Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kentucky was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB-785-2700000114-1 | RFB-79-27 DMA WHFRTTC Underground Electric Phase III

Closed
RFB-785-2700000114-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Muninet Fiber Maintenance and Repair
Solicitation # BD-26-1306-NAED-NAED-135002
The North Attleborough Electric Department is soliciting quotes for on-call labor to perform repairs and splicing of its fiberoptic network cabling, covering approximately 40 miles of aerial, underground, and interior installations. The contract spans a three-year service period from January 1, 2027, to December 31, 2029. Selected contractors must provide all necessary supervision, labor, and incidental services, including the disposal of damaged fiber. Bidders are required to submit annual on-call availability fees for each year of the contract, as well as hourly rates for emergency mobilization across various crew and vehicle types for normal, after-hours, holiday, and weekend shifts. Strict safety and compliance standards are mandated, including adherence to the National Electric Safety Code and OSHA Regulation 1910.269, with required certifications in cardiopulmonary and first aid training. All vehicles used in power spaces must be insulated platforms meeting ANSI A92.2-1990 standards, with dielectric testing results provided every 12 months. Financial and legal requirements include a payment bond for 50 percent of the total estimated contract price if the three-year total reaches or exceeds 25,000 dollars, and compliance with Massachusetts prevailing wage rates per M.G.L. Chapter 149. Insurance requirements are comprehensive, requiring 1 million dollars each for general liability, auto liability, and workers compensation, with a 5 million dollar excess or umbrella policy. Proposals are due by November 20, 2026, and must include an anti-collusion certification, tax payment certification, and three professional references.
Town of North Attleboro

POSTED

about 23 hours ago

DEADLINE

in 17 days
NAICS: 237130
New
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Solicitation RFP-383167-CD is a firm fixed price contract for the rebuild and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. The project is critical to Fermilab's mission, as the KRS provides electricity for both conventional facility needs and process utility requirements. The scope of work includes the demolition of existing buildings, equipment, and feeders, the construction of a new control building on the existing foundation, and comprehensive civil utilities upgrades and pavement renovation. The general contractor is responsible for providing all supervision, labor, materials, and quality control necessary to complete the project. Construction is strictly constrained by the Fermilab accelerator shutdown window, anticipated to run from January 1, 2028, to January 1, 2030. Key project milestones include the completion of submittals and shop drawings within 60 days of the Notice to Proceed, the start of on-site work by January 4, 2028, the completion of the building foundation by March 31, 2028, and the formal issuance of the Authorization for Use and Possession by July 2, 2029, with final project completion due by September 30, 2029. Award selection is based on best value with tradeoffs, where technical factors—specifically organizational structure, key personnel, and experience with government agencies or DOE laboratories—are significantly more important than cost. Offerors must meet strict pass-fail financial requirements, including a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars. The contract adheres to various federal regulations, including the Davis-Bacon Act for wages, the Buy American Act for materials, and FAR requirements for reporting payments and combating trafficking in persons.
Fermilab - DOE Contractor

POSTED

about 24 hours ago

DEADLINE

in about 2 months
NAICS: 237130
New
SLED
Seaflower Energy Storage System Project
Solicitation # PLN 25-0027
The Seaflower Energy Storage System Project, identified by solicitation number PLN 25-0027, involves the construction and operation of a 100 MW / 400 MWh utility scale battery energy storage system in Menifee, California. The facility will utilize lithium iron phosphate or similar battery modules arranged on racks within individual containers, including 102 SolBank 3.0 enclosures. The system is designed to interconnect with the Southern California Edison Valley Substation and will feature automated monitoring and remote management systems, eliminating the need for permanent onsite staff. Site infrastructure will include power conversion equipment, a security fence or wall, and a permanent parking area for periodic maintenance and inspection visits. The project has undergone extensive environmental and technical evaluations, including a Mitigated Negative Declaration, geotechnical investigations, and a Hazard Mitigation Analysis to ensure compliance with the 2022 California Fire Code. Assessments have covered air quality, greenhouse gas emissions, noise levels, and biological resources across the approximately 4 acre site. Cultural resource surveys indicate a low to moderate potential for archaeological deposits, necessitating monitoring during ground disturbance. Traffic analysis suggests minimal impact, with an estimated 9 daily trips. The City of Menifee Planning Commission scheduled a public hearing for October 28, 2026, following a public review period that concluded on October 21, 2026.
City of Menifee

POSTED

1 day ago

DEADLINE

N/A

AI Contract Overview

Show more

The Commonwealth of Kentucky, through the Department for Facilities and Support Services, has issued Request for Bid RFB-79-27 (Solicitation RFB 785 2700000114) for the Underground Electric Phase III project at the Wendell H. Ford Regional Training Center in Greenville, Kentucky. The scope of work involves replacing existing overhead primary electric with KU installed underground primary electric, which includes installing raceways for primary electric and site lighting fixtures, reworking secondary electrical services for designated buildings, and installing KU furnished pull boxes, single phase transformer bases, and concrete pads for three phase transformers. Bids are due by September 22, 2026, at 13:30 and must be submitted exclusively online via the eProcurement system. Bidders are required to enter 0.00 for the contract amount in the electronic system and instead provide the actual bid amount on a separate Official Bid Document, which must be uploaded as a single PDF along with any required bid bonds. A critical requirement of this contract is the delivery of digital survey data of the underground electric systems in AutoCAD, GIS, or GPS geospatial formats. This data must be georeferenced using the Kentucky State Plane coordinate system with the NAD83 or NAD83 2011 datum and must include routing information, locations of all handholes and transformers, and documented utility conflicts. Final payment will be withheld by the State of Kentucky until this digital data is delivered to a KY-DMA representative. Addendum One, issued September 15, 2026, further modifies the project by introducing a new utility drawing, updating Sheet SE209 to include a 4-inch conduit stub, and providing responses to bidder inquiries. The primary point of contact for this solicitation is Susan Ward.

General Info

Kentucky RFB-79-27 for underground electric installation at Wendell H. Ford Training Center.

Documents

2
DOWNLOAD, High priority: read this firstrfb
High
DOWNLOAD, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Finance Facilities/Support Svc
Contacts2 people available
OfficeOther, KY, USA
Office AddressOther, KY, USA
Contacts
Finance Facilities/Support Svc

Full Description

Show more
RFB-79-27 DMA WHFRTTC Underground Electric Phase III

More opportunities from Kentucky → Finance Facilities/Support Svc

Same awarding agency

NAICS: 238160
New
SLED
RFB-785-2700000199-1 | RFB-111-27 DMA -Roof Repair Bluegrass Challenge Academy
Solicitation # RFB-785-2700000199-1
Solicitation RFB-785-2700000199-1, also referenced as RFB-111-27, is issued by the Commonwealth of Kentucky's Department of Military Affairs through the Finance Facilities/Support Svc agency. The project requires the removal of the existing roofing system down to the roof deck and the installation of a new roofing system at the Bluegrass Challenge Academy located at 114 Conroy Ave, Fort Knox, Kentucky. The scope of work includes the installation of new tapered insulation, a gypsum roof cover board, and a 2-ply modified bitumen asphalt roof system, along with associated accessories such as prefinished metal coping caps, gutters, downspouts, metal roof splashes, flashings, and terminations. The solicitation was posted on October 29, 2026, with a response deadline of November 24, 2026, at 6:30 PM. Bids must be submitted electronically via the VSS portal, as hand-delivered or mailed submissions are not accepted. Required submission documents include the Official Bid Document and any applicable Bid Bond, which must be uploaded as a single combined attachment. Bidders are directed to download detailed specifications, drawings, and bid documents from the state of Kentucky plan room website. Project administration is managed by Janis Wilhoite as the Purchasing Agent and Carl Kratzer as the Project Manager, with additional coordination provided by Chuck Ammons of the Department of Military Affairs and Randy Newman of Kesler Simpson Architects.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS