Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SB1383 Procurement Requirement for Recovered Organic Waste Product (Renewable Energy, Electricity)

Closed
12601984State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221117
SLED
PA-2500075 (C)
Solicitation # PA-2500075
San Joaquin County has initiated a conditional use permit process for the construction and operation of a manure anaerobic digestion facility on an existing 78.8-acre dairy property in Manteca, California, situated on a 2.9-acre portion of the site. The project involves installing two above-ground concrete digesters, each measuring 40 feet wide by 180 feet deep and approximately 12.5 feet high, with a rubber bladder lining and a concrete base, to process dairy manure wastewater pumped from existing lagoons approximately 100 yards away. Biogas produced from the digestion process will be upgraded to renewable natural gas (RNG), compressed, and loaded onto specialized gas trucks for offsite distribution, with an estimated monthly volume of 12 truck trips once operational. A third external bladder will serve as emergency methane gas containment, eliminating the need for a combustion flare. The project aligns with renewable energy objectives under the biomass category and is expected to achieve a 29% reduction in greenhouse gas emissions compared to a 2002–2004 baseline, in compliance with San Joaquin Valley Air Pollution Control District’s Best Performance Standards. Emissions are required to remain below thresholds of 10 tons per year for NOx and 0.1 tons per year for PM2.5, with adherence to CEQA, the California Building Code, the California Energy Code, and the SJVAPCD Order R5-2010-0130. The facility is subject to rigorous environmental review under the California Environmental Quality Act and must comply with multiple regulatory frameworks, including water quality standards from the Central Valley Regional Water Quality Control Board, noise ordinances under San Joaquin County Development Code Chapter 9-404, and mitigation obligations under the San Joaquin County Multi-Species Habitat Conservation and Open Space Plan due to impacts on biological resources. Inspections and compliance verification are conducted on-site by the lead agency, San Joaquin County Community Development Department, in coordination with the SJVAPCD and other regulatory bodies. Administrative acceptance of the permit is handled through county offices in Stockton, with no formal contract type or financial terms outlined since this is a regulatory permitting action, not a federal procurement. The solicitation number PA-2500075 (C) relates to the Conditional Use Permit application, with submissions due by June 26, 2026, through the San Joaquin Online
San Joaquin County

POSTED

about 1 month ago

DEADLINE

N/A
NAICS: 221117
SLED
Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.
Solicitation # PLN25-00046
The Euismod Energy Storage Project, managed by Euismod Project LLC and Euismod Project I, LLC, involves the development of a battery energy storage system (BESS) facility in southeastern Kern County, California. The facility will utilize lithium-ion batteries to store approximately 1,150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid on a 120-acre site. Key infrastructure includes battery storage arrays, collector substations, SCADA systems, microwave communications towers, and two 230-kV overhead transmission lines connecting to the Southern California Edison Whirlwind Substation. The project requires several land-use entitlements, including a Zone Change, Conditional Use Permits, Zone Variance, and Nonsummary Street Vacations. The project is subject to rigorous environmental and safety standards, including CEQA and NEPA compliance, with specific adherence to NFPA 855 for battery enclosure spacing and NFPA 70E for electrical work. Construction is expected to last approximately two years, with an anticipated operational life of 35 years and a decommissioning period of up to 12 months. The project will utilize union labor with wages meeting IRS prevailing wage standards and must comply with OSHA and California Fire Code requirements. Administrative oversight is provided by the Kern County Planning and Natural Resources Department, with Keith Alvidrez serving as the primary project planner.
Kern County

POSTED

8 months ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract seeks the procurement of 43,750 tons of recovered organic waste product to be converted into renewable energy, including transportation fuel, electricity, and gas for heating, via anaerobic digestion, or alternatively through biomass conversion for electricity generation. The energy produced will provide compliance attributes to satisfy the Buyer’s obligation under California’s SB1383, specifically to meet the mandate for Procurement of Recovered Organic Products by Local Jurisdictions for the calendar year 2025. The procurement is tied directly to regulatory compliance and requires verification that the delivered energy is derived from organic waste streams processed in compliance with state environmental standards. The solicitation, identified by number 12601984, was posted on June 16, 2026, with a response deadline of July 7, 2026. It is issued by the Solid Waste Department of the City of Fresno, a state and local government entity operating under the State of California. All performance and delivery must align with the regulatory goals of SB1383 and likely require documentation of waste sourcing, processing methods, and energy output validation. Primary point of contact for inquiries is Sean Miranda, reachable via purchasing@fresno.gov, and all submissions must be made through the PlanetBids vendor portal linked in the solicitation.

General Info

Procure 43,750 tons of recovered organic waste for SB1383 compliance via anaerobic digestion or biomass conversion in 2025.

Agency

California → Public Utiliites - Solid Waste Department of City of FresnoView Agency

NAICS

221117 - Biomass Electric Power GenerationView NAICS

Place of Performance

1325 E El Dorado St Fresno, California 93706, CA, USA

Set-Aside

NONE

Documents

(2)

12601984 Renewable Energy Final.pdf

PDF

12601984 Notice Inviting Bids.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Utiliites - Solid Waste Department of City of Fresno
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Public Utiliites - Solid Waste Department of City of Fresno
View Agency Profile
Office AddressCA, USA
Contacts
Sean MirandaContact

Full Description

Show more
Scope: 43,750 tons recovered organic waste product – Renewable energy (transportation fuel, electricity, and gas for heating) from anaerobic digestion, OR Electricity from biomass conversion, for compliance attributes for Buyer to satisfy its “Procurement of Recovered Organic Products by Local Jurisdictions” requirement of SB1383 for the calendar year 2025.