RE: Questions and Answer for VA786-16-R-0090 1. If the alternates are taken will there be a project performance extension, if so how much time will be added onto the time given to perform this project? Answer: Period of performance would be extended an additional 1.5 years if all three add alternates are approved. 2. In the event that casketed remains are found within the proposed concrete beam area (reviled by test holes) will they be relocated by cemetery personal and if so in what time frame? Answer: Casketed remains will be moved by cemetery personnel as soon as they can be once the COR is notified by the Contractor. 3. Where we perform test digging for the beam supports in cremation sections, are the cremations in cardboard boxes, plastic bags or some sort of metal container? Answer: Cremation containers can vary in what they are made from as well as the size. Some may be ceramic, some may be metal, but most commonly are made of plastic. Size may be from 8 3/4" - 14" outside height, 9 3/4" -15 3/8" outside width and 20 1/16" to 36 1/4" in length. 4. CLIN 0001 calls for hand digging 24"W x 24"L x 3'4" D but all alternate CLINS (A-C) require 12"W x 12"L x 3'4"D. We want to make sure that the requirement is correct as listed in that the required dimensions are significantly different for the base vs the alternate CLINS. Answer: This is an error. Alternates CLIN A001, B001, C001 should read the same as CLIN 0001. Please use the below pricing schedule for alternates. Add Alternate #1 ITEM NO. DESCRIPTION EST. QTY UNIT UNIT PRICE TOTAL PRICE A001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: B 1,097 EA $_________ $____________ *A002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: B 1 Job $_________ $____________ A003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: B 1,097 Ea. $_________ $____________ A004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: B Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________ A005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: B 1,097 Ea. $_________ $____________ A006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: B 50,950 SF $_________ $____________ A007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________ GRAND TOTAL ESTIMATED PRICE: $ ___________ ? Add Alternate #2 ITEM NO. DESCRIPTION EST. QTY UNIT UNIT PRICE TOTAL PRICE B001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: G 2,410 EA $_________ $____________ *B002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: G 1 Job $_________ $____________ B003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: G 2,410 Ea. $_________ $____________ B004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: G Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________ B005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: G 2,410 Ea. $_________ $____________ B006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: G 120,500 SF $_________ $____________ B007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________ GRAND TOTAL ESTIMATED PRICE: $ ___________ Add Alternate #3 ITEM NO. DESCRIPTION EST. QTY UNIT UNIT PRICE TOTAL PRICE C001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: D 3,324 EA $_________ $____________ *C002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: D 1 Job $_________ $____________ C003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: D 3,324 Ea. $_________ $____________ C004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: D Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________ C005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: D 3,324 Ea. $_________ $____________ C006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: D 166,200 SF $_________ $____________ C007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________ GRAND TOTAL ESTIMATED PRICE: $ ___________