Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Department of Water and Power is implementing the Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project to enhance the resilience and reliability of its power system. This project involves replacing existing natural-gas-fired steam-boiler generators with a rapid-response combined-cycle generation system consisting of a combustion-turbine generator and a steam-turbine generator operating in tandem. The new system will be capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. Supporting infrastructure will include an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated industrial wastewater discharge pipeline. The project is designed to support a carbon-free energy system, primarily serving as a firm local generation source to meet peak electrical demand or emergency shortages when renewable energy and storage are unavailable. While the system is hydrogen-ready, the LADWP will act as a purchaser of green hydrogen rather than managing the production infrastructure. Construction is expected to begin in 2026, with full commissioning anticipated by the end of 2029. The project has undergone environmental review in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination confirming that the project will not have a significant environmental effect.

General Info

LADWP will modernize Scattergood Station with hydrogen-ready generators by 2029 for power resilience.

Agency

California Los Angeles Department of Water and Power

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Vista Del Mar and Grand Avenue, Los Angeles, CA, 90293

Set-Aside

NONE

Documents

(3)

Scattergood Modernization Project - Final Environmental Impact Report

PDFfinal-eir

Scattergood Modernization Project Notice of Determination

PDFnotice-of-determination

Scattergood Modernization Project - Notice of Determination for Appeal Denial

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Jazmin MartinEnvironmental Specialist

Full Description

Show more
The Los Angeles Department of Water and Power (LADWP) proposes to construct and operate a rapid-response combined-cycle generation system (CCGS) at Scattergood Generating Station. The Proposed Project would replace the generation capacity of existing Scattergood Units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a CCGS capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed CCGS would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed CCGS include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge. With the implementation of expanded renewable generation resources, improvements to transmission systems, increased energy storage, and other elements of the LADWP carbon-free energy system outlined in the SLTRP, LADWP’s in-basin generation units, including the Proposed Project, are anticipated to be utilized less frequently than under current conditions, primarily to meet peaks in the requirement for electrical power during high demand days that exceed renewable energy production and energy storage capacity. In addition, the CCGS would be used during relatively short-term periods when the renewable generation sources and/or transmission assets become unavailable due to emergency circumstances. Therefore, although anticipated to be operated less frequently, this firm local generation capability is crucial to maintaining the resilience and reliability of the LADWP power system. The necessary infrastructure for the production, delivery, and storage of green hydrogen needed to support the Proposed Project currently does not exist. While it is anticipated that a sufficient market supply of green hydrogen may be available to support the Proposed Project dual-fuel CCGS when it is fully commissioned by the end of 2029, the details of the green hydrogen system are currently unknown. Therefore, this DEIR does not address the supply of green hydrogen to Scattergood Generating Station, which will be analyzed in a separate environmental review and approval process when the necessary information to support an adequate analysis of potential impacts is available. LADWP would not implement or operate this hydrogen infrastructure but would be a purchaser of hydrogen to supply the Proposed Project. Nonetheless, because the combustion-turbine generator component of the proposed CCGS would be capable of operating on a mixture of natural gas and hydrogen fuel, the impacts related to the combustion of such a fuel mixture are analyzed in this DEIR. Construction of the Proposed Project is anticipated to begin in 2026 and the CCGS would be fully operational by the end of 2029.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS