Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

SB1 Citywide Pavement Rehabilitation

Active
20260804006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Hemet is soliciting bids for SB1 Citywide Pavement Rehabilitation, a comprehensive infrastructure project spanning multiple streets including Menlo Ave, Park Ave, Carmelita St, and Wentworth Dr, with work centered in San Jacinto, California. The scope encompasses full-depth reclamation of existing pavement, reconstruction with four inches of asphalt concrete, curb ramp replacements, ADA improvements, utility adjustments, concrete replacement, grading, installation of AI-powered traffic camera systems, construction of drainage ditches and concrete basins, and tree removal. All work must comply with the Greenbook 2024, Standard Specifications for Public Works Construction, ASTM, AASHTO, MUTCD, and CalTrans standards, and must adhere strictly to prevailing wage laws under California Labor Code sections including 1771.1, 1771.4, 1774, and 1776. The contractor is responsible for providing all labor, materials, equipment, and services, including traffic control, safety measures, stormwater management, and site security, with no additional compensation for compliance-related activities. The contract is awarded on a Lowest Price Technically Acceptable basis, where bidders must be fully responsive and responsible, submitting a signed bid, bid bond, complete unit pricing, and all required certifications. Mandatory certifications include DIR contractor registration, prevailing wage compliance with biweekly certified payroll submissions, worker’s compensation insurance, IRCA employment eligibility, and adherence to the California False Claims Act. The contractor must also commit to DBE participation goals and provide a guarantee agreement, affidavit of payment, certification of adequate contract amount, and affidavit of disposal of equipment. Performance is measured in working days starting from the Notice to Proceed, with a 120-day completion target noted as an example. All work must be completed on-site, with final acceptance contingent upon engineer recommendation and city council approval. Proposals must be submitted in sealed hard copy only by the deadline to the specified Hemet procurement address, with electronic submissions rejected. No contract value is disclosed as pricing fields in the bid schedule are blank, and the award will be granted to the lowest compliant bidder whose proposal meets all technical and regulatory requirements.

General Info

City of Hemet seeks bids for SB1 pavement rehab with AI cameras, drainage, ADA upgrades on multiple streets by August 27, 2026.

Agency

California → City of HemetView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Jacinto, CA, 92583, USA

Set-Aside

NONE

Documents

(1)

CIP 2511 SB1 Citywide Pavement Rehabilitation Bid Package

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Hemet
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Hemet
View Agency Profile
Office AddressN/A
Contacts
Jilleen FerrisP.E., Interim Public Works Director/City Engineer

Full Description

Show more
Bid #2511: The project involves citywide pavement rehabilitation, including removal and replacement of existing pavement with full depth reclamation, striping, curb ramp replacement, ADA improvements, adjustment of existing utilities, concrete replacement, and grading. Key tasks include installing AI-powered traffic camera systems, constructing drainage ditches and concrete basins, and removing trees. The work is located across multiple streets: Menlo Ave from San Jacinto Ave to Park Ave, Park Ave from Menlo Ave to Dartmouth St, Carmelita St from Mayberry Ave to Whittier Ave, and Wentworth Dr from Cawston Ave to Sanderson Ave. The contractor is responsible for all labor, materials, equipment, and services to complete the project in strict accordance with contract documents, including adherence to prevailing wage laws and environmental controls.

Similar Contracts

Same NAICS industry code