This Solicitation opportunity from Department Of Transportation was posted on May 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
San Luis Obispo (SBP) ATCT Roof Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the replacement of the roof at the Air Traffic Control Tower (ATCT) located in San Luis Obispo (SBP). The subcontractor is responsible for providing all necessary labor, materials, equipment, supervision, and related services to complete the project, which covers approximately 361 square feet of roofing area. The scope of work includes removal and disposal of the existing roofing system, installation of a code-compliant roof hatch guardrail kit with a self-closing galvanized gate, replacement of all roof drains, roof hatch removal and replacement, and relocation of the grounding counterpoise from the roof to the parapet wall. Additionally, the contractor is required to manage and dispose of all debris and trash generated from the work on a daily basis in accordance with local and state regulations. This solicitation is a Total Small Business Set-Aside under NAICS code 238160 and is issued by the Department of Transportation’s 697DCK Regional Acquisitions Services office in Fort Worth, TX. The place of performance is San Luis Obispo, California. The solicitation was posted on May 14, 2026, with a response deadline of June 2, 2026. Rodgers Cox is the primary point of contact for this contract. The work emphasizes compliance with safety and code requirements while ensuring proper site cleanup throughout the project duration.
General Info
Agency
NAICS
Place of Performance
San Luis Obispo, CA, 93401, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft.
The scope of work includes but not limited to:
• Remove and dispose of existing roofing system from the SBP ATCT cab roof.
• Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance.
• Remove and replace all roof drains.
• Remove and replace roof hatch
• Remove and relocate grounding counterpoise from roof to parapet wall.
• Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
