Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on February 25, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--Grounds Maintenance Services for DFW

Awarded
VA78616R0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 1 hour ago

DEADLINE

in 30 minutes
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
SLED
IFB 2027-10-29 Snow/Ice removal
Solicitation # 2027-10-29
Encompass Community Supports (ECS) is soliciting bids for snow and ice removal services across 12 different sites in five Virginia counties. This Invitation for Bids (IFB 2027-10-29) will be awarded to the lowest responsive and responsible bidder based on a Unit Price Schedule that must include all labor, materials, equipment, and insurance. The contract period runs from the date of award through November 18, 2031, with four optional one-year renewal periods. Bids must be submitted via eVA or mailed to the Culpeper, Virginia office by November 19, 2026, at 2:00 P.M. The scope of work requires pre-treatment of all lots the day or night before snowfall and triggers service once accumulation reaches two inches, and every two inches thereafter. Response times are prioritized by facility type, with critical residential facilities requiring removal within two hours and office facilities within six hours. Notably, the use of rock salt is strictly prohibited at all locations, and contractors must provide approval for their proposed ice-melt products and corresponding Material Safety Data Sheets. Contractors must provide a certificate of insurance naming ECS as an additional insured and maintain records for ten years following final payment. Bidders are required to submit a Small Business Subcontracting Plan and certify their licensure and debarment status. Payment is processed on a monthly basis with standard terms of 30 days. ECS retains the right to cancel the contract with 30 days written notice and holds the authority to terminate the agreement if performance standards are not met.
Encompass Community Supports

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 561730
New
SLED
Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF
Solicitation # PD 25-26.118
Solicitation PD 25-26.118 is an Invitation to Bid issued by the Escambia County Office of Purchasing for the Dune Matrix Enhancement project at Pensacola Beach. Funded by the National Fish and Wildlife Foundation National Coastal Resiliency Fund, the project aims to improve coastal wildlife habitats and enhance natural dune resiliency against storm events. The scope of work includes the installation of approximately 78,710 units of native vegetation, including Sea Oats, Panic Grass/Gulf Bluestem, and diversity groundcover, along with the installation of 7,095 feet of post-and-rope fencing, 5,384 feet of sand fencing, and necessary signage. Additionally, the contractor is responsible for removing asphalt debris across several designated areas totaling over 17,000 square yards. The contract requires substantial completion within 150 consecutive calendar days from the Notice to Proceed, with total completion required within 180 days. Award is based solely on the total offer, though delivery time may be considered. Bidders must comply with strict federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act, and Florida's E-Verify and Public Records laws. A Cone of Silence policy is in effect, prohibiting unauthorized communication between prospective respondents and county officials. Submissions must be uploaded as a single file to the designated e-procurement portal by the final deadline of November 3, 2026, at 1:00 pm.
Purchasing

POSTED

about 8 hours ago

DEADLINE

in 5 days

General Info

Contract Value

$0

NAICS

561730 - Landscaping Services

Place of Performance

VA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Nov 24, 2015 to Dec 4, 2015.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cemetery Administration (36C786)
ContactsNo contacts available
OfficeQUANTICO, VA, 22134, USA
Office AddressQUANTICO, VA, 22134, USA
ContactsNo contact information available

Full Description

Show more
On behalf of the Dallas Fort Worth National Cemetery, the National Cemetery Administration, Stafford, Virginia intends to award a firm-fixed price contract for Grounds Maintenance in accordance with the Federal Acquisition Regulations (FAR) Part 12 - Acquisition of Commercial Items and FAR Part 13 - Simplified Acquisition Procedures. This notice does not constitute a request for proposal, request for quote, or invitation for bid. The Request for Proposal, VA786-16-R-0012 will be issued on or about November 5, 2015 for the following services: CLIN Grounds Maintenance Services - Base Period: Date of Award or 01 March 2016 - September 30, 2016 Est. Qty Unit 0001 Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 101.69 acres, mowed 36 times = Est. 3,660.84 acres mowed.) 3,152.39 Acre 0002 String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 101.69 acres, trimmed 36 times = Est. 3,660.84 acres trimmed.) 3,152.39 Acre 0003 Mow and string trim all unimproved native turf areas. (Est. 14.04 acres, mowed 9 times = Est. 126.36 acres mowed and trimmed) 126.38 Acre 0004 Trim headstones and edge markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 27,800 upright headstones and 4,800 flat markers, trimmed/edged 36 times = Est. 1,173,600 headstones and markers) 1,010,600 Headstone or Marker 0005 Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 48,000 linear feet, edged 12 times = Est. 576,000 linear feet edged.) 576,000 Linear Feet 0006 Pre-Emergent Herbicide Applications (Est. 101.69 acres, applied 2 times = 203.38 acres treated.). See Table 3.5 203.38 Acre 0007 Post-Emergent Herbicide Applications (Est. 101.69 acres, applied 3 times = 305.07 acres treated.). See Table 3.5 305.07 Acre 0008 Fertilizer Applications. Free flowing, granular, 21-7-14 with 50% slow release nitrogen (SCU), with micronutrients. (Est. 101.69 acres, applied 3 times = 305.07 acres treated.). See Table 3.6 305.07 Acre Attachments will be provided with the RFP PERFORMANCE WORK STATEMENT 1. GENERAL INFORMATION 1.1. This is a performance-based contract for cemetery grounds maintenance services at Dallas-Fort Worth National Cemetery, Dallas, Texas and hereafter referred to as DFW or "Cemetery." The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities of mowing and trimming; trimming around headstones, edging around flat markers; curb/sidewalk edging; weed control; providing fertilizer; and associated services described herein required to maintain a healthy and aesthetic appearance of the Cemetery grounds. The Cemetery is located at 2000 Mountain Creek Parkway, Dallas, Texas, 75211. 1.2. This Performance Work Statement describes the basic objectives of the Dallas-Fort Worth National Cemetery Grounds Maintenance Program. The Performance Based Service Contract provides potential Offerors the flexibility to develop cost effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the Offeror's understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained on the Statement of Work that the Government traditionally provides to prospective Offerors. Minimum acceptable levels of performance to meet the minimum requirements are outlined in the "Services Delivery Summary" contained in Attachment 1. 1.3. The National Cemetery Administration Mission. 1.3.1. The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures performed by the Contractor have been established by the National Cemetery Administration to reflect this Nations' concern and respect for those interred there. For this reason, the Contractor's strict adherence to the Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential. 1.4. Background. 1.4.1. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans. 1.4.2. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation's freedom and way of life. 2. DESCRIPTION OF CONTRACT OBJECTIVES 2.1. The Contractor shall furnish all labor, supervision, professional expertise, vehicles, tools, equipment, materials, and services necessary to ensure that grounds maintenance is performed in a manner that shall meet or exceed the requirements to maintain healthy turf grass and that presents a clean, neat, professional and aesthetic grounds appearance throughout the Cemetery. The Contractor's performance will be based on the Contracting Officer's (CO) and Contracting Officer's Representative (COR) evaluation and of the results required by the Service Delivery Summary (SDS) and not the method of performance. It is at the Contractor's discretion to determine the methods to attain the level of service at the best value. The evaluation of results will be based on COR performance assessment, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, local laws, and commercial standards. 2.2. Services include, but are not limited to, mowing, trimming (features and headstones), edging (features and flat markers), weed control, providing fertilizer, removal of trash (generated by the Contractor), as well as sweeping or blowing off grass from sidewalks, roads and headstones. Scheduling of services shall be coordinated with the COR to avoid disruption of ongoing Cemetery operations. All work shall be done during normal Federal workdays during Cemetery workday hours. The exception is Memorial Day, which may be a workday for Federal employees, but not for the Contractor. No work shall be allowed during special weekend activities. 2.3. The Contractor shall be responsible for full management of the facility's grounds maintenance services described herein. The Government's objectives are described in the NCA's "Operational Standards and Measures" (given upon request of the Contracting Officer), the Performance Work Statement (PWS), and other requirements identified herein, as they are applicable to the services required in the Pricing Schedule. The Contractor shall develop a "Performance Work Plan" that contains solutions to accomplish the Government's objectives. The Contractor may use whatever method it chooses to meet the objectives, as long as the end result satisfies the minimum acceptable levels of performance as defined in Services Delivery Summary (SDS). 2.4. Contract Objectives. 2.4.1. To use an innovative and creative technical approach to manage the Cemetery grounds maintenance operation at the Dallas-Fort Worth National Cemetery in order to maintain the high standards of appearance as a National Shrine, in accordance with best commercial practices and the requirements identified in this solicitation. 2.4.2. To have the Contractor perform to its Technical Performance Approach focused on criteria designed to maintain healthy grass and a clean, neat and professional grounds appearance overall. 2.4.3. The minimum life of the contract is planned for one base period with up to four (4) one- year options individually exercised at the VA's discretion and dependent on the availability of funds. 3. DESCRIPTION OF SERVICES: 3.1. Improved Grounds Mowing. The Contractor shall mow all Improved Grounds to look well-manicured, with a neat and professional appearance at all times. Improved Grounds are visually prominent and medium visual impact areas requiring more frequent maintenance, such as burial areas, high visibility specialty areas, and non-burial areas (see Attachment 6, Definitions). All Improved Grounds shall be maintained in the same manner as a high quality residential lawn under contract from a professional lawn maintenance service. This generally requires a complete mow/trim cycle every week during the growing season (April through September). Mowed areas shall be uniform in appearance, free of skips, gaps, scalping, rutting, bruising, and uneven and rough cutting. 3.1.1. The Contractor shall maintain grass height at a height within one (1) inch (+/-) of that which is professionally recommended for the recommended grass type for the Dallas-Fort Worth geographic region and as directed by the COR. Optimally, the height should be no more than one-half an inch (½") above the recommended range for the type of turf at the Cemetery as directed by the COR. The typical acceptable height ranges between 1 and 3 inches; however, the COR, with input from the Memorial Service Network (MSN) Agronomist, may direct the Contractor on the particular height to mow at any given time depending on weather conditions. 3.1.2. The Contractor shall be required to pick up, collect and dispose of debris and trash (see Attachment 6, Definitions), natural and manmade, prior to and after mowing/trimming any area. 3.1.3. The Contractor shall identify, move and replace all floral or commemorative items, etc. to their original locations as necessary while performing mowing/trimming services. 3.1.4. The Contractor shall keep all headstones, flat markers, monuments, roadways, walkways (inside and out), flagpole bases, public visitor areas including at the Committal Shelter, or other non-turf areas free of clipping or edging deposits. Clippings shall be mechanically blown or swept onto nearby turf areas when possible, or collected and disposed of on the same day as the mowing, trimming, or edging event that produced them. At no time is freshly mowed grass to be blown onto headstones 3.1.5. The Contractor shall immediately remove and dispose of, or mulch clearly visible clumps of grass clippings on top of the turf to prevent the appearance of windrows. 3.1.6. The Contractor shall use commercial grade rear-discharge mowers or commercial grade mowers with mulching decks only. The Contractor shall use properly maintained and adjusted cutting equipment to prevent streaks or irregularities, uneven cutting, plowing, or gouging of the soil. Cutting blades on mowing and trimming equipment must be kept sharp so that grass tips are cleanly cut and not torn or damaged. Riding mowers may be used if they are not operated within two (2) inches of markers, monuments, tree trunks or other vertical surfaces. 3.1.7. All mowing equipment shall be cleaned before unloading or mowing at the Cemetery to reduce the risk of introducing contaminant weed seeds into the Cemetery turf. No equipment shall be cleaned on Cemetery property. 3.1.8. The Contractor shall hand mow new seed/sod areas (present at all newly buried gravesites, second interment gravesites, and repaired gravesite locations) until they are fully established to the point where they will not be damaged by riding mowers. 3.1.9. The Contractor shall be familiar with and utilize different mowing patterns and shall change direction, change patterns, and vary mower wheel width patterns after each mowing thereby reducing turf wear, prevent wheel rutting, and provide a neater appearance. All mowing around trees will be accomplished in a manner that prevents a "ringing pattern" around the tree and associated damage to turf. 3.1.10. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. The COR has the authority to stop work if weather conditions are such that work that day will do more damage than good to the Cemetery grounds. During these periods, the Contractor shall be expected to ensure the grass is cut in less than a week's time once grass is suitable for mowing. 3.2. Trimming. The Contractor shall trim grass and vegetation around vertical surfaces or any other structure or area that cannot be maintained by traditional mowing equipment to match surrounding area grass height within Improved Grounds. Streaks or irregularities, uneven cutting, plowing, or gouging of the soil is unacceptable. The vertical surfaces to be trimmed include headstones, flat markers, section markers, monuments, trees, planting beds, shrubs, buildings, curbs/curbing, fences, walls, poles, signs, fire hydrants, parking lot bumper blocks, boulders, utility/valve boxes and covers. 3.2.1. The Contractor shall trim turfgrass surrounding headstones and flat markers to its recommended height for the type of turf at the Dallas-Fort Worth National Cemetery after each mowing cycle. 3.2.2. The Contractor shall trim all areas concurrent with mowing. Trimming operations of all non-mowed turf areas shall be considered a part of mowing. The Contractor shall mow first, followed by trimming. 3.2.3. The Contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area. 3.2.4. The Contractor shall exercise caution to avoid contact with headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc. or any other structure than can be damaged by contact with the trimming device's cutting instrument. 3.2.5. The Contractor shall use commercial grade power trimmers and power edgers to trim grass from around headstones, flat markers, monuments, section markers, etc. The Contractor shall use trimmers with a plastic blade attachment to cleanly trim edges around all headstones and flat markers, monuments, section markers, etc. or as otherwise approved by the COR. 3.3. Feature Edging. The Contractor shall blade edge all streets, curbs, walkways, tree wells, permanent building/structure lines, and planting beds. Edging shall provide a clear zone ½" to 1" wide by 2" to 3" deep with all vegetation removed from joints and cracks. Damage to asphalt/concrete shall be avoided. Edging events shall be completed as ordered by the COR. The first edging cycle shall be completed approximately at the start of the mowing season, the second cycle one week prior to Memorial Day, the third during the month of July, and a fourth edging during the month of September. Additional edging events may be scheduled by the COR. The exact dates will be provided by the COR. 3.4. Flat Marker Blade Edging. The Contractor shall edge turf perpendicular to the outside perimeter (edge) of flat grave markers to remove all grass/vegetation that is growing around or over the entire outside perimeter of the flat grave markers during each mow/trim cycle. The depth of the vertical cut at the edge of the flat markers shall be 1" to 2" deep and the width of the cut shall not exceed ½". There shall be a clean and neat vertical edge left around each flat marker. No metal blades shall be used to edge around flat markers. The Contractor shall exercise caution not to chip flat markers with blades. Flat markers are grouped together in the same burial sections. 3.5. Weed Control. The Contractor shall control broadleaf and grassy weeds through execution of a weed control program appropriate for the area, in accordance with NCA Handbook 3410, Integrated Pest Management Procedures for VA National Cemeteries, and current federal, state, and local regulations. The Contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards; 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts; 40 CFR 150-189, Protection of Environment, Pesticide Program; and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. 3.5.1. The Contractor shall control weeds through broad and selective applications of herbicide. The herbicide program, in general, shall consist of two (2) pre-emergent herbicide applications and three (3) post-emergent herbicide applications per contract year. The table below serves as a guideline for when the herbicide applications shall be made: Table 3.5. General Schedule for Herbicide Applications Pre-Emergent Application #1 Late Winter/Early Spring - exact timing of application based on soil temperature and weather conditions. Prior approval from COR required before application. Pre-Emergent Application #2 Late Summer/Early Fall - exact timing based on soil temperature and weather conditions. Prior approval from COR required before application. Post-Emergent Application #1 Early Spring/Mid Spring - exact timing based on weed development. Prior approval from COR required before application. Post-Emergent Application #2 Early Summer/Mid Summer - exact timing based on weed development and residual period of Post-Emergent Application #1. Prior approval from COR required before application. Post-Emergent Application #3 Late Summer/Fall - exact timing based on weed development and residual period of Post - Emergent Application #2. Prior approval from COR required before application. 3.5.2. The Contractor shall be responsible for repeat, follow-up, and/or spot spray herbicide applications between scheduled sprays, which are deemed necessary by the COR due to an ineffective application, in order to control and maintain a generally weed-free Cemetery. These repeat, follow-up, and spot spray treatments shall be provided at no additional charge to the Government. 3.5.3. The herbicides used by the Contractor shall be specifically labeled for control of weeds in the turf at the Cemetery. The Cemetery turf is pre-dominantly Hybrid Bermuda. The herbicide shall be selected and applied in a manner that does not harm, damage, or kill the turf in any way. 3.5.4. The herbicide applications shall be applied directly by or under the supervision of a current commercially licensed State Certified Pesticide Applicator. All applications shall be performed as per the Rules and Regulations of the Texas State Department of Agriculture. 3.5.5. Either the COR will notify the Contractor prior to each application as needed or the Contractor shall contact the COR (in person, in writing, or by telephone) for permission to spray at least three (3) days in advance of each and any application. The COR will coordinate each spray application with the Contractor. The Contractor shall be responsible for the proper timing of each application so that the highest resulting weed control for that application will be attained. 3.5.6. The Contractor shall be responsible for specifically following all label directions on the bag/container of herbicide at all times. This includes, but is not limited to, all safety, mixing, weather conditions, and application directions and information. 3.5.7. The Contractor shall always mix and apply herbicide so as to provide optimum control of target weeds, according to label directions. 3.5.8. The Contractor shall provide to the COR, in writing, a list of all herbicides, mixes, and related surfactants or other chemicals, along with the amount of product per acre, percentage of solution, and/or application rate per 1000 square feet (and/or per acre), prior to any and all applications being performed. The Contractor shall also provide the COR with a copy of the label and the Safety Data Sheet (SDS) for any and all herbicides and other chemicals or surfactants, prior to any and all applications being performed. The Contractor shall NOT begin any application without providing this information to the COR, and obtaining the approval of the COR to proceed. 3.5.9. A written record of the application shall be delivered to the COR immediately following the application, whether completed or not, before leaving the Cemetery on the day of any application. The written record shall show the following information: 3.5.9.1. The name of the company and the names and titles of the company's staff that performed the application. 3.5.9.2. All areas treated on that particular day of application. 3.5.9.3. The chemicals used on that particular day of application. 3.5.9.4. The temperature during the time of application, and the average wind speed during the time of application. 3.5.10. All Contractor personnel shall be properly clothed and wearing proper safety equipment during any and all applications. 3.5.11. All mixing of chemicals and filling of tanks shall be performed off-site or only in appropriate area(s) of the Cemetery as determined by the COR. 3.5.12. Performance of work shall not impede nor disturb any burial or memorial service, or burial operation at any time. Work shall not take place within 1,000 feet of a committal shelter during a service, or during a ceremony in the Cemetery. 3.5.13. The Contractor shall coordinate with the COR any watering requirements to activate chemicals, as needed. The Cemetery will schedule and perform this watering requirement. 3.6. Fertilization Program. The fertilizer program shall consist of three applications per year according to the following schedule: Table 3.6. General Schedule for Fertilizer Applications Fertilizer Application #1 Spring - upon order and approval of the COR, after turf has emerged from winter dormancy, has new green flush growth, and has been mowed 1 to 2 times. This is usually in the March-April time period. Fertilizer Application #2 Summer - upon order and approval of the COR - usually in the May-June time period. Fertilizer Application #3 Fall - upon order and approval of the COR - usually in the August-September time period. 3.6.1. The fertilizer shall be a 3-1-2 or 4-1-2 ratio (N-P-K) complete fertilizer with 30% to 50% slow release nitrogen. The current formulation used at Dallas-Fort Worth NC is a 21-7-14. The fertilizer shall contain micro nutrients. The fertilizer can be a different analysis than 21-7-14 as long as it is approved by the COR and MSN Agronomist prior to application. 3.6.2. All fertilizer applications shall only be applied after being ordered by the COR. The Contractor shall schedule to apply fertilizer on the days ordered and agreed to by the COR. 3.6.3. The fertilizer shall be applied according to the manufacturer's instructions. The fertilizer shall be applied at a rate to achieve 4 to 5 pounds of N (nitrogen) per 1000 square feet per year. 3.6.4. The fertilizer application equipment shall be correctly calibrated and the application made to achieve a uniform distribution of the fertilizer throughout the application area. 3.6.5. The Contractor shall ensure that the fertilizer is properly watered in by coordinating the watering schedule with the COR. 3.6.6. The Contractor shall make sure that all headstones, flat markers, monuments, sidewalks, patios, and other like surfaces are free of fertilizer granules immediately after the application and before watering in of fertilizer occurs. This shall aid in avoiding staining of surfaces. 3.6.7. The Contractor shall be responsible for removal of any staining, marking, of headstones, flat markers, monuments, sidewalks, patios, and other like surfaces that occurs as result of a fertilizer application made by the contractor. 3.6.8. The Contractor shall schedule the fertilizer application with the COR and only apply once given approval by the COR. The Contractor shall give the COR a minimum one week notice prior to application. 4. SERVICE DELIVERY SUMMARY (SDS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SDS and the Contractor's Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. During the initial 30 days of the contract, two additional errors on each performance objective shall be allowed in an effort to identify normal "phase-in" problems. 4.1. Quality Control. The Contractor shall develop, submit for Contracting Officer and COR acceptance, and maintain a Quality Control program to ensure grounds maintenance services are performed in accordance with the requirements of this contract. 4.1.1. The Contractor shall submit a Quality Control Plan (QCP) for Contracting Officer and COR acceptance within fourteen (14) calendar days after contract award. Any changes thereafter must also be provided to Contracting Officer and COR for acceptance. 4.1.2. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop Quality Control procedures addressing the areas identified in Paragraph 3, Description of Services. The Contractor shall provide at least one (1) full time person dedicated to Quality Control. 4.1.3. The Contractor's QCP shall include the following or have incorporated into during performance of contract, at a minimum: 4.1.3.1. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections. 4.1.3.2. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection. 4.1.3.3. Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract. 4.1.3.4. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting intermediate supervisory responsibilities and overall management responsibilities for ensuring total acceptable performance. 4.1.3.5. On-site records identifying the character, physical capabilities, certifications and ongoing training of each employee performing services under this contract. 4.1.3.6. A log to account for all requests for immediate service. The log shall indicate the date and time of services, and description of results and completion of these services. 4.1.3.7. On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract. 4.2. Quality Assurance. The COR will evaluate the Contractor's performance through on-site inspections, evaluation of the Contractor's quality control program and receipt of complaints from Cemetery personnel in accordance with the attached Quality Assurance Surveillance Plan (QASP), Attachment 7. 4.2.1. The COR may inspect each task as completed or increase the number of Quality Assurance inspections if called for by repeated failures discovered during inspections or repeated customer complaints. Likewise, the COR may decrease the number of Quality Assurance inspections if performance dictates. 4.2.2. The COR will also receive and investigate complaints from various customers visiting the Cemetery. The Contractor shall be responsible for initialing validated visitor complaints. The COR will make final determination of the validity of visitor complaint(s). 4.3. Supervision. 4.3.1. Contractor Superintendent: The Contractor shall provide a competent and experienced supervisor who speaks and writes fluent English on site for at least four (4) hours a day whenever work is being performed, other than trash and debris pick-up. 4.3.2. The Contractor Superintendent must have not less than five (5) years' experience as a direct supervisor of grounds maintenance operations that included mowing, trimming, edging, and cleanup in industrial, commercial or public sites. 4.3.3. The Contractor Superintendent shall ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained. 4.3.4. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action shall be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor shall not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the CO. 4.3.5. In the absence of the Superintendent, the Contractor shall appoint an English-speaking crew foreman or an employee who shall be responsible to insure that the work is being accomplished in an expeditious manner, is performed in accordance with the contract specifications and that the work will progress without undue delay. 4.4. Inspection and Cleaning of Work Areas. 4.4.1. The Contractor shall perform a weekly inspection. During this inspection the appearance of the work areas shall be observed, and any deficiencies noted within the scope of the contract shall be corrected as soon as practicable. Items that need correcting outside the scope of the contract shall be reported to the COR or his/her representative. 4.4.2. The Contractor shall be required to submit inspection reports and work accomplished to the COR weekly. The inspection forms will be provided to the Contractor. (See "Work Summary and Progress Report", Attachment 3) 4.5. Reporting and Record Keeping. 4.5.1. The Contractor Superintendent shall report on a daily basis to the COR at the Maintenance Building of the Cemetery and log in on days when work is being performed. This DAILY check-in is mandatory and shall be at a time agreed upon by the COR and the Contractor Superintendent. The purpose of the DAILY meeting is to coordinate and establish the daily work schedule to ensure that no work is being performed at the immediate site of a scheduled interment or ceremony, and to submit the required written reports to the COR. These Daily meetings are for the Contractor Superintendent to ask questions and ensure he/she understands the off-lim...

More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)

Same awarding agency

NAICS: 337211
New
Federal
Furniture Tahoma National Cemetery
Solicitation # 36C78627Q0020
Solicitation 36C78627Q0020 is a combined synopsis and request for quotation issued by the Department of Veterans Affairs, National Cemetery Administration, for the purchase, delivery, and installation of new commercial furniture at Tahoma National Cemetery in Kent, Washington. This firm-fixed-price purchase order is a total small business set-aside under NAICS code 337211. The scope of work includes providing desk systems, tables, seating, lockers, and storage for the Administration and Honor Guard buildings, with all work to be completed within 60 days after receipt of order. The contractor is responsible for all unloading, placement, and professional installation, as well as the removal of all packaging debris and the protection of government facilities during the process. The government will award the contract to the responsible offeror who provides the lowest price that is found to be fair, reasonable, and technically acceptable based on a pass/fail evaluation of the submitted technical documentation. Interested vendors must submit their quotations electronically by November 16, 2026, at 4:00 PM PST, organized into three separate PDF volumes: Administrative, Price, and Technical. Requirements include active registration in the System for Award Management and adherence to specific supplemental insurance minimums, including $500,000 for general liability bodily injury and $100,000 for property damage. Delivery is FOB Destination, and contractors must coordinate scheduling at least 14 business days in advance.
Wood Office Furniture Manufacturing

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 811310
New
Federal
J039 - Equipment Maintenance - Golden Gate National Cemetery
Solicitation # 36C78627Q0027
The Department of Veterans Affairs, through the National Cemetery Administration, is issuing a sources sought notice for recurring large equipment maintenance at the Golden Gate National Cemetery in San Bruno, California. Under NAICS code 811310, the government is seeking capable vendors to provide all labor, supervision, tools, equipment, materials, and transportation necessary to perform on-site preventative and corrective maintenance. The scope of work covers government-owned equipment including dumpers, forklifts, utility vehicles, loaders, and mini excavators. Services must be performed in accordance with manufacturer recommendations and government schedules, encompassing oil and filter changes, fluid and lubrication services, battery testing, and comprehensive system inspections of engines, drivetrains, hydraulics, and electrical systems. Interested respondents must submit their company name and Unique Entity Identifier (UEI) to the contracting officer by the November 3, 2026, deadline, and are encouraged to provide a capabilities statement. Qualified contractors must employ certified mechanics and technicians with experience in heavy equipment maintenance and the ability to service both diesel and gas-powered machinery. Key performance requirements include rigorous safety system checks and forklift inspections to ensure operational compliance. All maintenance activities are to be conducted on-site at the cemetery facility.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Solicitation # 36C78626B0028
The Department of Veterans Affairs National Cemetery Administration is soliciting bids for the Fort Bliss National Cemetery Gravesite Expansion and FCA Deficiencies project in El Paso, Texas. This firm-fixed-price contract is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated construction magnitude between $20 million and $50 million. The scope of work includes burial expansion, sitework, and the correction of FCA deficiencies, organized into a base bid for installation and pre-placed crypts, and a separate bid option for additional burial expansion and sitework. The project involves comprehensive construction activities, including the installation of 6,632 pre-placed crypts, mass grading, stormwater pollution prevention, and various architectural improvements to the Administration and PIC/Restroom buildings, such as clay roof tile replacement, stucco application, and electrical upgrades. The performance period is 540 calendar days from the notice to proceed, with work beginning within 10 days of award. Bidders must comply with Davis-Bacon prevailing wage requirements and provide performance and payment bonds totaling 100 percent of the awarded contract amount. Technical requirements include adherence to ADA accessibility standards, OSHA safety regulations for excavations, and strict guidelines for the treatment of historic decorative metal. Award will be granted to the responsible bidder whose conforming bid is determined to be most advantageous to the government, with evaluation based primarily on price and price-related factors.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
Federal
Grounds maintenance services for Riverside National Cemetery. -- S208
Solicitation # 36C78626R501200008
The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for comprehensive grounds maintenance and improvement services at Riverside National Cemetery in Riverside, California. This is a best value source selection procurement set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 561730. The contract structure consists of a twelve-month base year starting November 1, 2026, with four subsequent twelve-month option years. The scope of work covers approximately 460 developed acres and includes turf and grasses maintenance, pest control, irrigation system services, pond and drainage system maintenance, trash and debris removal, structure cleaning, and a one-time replacement and repair of the MOH pool pump system. The maximum aggregate value of the contract is 23,000,000 dollars, with a guaranteed minimum of 9,115.51 dollars. Award decisions will be based on a tradeoff analysis of three factors: Technical Capability, Past Performance, and Price, with the combined non-price factors carrying more weight than price. Technical evaluation focuses on the offeror's approach to turf management, safety compliance with OSHA and SCA standards, and the qualifications of key personnel, specifically the Site Manager. Proposals must include a signed SF 1449, completed price schedules, a draft Quality Control Plan, and at least two relevant past performance references. Following several amendments to address technical publishing issues and vendor inquiries, the final deadline for proposal submission has been extended to November 5, 2026, at 5:00 PM PST, with submissions sent via email to the contracting office.
Landscaping Services

POSTED

3 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS