Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Department of Water and Power is implementing the Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project to enhance the resilience and reliability of its power system. This project involves replacing existing natural-gas-fired steam-boiler generators with a rapid-response combined-cycle generation system consisting of a combustion-turbine generator and a steam-turbine generator operating in tandem. The new system will be capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. Supporting infrastructure will include an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated industrial wastewater discharge pipeline. The project is designed to support a carbon-free energy system, primarily serving as a firm local generation source to meet peak electrical demand or emergency shortages when renewable energy and storage are unavailable. While the system is hydrogen-ready, the LADWP will act as a purchaser of green hydrogen rather than managing the production infrastructure. Construction is expected to begin in 2026, with full commissioning anticipated by the end of 2029. The project has undergone environmental review in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination confirming that the project will not have a significant environmental effect.

General Info

LADWP will modernize Scattergood Station with hydrogen-ready generators by 2029 for power resilience.

Agency

California Los Angeles Department of Water and Power

Place of Performance

Vista Del Mar and Grand Avenue, Los Angeles, CA, 90293

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

Notice details unchanged. Attachments may have changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Jazmin MartinEnvironmental Specialist

Full Description

Show more
The Los Angeles Department of Water and Power (LADWP) proposes to construct and operate a rapid-response combined-cycle generation system (CCGS) at Scattergood Generating Station. The Proposed Project would replace the generation capacity of existing Scattergood Units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a CCGS capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed CCGS would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed CCGS include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge. With the implementation of expanded renewable generation resources, improvements to transmission systems, increased energy storage, and other elements of the LADWP carbon-free energy system outlined in the SLTRP, LADWP’s in-basin generation units, including the Proposed Project, are anticipated to be utilized less frequently than under current conditions, primarily to meet peaks in the requirement for electrical power during high demand days that exceed renewable energy production and energy storage capacity. In addition, the CCGS would be used during relatively short-term periods when the renewable generation sources and/or transmission assets become unavailable due to emergency circumstances. Therefore, although anticipated to be operated less frequently, this firm local generation capability is crucial to maintaining the resilience and reliability of the LADWP power system. The necessary infrastructure for the production, delivery, and storage of green hydrogen needed to support the Proposed Project currently does not exist. While it is anticipated that a sufficient market supply of green hydrogen may be available to support the Proposed Project dual-fuel CCGS when it is fully commissioned by the end of 2029, the details of the green hydrogen system are currently unknown. Therefore, this DEIR does not address the supply of green hydrogen to Scattergood Generating Station, which will be analyzed in a separate environmental review and approval process when the necessary information to support an adequate analysis of potential impacts is available. LADWP would not implement or operate this hydrogen infrastructure but would be a purchaser of hydrogen to supply the Proposed Project. Nonetheless, because the combustion-turbine generator component of the proposed CCGS would be capable of operating on a mixture of natural gas and hydrogen fuel, the impacts related to the combustion of such a fuel mixture are analyzed in this DEIR. Construction of the Proposed Project is anticipated to begin in 2026 and the CCGS would be fully operational by the end of 2029.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence and industry capability assessments for the construction of an F-15EX 8-Bay Maintenance Hangar Complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project, estimated between 150 million and 200 million dollars, involves the creation of an environmentally safe and energy-efficient complex to support 21 Primary Aircraft Authorization F-15 EX aircraft. The scope includes the demolition of buildings 3, 5, 117, and 120, the construction of new parking, and necessary utility and infrastructure upgrades. The facility will be developed in three phases: Hangar 1 for corrosion control and fuel cell maintenance, Hangar 2 as a 4-bay maintenance hangar, and Hangar 6 for munitions and training. The government is considering a fixed-price Other Transaction Agreement under 10 U.S.C. section 2808a, with funding potentially phased at approximately one-third of the total cost per fiscal year. Design completion is anticipated for early 2027. All construction must adhere to DoD, Air Force, and base design standards, including strict antiterrorism, force protection, and flood plain requirements. Interested firms must provide information regarding their bonding capacity, experience with mission-critical operational facilities, and potential labor constraints. An Industry Day is scheduled for December 8, 2026, at the Selfridge Air National Guard Base Dining Facility, with registration required for up to three participants per company.
W7NF Uspfo Activity Miang 127

POSTED

3 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS