Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SB1 Citywide Pavement Rehabilitation

Closed
20260804006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

41 minutes ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 2 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Hemet is soliciting bids for SB1 Citywide Pavement Rehabilitation, a comprehensive infrastructure project spanning multiple streets including Menlo Ave, Park Ave, Carmelita St, and Wentworth Dr, with work centered in San Jacinto, California. The scope encompasses full-depth reclamation of existing pavement, reconstruction with four inches of asphalt concrete, curb ramp replacements, ADA improvements, utility adjustments, concrete replacement, grading, installation of AI-powered traffic camera systems, construction of drainage ditches and concrete basins, and tree removal. All work must comply with the Greenbook 2024, Standard Specifications for Public Works Construction, ASTM, AASHTO, MUTCD, and CalTrans standards, and must adhere strictly to prevailing wage laws under California Labor Code sections including 1771.1, 1771.4, 1774, and 1776. The contractor is responsible for providing all labor, materials, equipment, and services, including traffic control, safety measures, stormwater management, and site security, with no additional compensation for compliance-related activities. The contract is awarded on a Lowest Price Technically Acceptable basis, where bidders must be fully responsive and responsible, submitting a signed bid, bid bond, complete unit pricing, and all required certifications. Mandatory certifications include DIR contractor registration, prevailing wage compliance with biweekly certified payroll submissions, worker’s compensation insurance, IRCA employment eligibility, and adherence to the California False Claims Act. The contractor must also commit to DBE participation goals and provide a guarantee agreement, affidavit of payment, certification of adequate contract amount, and affidavit of disposal of equipment. Performance is measured in working days starting from the Notice to Proceed, with a 120-day completion target noted as an example. All work must be completed on-site, with final acceptance contingent upon engineer recommendation and city council approval. Proposals must be submitted in sealed hard copy only by the deadline to the specified Hemet procurement address, with electronic submissions rejected. No contract value is disclosed as pricing fields in the bid schedule are blank, and the award will be granted to the lowest compliant bidder whose proposal meets all technical and regulatory requirements.

General Info

City of Hemet seeks bids for SB1 pavement rehab with AI cameras, drainage, ADA upgrades on multiple streets by August 27, 2026.

Place of Performance

San Jacinto, CA, 92583, USA

Set-Aside

NONE

Documents

1

CIP 2511 SB1 Citywide Pavement Rehabilitation Bid Package

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Hemet
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Hemet
Office AddressN/A
Contacts
Jilleen FerrisP.E., Interim Public Works Director/City Engineer

Full Description

Show more
Bid #2511: The project involves citywide pavement rehabilitation, including removal and replacement of existing pavement with full depth reclamation, striping, curb ramp replacement, ADA improvements, adjustment of existing utilities, concrete replacement, and grading. Key tasks include installing AI-powered traffic camera systems, constructing drainage ditches and concrete basins, and removing trees. The work is located across multiple streets: Menlo Ave from San Jacinto Ave to Park Ave, Park Ave from Menlo Ave to Dartmouth St, Carmelita St from Mayberry Ave to Whittier Ave, and Wentworth Dr from Cawston Ave to Sanderson Ave. The contractor is responsible for all labor, materials, equipment, and services to complete the project in strict accordance with contract documents, including adherence to prevailing wage laws and environmental controls.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS