Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Santa Ana Off- Premises Commercial Advertising Signs Ordinance Update Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Conditional Use Permit No. 2025-25 authorizes the City of Santa Ana to reconstruct an existing on-premise digital sign at 1505 S. Auto Mall Drive into a two-sided, V-shaped digital billboard for off-premise commercial advertising. The project involves installing two 840-square-foot screens and allows the structure to exceed the standard 60-foot height limit. As part of the upgrade, the existing Exit on Edinger text will be removed. The project is located within Potential Billboard Area 4 and complies with the 2022 Santa Ana Off-Premises Commercial Advertising Signs Ordinance. It has been determined that the project will not have a significant effect on the environment, as it falls within the scope of a previously prepared Mitigated Negative Declaration. Approval is subject to the established Mitigation Monitoring and Reporting Program to ensure all environmental safeguards are maintained.

General Info

Santa Ana permits a two-sided digital billboard at 1505 S. Auto Mall Drive.

Agency

California → City of Santa Ana

Place of Performance

Auto Mall Drive and Edinger Avenue, Santa Ana, CA, 92705

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Ana
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Santa Ana
Office AddressN/A
Contacts
Pedro GomezPrincipal Planner
Rod WilsonProject Applicant

Full Description

Show more
Conditional Use Permit No. 2025-25 The project includes the reconstruction of an existing freeway-oriented, on-premise digital sign into a digital billboard with off-premise commercial advertising at 1505 S. Auto Mall Drive. The request also includes allowing the digital billboard to continue to exceed the maximum permitted height of 60 feet. The scope of work includes removing the existing digital screen and installing a two-sided, V-shape billboard with two 840-square-foot screens on either side. Additionally, the existing "Exit on Edinger" text will be removed. The adoption of Ordinance No. NS-3023 was accompanied by the adoption of the 2022 Santa Ana Off-Premises Commercial Advertising Signs Ordinance Mitigated Negative Declaration (MND) (SCH No. 2022030204), as well as the adoption of a Mitigation Monitoring and Reporting Program (MMRP). The MND evaluated the potential environmental impacts associated with the implementation of digital billboard signage within designated allowable areas, referred to as "Potential Billboard Areas," where new digital display billboards are permitted. Due to the linear nature of the freeway corridors, the City was divided into six Potential Billboard Areas for purposes of environmental analysis. These areas are generally located along freeway frontages within 300 feet of the edge of pavement and are limited to non-residentially zoned properties, including areas governed by specific plans and specific development zoning districts. The ordinance further restricts billboard placement by prohibiting digital billboards within 500 feet of residentially zoned properties and within Caltrans right-of-way or designated landscaped freeway corridors. The subject site is located within Potential Billboard Area 4, one of the designated allowable areas evaluated in the MND. Accordingly, the MND analyzed the environmental setting, potential impacts, and applicable mitigation measures associated with digital billboard development in locations such as the subject site, and the MMRP was adopted to ensure implementation of those mitigation measures. In accordance with the California Environmental Quality Act (CEQA) and Section 15162 of the CEQA Guidelines, the Project is within the scope of the 2022 Santa Ana Off-Premises Commercial Advertising Signs Ordinance Mitigated Negative Declaration (MND) (SCH No. 2022030204). The previously adopted MND adequately describes the Project's environmental setting, impacts, and mitigation measures. This is to advise that the City of Santa Ana (Lead Agency) has approved the above-described project on July 27, 2026, and made the following determination regarding the above-described project: 1. The project will not have a significant effect on the environment. 2. The Project is covered by a previously prepared Negative Declaration (SCH No. 2022030204) pursuant to the provisions of CEQA. 3. Mitigation measures were made a condition of the approval on the previous Negative Declaration (SCH No. 2022030204) and reaffirmed for this Project. 4. A mitigation reporting or monitoring plan was adopted for the previous Negative Declaration (SCH No. 2022030204) and is applicable to this Project. 5. A Statement of Overriding Considerations was not adopted for this Project. 6. Findings were not made pursuant to the provisions of CEQA. This is to certify that the final EIR with comments and responses and record of project approval, or the Negative Declaration, is available to the General Public at https://ceqanet.lci.ca.gov/2022030204

Similar Contracts

Same NAICS industry code

NAICS: 238290
New
International
Design Build Services for the Replacement of City Hall’s Three (3) Elevators
Solicitation # T2026-303
The City of Brampton is soliciting bids for a design-build contract to replace three lobby elevators at City Hall, located at 2 Wellington Street West. The selected Design-Builder will manage the entire project lifecycle, including planning, design, construction, commissioning, and project close-out, with a target for substantial completion by March 2028. To maintain building operations, elevators must be replaced in succession so that at least two remain in service during normal business hours. The scope also includes providing interim maintenance and entering into a formal maintenance agreement upon substantial performance. The project must adhere to strict technical and safety standards, including CAN/CSA B44-2019, TSSA requirements, and the Accessibility for Ontarians with Disabilities Act. Key deliverables include shop drawings for City approval and the procurement of all necessary permits from authorities having jurisdiction. The contract includes a two-year comprehensive warranty period following substantial performance. Payment will be processed electronically within 28 calendar days of receiving an approved invoice via the City's online portal. Bidders must submit their proposals through the City's online bidding system in PDF format, including a digital bid bond of at least 10 percent of the total stipulated price. The City reserves the right to award the contract to a bidder other than the lowest bidder based on compliance and overall value. Required security includes performance and labour and material payment bonds under Section 85.1 of the Construction Act. Evaluation will consider the base price for design and fabrication, as well as provided labour rates for additional services.
City of Brampton

POSTED

about 17 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238290
New
SLED
Bus Wash System Replacement Project
Solicitation # SV 26-10R
The City of Simi Valley Department of Public Works is soliciting bids for the Bus Wash System Replacement Project (SV 26-10R) at its Transit Maintenance Facility. This project requires a California licensed Class A or B general contractor with at least five years of experience to handle the permitting, demolition, and installation of a new high-efficiency, electric-powered automatic drive-through bus wash system. The new system must be capable of cleaning fixed-route buses, dial-a-ride vans, and on-demand vans, and must include a primary wash arch, reverse osmosis and water reclamation systems, and integrated LED control systems. The expected period of performance is 300 working days from the issuance of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder based on a total bid amount comprising a lump sum base bid and unit prices for 21 scheduled items, with an optional alternate for concrete pad replacement. As the project is funded by the Federal Transit Administration, contractors must comply with Buy America domestic sourcing requirements, FTA third-party clauses, and State prevailing wage rates for Ventura County. Bids must be submitted in sealed form by October 20, 2026, at 3:30 p.m. Key administrative terms include a 5% retention on progress payments, a minimum 35-day payment timeline following invoice approval, and a one-year warranty on all work and materials.
City of Simi Valley

POSTED

1 day ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS