Segment 5 - Canby to Bieber
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Modoc County in California is forecasting a project for Segment 5, spanning from Canby to Bieber, to support fiber broadband infrastructure. The scope of work involves the installation of 3,900 feet of dual 1.5 inch HDPE conduit using directional boring. Boring depths must be maintained between a minimum of 36 inches and a maximum of 60 inches, with the addition of four new 3X5 vaults. Special requirements include the use of 5 inch HDPE encasement conduit when crossing Caltrans roadways, where a minimum depth of 48 inches must be maintained. The project is managed by the Modoc County Planning Department, with Sean Curtis serving as the primary point of contact.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
