary for Bid 7442 - Planholders List - Cajon Air Center Underground Detention Basin: A planholders list dated May 27, 2016, for Bid #7442 regarding the Cajon Air Center Underground Detention Basin project. It identifies registered bidders, including TC Construction Company Inc., ahead of the June 9, 2016 bid date.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Cajon Air Center Underground Detention Basin Bid 7442 Planholders List: A planholders list dated June 7, 2016, for Bid #7442 regarding the Cajon Air Center Underground Detention Basin. The document lists companies that have obtained bid documents, including TC Construction Company Inc., Rummel Construction, Inc., Palm Engineering Construction Company, Inc., and Wier Construction.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Cajon Air Center Underground Detention Basin (Bid #7442) Planholders List: A planholders list dated June 1, 2016, for Bid #7442 regarding the Cajon Air Center Underground Detention Basin. The document lists companies that have obtained bid documents, including TC Construction Company Inc., Rummel Construction, Inc., and Palm Engineering Construction Company, Inc., with a bid date of June 9, 2016.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Cajon Air Center Underground Detention Basin Planholders List: A list of registered planholders for the Cajon Air Center Underground Detention Basin project, dated June 8, 2016. It includes contact information for five general contractors: TC Construction Company Inc., Rummel Construction Inc., Palm Engineering Construction Company Inc., Wier Construction, and Sukut.