Sedalia ES Flooring Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Sedalia Flooring Replacement project, identified as project number 25173.00, is a solicitation by Sedalia School District 200 for a general contract covering all trades. The scope of work involves roof replacement across multiple district facilities, including Sedalia Middle School, Smith Cotton High School, Smith Cotton Junior High School, and several elementary schools: Heber Hunt, Washington, Horace Mann, Skyline, and Parkview. The project is managed by Hollis + Miller Architects, with Chris Pyle serving as the owner's representative and Marta Fears as the architect's representative. Prequalified bidders must attend a mandatory prebid conference on October 29, 2026, at 2:30 p.m. at the Smith-Cotton High School football locker room. Sealed bids are due by November 10, 2026, at 11:00 a.m. local time at the Sedalia Central Office. The project is subject to Missouri prevailing wage determinations for Pettis County, and the school district is tax exempt. All bidding procedures must comply with applicable Missouri laws.
General Info
Place of Performance
Sedalia, MO, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (4)
See All 4 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Sedalia Middle School – 2205 South Ingram Avenue, Sedalia, Missouri 65301
Heber Hunt Elementary School – 600 South Warren Avenue, Sedalia, Missouri 65301
Washington Elementary School – 610 South Engineer Avenue, Sedalia, Missouri 65301
Horace Mann Elementary School – 1100 West 16th Street, Sedalia, Missouri 65301
Skyline Elementary School – 2505 West 32d Street, Sedalia, Missouri 65301
Parkview Elementary School – 1901 South New York Avenue, Sedalia, Missouri 65301
Smith Cotton High School – 2010 Tiger Pride Boulevard, Sedalia, Missouri 65301
Smith Cotton Junior High School – 312 East Broadway Boulevard, Sedalia, Missouri 65301
Prepared For:
Sedalia School District 200
1700 South Lafayette Avenue
Sedalia, Missouri 65301
H+M Project No: 25173.00
Issue Date: October 20, 2026
Prepared By:
Hollis + Miller Architects
1828 Walnut Street, Suite 922
Kansas City, Missouri 64108
+1 (555) 000-0000
1.1 PROJECT INFORMATION
A. Notice to Bidders: Prequalified bidders are hereby invited to submit bids for the Sedalia Flooring Replacement project. Bids shall be fully executed, signed and sealed in envelopes as described in this Document according to the Instructions to Bidders and as amended by the Supplementary Instructions to Bidders.
B. Project Identification: 25173.00 - Sedalia Flooring Replacement
C. Owner: Sedalia School District 200
1. Owner’s Address: 1700 South Lafayette Avenue, Sedalia, Missouri 653012. Owner’s Representative: Chris Pyle
a. Owner's Representative's Email: contact@example.gov
D. Architect:
1. Architect’s Address: Hollis + Miller Architects, Inc., 1828 Walnut Street, Suite 922, Kansas City, MO 64108
2. Architect’s Representative: Marta Fears
E. Project Description: Work of Project is defined by the Contract Documents and consists of the following:
1. Roof replacement as indicated.
F. Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
G. Bidders are advised that the School District is tax exempt pursuant to Sections 144.030.2 and 144.615, RSMo.
The School District will furnish the successful Bidder with current copies of their Missouri Project Exemption certificate and Missouri Tax Exemption Letter.
H. Bidders are further advised that a Prevailing Wage Determination prepared by the Missouri Division of Labor Standards is in effect on this project and may be obtained at the State of Missouri Department of Labor and Industrial Relations website located here: https://laborwebapps.mo.gov/dls/prevailingwage. Provisions of Section 290.262 CUM, Supp RSMo (2000) shall apply to this Project.
1. Provide the current edition of the Annual Wage Order for the project's county - Pettis County as filed with the Secretary of State.
1.2 BID SUBMITTAL AND OPENING
A. Owner will receive sealed bids until the bid time and date at the location indicated below. Owner will consider bids prepared in compliance with the Instructions to Bidders issued by Owner, and delivered as follows:
1. Bid Date: November 10, 2026
2. Bid Time: 11:00 am local time.
3. Location: Sedalia Central Office, 1700 South Lafayette Avenue, Sedalia, Missouri 65301
B. Bids will be thereafter publicly opened and read aloud. Bids received after the bid time listed above will be returned to the Bidder unopened.
C. The bidding procedure shall be in accordance with all applicable provision of Missouri law, including but not limited to Mo. Rev, Statue. 177.086.
D. Bids shall not contain any recapitulation of the work to be done. No oral, telegraphic or telephonic proposals for modifications will be considered.
1.4 PREBID CONFERENCE
A. A mandatory prebid conference for all bidders will be held at on 10/29/2026 at 02:30p.m.. local time at Smith-Cotton High School - Tiger Stadium, football locker room", Prospective bidders are required to attend.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
