Rodeo Sanitary District’s Water Pollution Control Plant (WPCP) and Sewer Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rodeo Sanitary District is undertaking a comprehensive infrastructure rehabilitation project focused on its Water Pollution Control Plant and surrounding sewer collection systems. Core components include the upgrade and rehabilitation of the Secondary Clarifier and Aeration Basins, which involve replacing weirs and launders, applying new protective coatings to mechanical structures and bridges, and installing a completely new electrical system including lighting control panels, sensors, conduits, and local disconnects, all within the existing facility footprint. Limited excavation up to 15 feet in depth will be required to access and modify utilities, install new piping, and construct new manholes, with full site restoration to existing or improved conditions upon completion. Additionally, approximately 1,234 linear feet of aging 6- to 10-inch diameter sewer pipelines at three distinct locations suffering from inflow and infiltration issues will be replaced, potentially involving realignment of pipelines to new easements or to comply with District code standards, along with installation of new service laterals and manholes. Work is scheduled to occur across two dry seasons, beginning in spring or summer 2026 and extending into 2027, with construction activities limited to the months of April through October to minimize environmental disruption. The entire project is exempt from full environmental review under CEQA Class 2, as it involves the replacement of existing facilities without expanding capacity or causing significant environmental impact. The place of performance is centered at the District's facility located at 800 San Pablo Avenue, Rodeo, CA 94572, with additional work occurring at three nearby sewer sites. The project is classified under NAICS code 237120 for Sewer and Septic System Construction, and while the estimated contract value remains unspecified, the District has published this as a forecast initiative with a posting date of November 20, 2025. All work must adhere to District code requirements and result in systems that are operational, compliant, and restored to at least their prior condition. Direct inquiries should be made to the District Manager, Steve Beall, via the provided contact information.

General Info

Rodeo Sanitary District rehabilitating water plant and sewer systems, replacing pipelines, upgrading electrical systems, and restoring sites during 2026–2027 dry seasons.

Agency

California → Rodeo Sanitary District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

800 San Pablo Avenue, CA, 95648

Set-Aside

NONE

Documents

(1)

Rodeo Sanitary District WPCP and Sewer Rehabilitation Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Rodeo Sanitary District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Rodeo Sanitary District
Office AddressN/A
Contacts
Steve BeallDistrict Manager

Full Description

Show more
The purpose of the Proposed Project is to upgrade and rehabilitate the District’s existing and aging infrastructure, including: • Secondary Clarifier/Aeration Basin Improvements. The proposed Secondary Clarifier and Aeration Basin Improvements at the District’s WPCP would consist of replacing the weirs and launders, new coating system on the mechanisms and bridges, all new electrical including lighting control panels, local disconnect, lights, sensors, conduits, etc. These improvements at both the aeration basins and secondary clarifiers will occur within the footprint of the existing facilities. Limited excavation to depths of approximately 15-feet will be necessary adjacent to the existing structures to access or modify existing piping, install new electrical systems, and install manholes. The site would be returned to existing or better conditions. • Sewer Pipeline Replacements. The proposed Sewer Pipeline Replacements include approximately 1,234 linear feet of 6 to 10-inch diameter sewer pipeline at three (3) locations or sites (i.e. Sites 1, 2, and 3) that are subject to inflow and infiltration (I&I) and would be replaced with either same-sized diameter sewer pipes which may include relocation of sewers to relocated easements or to meet District code requirements. The improvements would typically include installation of new or replacement collection system sewers, laterals, and manholes.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,