Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Serv C26-134 Daily Freezer Replacement (Lay Up Room)

Closed
ServC26-134Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333415
New
DIBBS
REFRIGERATOR-FREEZER, S
Solicitation # SPE2DH-27-Q-0011
Solicitation SPE2DH-27-Q-0011 is a Firm Fixed Price request for quotation issued by the DLA Troop Support Medical Supply Chain for the procurement of portable, self-contained, solid-state refrigerator-freezer systems (NSN 4110-01-629-9593). These units are designed for the safe transport of biological materials, including vaccines, medications, and blood products, and must support both cool mode (4 deg C) and freeze mode (-22 deg C). Technical specifications require a 56-liter compartment volume, a payload capacity of up to 60 blood units, and power compatibility with 100 to 250 VAC and 12-28 VDC sources. The systems must include internal fans for uniform temperature circulation, a multifunction LCD display, and an RS-232 serial port. The procurement is not a small business set-aside and requires strict adherence to medical and military standards. Items must be marked according to Medical Marking Standard No. 1, which supersedes MIL-STD-129, and require Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003. Packaging must be commercial and compliant with MIL-STD-2073-1E and DLA packaging requirements (RP001). Delivery is required within 30 days after order (ADO) on an FOB Destination basis to various locations, including Naval Med Readiness Logistics Cmd in Virginia, Ellsworth AFB in South Dakota, and international sites in Taiwan and Germany. Invoicing must be processed electronically through the Wide Area Workflow (WAWF) system.
MEDICAL SUPPLY CHAIIN FSH

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 333415
New
DIBBS
29--COOLER,LUBRICATING OIL
Solicitation # SPE7L5-27-Q-0033
Solicitation SPE7L5-27-Q-0033 is a request for the procurement of 187 engine lubricating oil coolers (NSN 2930-01-420-8624) for the Defense Logistics Agency Weapons Support Land Supplier Opns Engines. This is designated as a critical application item and must be manufactured in accordance with Basic Drawing NR 19207 12366033 Revision A and technical specifications MIL-PRF-46170E and MIL-P-53022B. The item requires components from Qualified Products List (QPL) or Qualified Manufacturers List (QML) sources. Delivery is required within 150 days after order, with a customer required delivery date of July 23, 2028, shipped FOB Destination to DLA Distribution Anniston in Alabama. The contract mandates a rigorous quality assurance process, requiring technical inspection and final acceptance at the actual manufacturing facility. Acceptance is based on zero non-conformances, and the contractor must provide all drawings and technical information for verification. Packaging must adhere to MIL-STD-2073-1E and MIL-STD-129, with specific requirements for Product Verification Test samples. The procurement is subject to strict export controls under ITAR and EAR, and requires CMMC Level 2 certification. Award will be based on best value, evaluating price, offered delivery, and past performance. Invoicing must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS ENGINES

POSTED

about 10 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The United States Air Force is conducting market research to identify qualified sources for a turnkey one-year service contract to replace the refrigeration systems for two walk-in freezers located in the layup room of Building 9001, Post F-16 at the Oklahoma City-Air Logistics Complex, Tinker Air Force Base, Oklahoma. The project requires the contractor to provide all labor, materials, tools, and equipment necessary to install new evaporator and condenser units capable of maintaining a -10 degree Fahrenheit setpoint. To comply with 2026 EPA requirements for new commercial refrigeration, systems must utilize low-GWP A2L refrigerants, with a preference for R454A. The existing freezer box panels and disconnect boxes must be reused without modification. The scope of work includes the pump down and disposal of existing systems, installation of new ACR hard copper piping, electrical connections compatible with single-phase 208V 60Hz power, and the replacement of two door gaskets per freezer. Key technical requirements specify an electric-defrost evaporator assembly (model EL26-079-2EC-PR-A or equivalent) and a condenser unit (model PC225ALZOP-2S or equivalent). The estimated total value for the replacement of both systems is 62,000 dollars. Interested offerors must demonstrate their capabilities under NAICS code 333415 and provide a procurement lead time not exceeding 10 weeks. Final deliverables include fully operational freezers, component drawings, manuals, and operator training.

General Info

USAF seeks contractor to replace two walk-in freezer refrigeration systems for 62,000 dollars.

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

Place of Performance

0, OK, 73145, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstsow
High
PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8125 Afsc Pzima
Contacts1 person available
OfficeTINKER AFB, OK, 73145-3303, USA
Office AddressTINKER AFB, OK, 73145-3303, USA

Full Description

Show more

Sources Sought Synopsis



Serv C26-134 Daily Freezer Replacement (Lay Up Room)



Tinker Air Force Base, OK






14 September 2026






Serv C26-134 Daily Freezer Replacement (Lay Up Room)



CAUTION:



This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for qualification and production of the Serv C26-134 Daily Freezer Replacement (Lay Up Room) for use by United States Air Force (USAF) personnel.  The level of security clearance and amount of foreign participation in this requirement has not been determined.  Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards.  The government will not reimburse participants for any expenses associated with their participation in this survey.



INSTRUCTIONS:



  1. Below is a document containing a description of the Serv C26-134 Daily Freezer Replacement (Lay Up Room) requirement and a Contractor Capability Survey, which allows you to provide your company’s capability.


  1. Performance Work Statement (PWS)


  1. If, after reviewing these documents, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements.  Failure to provide documentation may result in the government being unable to adequately assess your capabilities.  If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)
    1. Identify any areas of work that your organization believes should be broken out exclusively for Small Business.


  1. Both large and small businesses are encouraged to participate in this Market Research.  Joint ventures or teaming arrangements are encouraged.


  1. Questions relative to this market survey should be addressed to Tori Wallace, +1 (555) 000-0000 and contact@example.gov



Serv C26-134 Daily Freezer Replacement (Lay Up Room)




PURPOSE/DESCRIPTION



The Government is conducting market research to identify potential sources that possess the production data/repair data, expertise, capabilities, and experience to meet qualification requirements for the Daily Freezer Replacement (Lay Up Room) on/for Tinker Air Force Base (AFB). The intent is for the Government to secure a one-year service contract for these services.  Scope:  The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform replacing the existing refrigeration systems for two (2) walk in freezers located in the layup room in Building 9001, Post F-16 the Oklahoma City–Air Logistics Complex (OC-ALC).  The equipment is listed in Appendix A (On-Base).


The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS. The following descriptions are from the attached Performance Work Statement (PWS).



Requested Services:  The Contractor shall replace the existing refrigeration systems for two (2) walk-in freezers. The new refrigeration systems must be fully compatible with the existing electrical setup, power requirements (Single‑phase, 208 V, 60 Hz), and freezer box panels (9 ft × 9 ft × 8 ft 5 in). No modifications are permitted to the freezer box panels or their disconnect boxes. The existing freezer box panels will be reused.


This is a turnkey project, requiring the contractor to provide all labor, materials, equipment, and services necessary to deliver fully operational systems capable of maintaining a –10°F setpoint.


3. Contractor Responsibilities (Turnkey Scope)


3.1 Refrigeration Requirement


      1. Evaporator Unit Requirement
  • Shall be electric-defrost evaporator assembly, model EL26‑079‑2EC‑PR‑A or equivalent and be suitable for low‑temperature walk‑in applications
  • Shall be using low‑GWP A2L refrigerant and meets the EPA’s 2026 requirements for new commercial refrigeration systems. Prefer R454A refrigerant.
  • Performance requirements:
    • Cooling Capacity: 7,900 BTUH
    • Airflow: 1,600 CFM
    • Annual Walk‑In Energy Factor of 4.00 Btu/W‑h
    • Operating Modes: Off‑cycle, air defrost w/timer, electric defrost, demand electric defrost
  • Electrical Requirements:
    • Power Supply: 208–230V, 1‑phase, 60 Hz
    • Max Total Connected Load: 13.1A
    • Minimum Circuit Ampacity: 15A
    • Maximum Overcurrent Protection: 20A
    • Fan Motors: EC two‑speed motors, 1.0A @ 208–230V or equivalent
    • Defrost Heaters: 13.1A @ 208–230V or equivalent
    • Control Circuit: 24V transformer included
    • Electronic Temperature Control: Required (factory installed)
  • Mechanical Requirements:
    • Suction Connection: 5/8" ODF
    • Liquid Connection: 3/8" ODF
    • Drain Connection: ¾‑14 NPT
  • These following components shall be included with the Unit
    • Expansion valve (factory installed)
    • Digital temperature control (factory installed)
    • EC evaporator fan motors – two‑speed
    • Leak detection – two sensors required (factory installed)
    • Safety shut‑off / liquid line solenoid valve
    • Safety check valve


      1. Condenser Unit Requirement
  • Shall be designed for low‑temperature A2L (prefer R454A) refrigeration applications, model PC225ALZOP‑2S or equivalent.
  • Unit shall comply with AHRI 1250 test method
  • Annual Walk‑In Energy Factor of 3.15 or higher. Rating must meet DOE requirements.
  • Performance Requirements:
    • Compressor Model: Copeland YF07KAE‑PFV or equivalent with 2¼ Horsepower
  • Electrical Requirements
    • Power Supply: 208–230V, 1‑phase, 60 Hz
    • Compressor RLA: 12.4A or equivalent
    • Compressor LRA: 88A or equivalent
    • Condenser Fan Motor FLA: 1.1A or equivalent
    • Max Total Unit Amps: 13.7A
    • Minimum Circuit Ampacity (MCA): 16.8A
    • Maximum Overcurrent Protection (MOPD): 25A
  • Mechanical Requirements
    • Total Heat Rejection of 14,209 BTUH or equivalent to maximize the entire system efficiency
  • Refrigerant Piping Requirements
    • Suction Line: 7/8" OD
    • Liquid Line: 3/8" OD
  • Controls & Safety Requirements: Unit shall include the following controls as a minimum
    • High‑pressure control
    • Low‑pressure control
    • High discharge cut‑out switch
    • Time delay relay
    • Fan cycle head pressure control
    • Crankcase heater
    • Electric defrost timer

3.2 Removal and Disposal


  • Pump down and safely remove the existing refrigeration systems from both units.
  • Properly dispose of all removed equipment and refrigerant in accordance with industrial regulations.

3.3 Procurement and Delivery


  • Procure new refrigeration systems compatible with the existing electrical and mechanical configuration.
  • Deliver all equipment to the project site.
  • Provide all required materials, hardware, and accessories.
  • Provide all labor, equipment, materials, and tools required for complete installation.
  •  Supply only new, commercially available equipment—no prototype or experimental models.

3.4 Installation Requirements


The contractor shall:


  1. Meet delivery trucks and off‑load refrigeration equipment.
  2. Install new refrigeration condensers and evaporators.
  3. Provide nylon all‑thread and stainless‑steel hardware for evaporator coil suspension.
  4. Install new ACR hard copper piping and 1" thick‑wall suction line insulation.
  5. Provide all unistrut, hangers, brackets, trapeze supports, pipe clamps, all‑thread, and anchors as needed.
  6. Provide all fittings, silver solder, welding supplies, and labor required for refrigeration piping.
  7. Perform leak checks with nitrogen, pull vacuum, and charge the system with new refrigerant.
  8. Perform all electrical work, including:
    • Disconnecting power from existing units
    • Removing conduit and demolition as required
    • Reinstalling receptacles in their current locations
    • Providing new power connections from existing disconnects to the new evaporators and condensing units
    • Mounting and wiring lights
    • Installing new seal‑offs at penetration points and GRC inside the freezers
  9. Install drains, furnish and install heat tape (if required), and insulate drain lines.
  10. Start up all refrigeration systems, set pressure switches and controls, calibrate thermometers, and verify temperature performance.
  11. Seal all refrigeration penetrations.
  12. Replace two (2) door gaskets per freezer.


4. System Performance Requirements


The completed installation must deliver:


  • Fully operational refrigeration systems
  • Ability to maintain a –10°F setpoint under normal operating conditions
  • Proper integration with existing freezer box panels and electrical infrastructure


5. Startup and Training Requirements


The Contractor shall:


a. Conduct full system startup and functional testing to verify proper operation of all installed components.



6. Deliverables at Time of Solicitation (Offeror Requirements)


The Offeror shall provide:


a. Detailed descriptions, specifications, and sketches demonstrating compliance with this Statement of Work (SOW).


b. Justification for any proposed alternative solutions, demonstrating how they meet or exceed the requirements.



7. Deliverables at Time of Installation (Contractor Requirements)


The Contractor shall provide:


a. Fully installed and operational freezers capable of achieving a –10°F setpoint.


b. New refrigeration system component drawings.


 c. All manuals and parts lists associated with the newly installed equipment.


d. Operator training and supporting documentation.



8. Schedule Requirements


The contractor shall include in the proposal:


  • Lead time for procurement and delivery. Lead time shall not be more than 10 weeks.
  • Service time required to complete installation for both freezers

More opportunities from Department Of Defense → FA8125 Afsc Pzima

Same awarding agency

NAICS: 333924
New
Federal
Electric Tow Tractor
Solicitation # FA812527Q0005
Solicitation FA812527Q0005 is a firm-fixed-price request for the procurement of one seated, battery-powered electric tow tractor for delivery to Tinker AFB, Oklahoma. This requirement is specifically set aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS code 333924. The equipment must feature a tow rating between 12,000 and 16,000 pounds, a minimum top speed of 6 mph, and a 48V battery system compatible with Anderson Connectors providing at least six hours of use. Physical constraints limit the tractor to a maximum size of 85 inches long, 40 inches wide, and 55 inches high, with a tricycle wheel configuration and a clevis pin style hitch. Award will be based on a technically acceptable and lowest total evaluated price basis, with the government reviewing the three lowest-priced proposals for technical compliance. Offerors must provide a detailed written statement explaining how they meet all technical criteria, as simple concurrence is insufficient. Key safety requirements include a foot brake, parking brake, high-visibility lighting, and an audible backup alarm. The contractor is responsible for FOB Destination delivery and must comply with MIL-STD-130 and MIL-STD-129 for item identification and marking. Payment will be processed electronically through the Wide Area WorkFlow system. The solicitation closing date has been extended to November 6, 2026, at 12:00 PM CST.
Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333517
Federal
A27-017 Fiber Laser Metal Marking Tool
Solicitation # FA812527Q0006
Solicitation FA812527Q0006 is a Firm Fixed Price contract issued by the Air Force Sustainment Center's Maintenance Contracting Branch at Tinker AFB, Oklahoma. The Department of Defense is seeking the procurement of two compact, benchtop fiber laser metal marking workstations, such as the Brady Lightwriter or an equivalent. These industrial tools are required to create high-resolution, machine-readable identifiers, including 2D barcodes and permanent text, on various metal tools and tags. Key technical specifications include a 20W variable-pulsed MOPA laser with a 1064nm wavelength, a solid state control system, a pulse range of 1-350ns, and a Class II 635nm laser diode. The equipment must include a two-year warranty, and while a PC is optional, the units must feature available Ethernet ports. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) basis. Offerors must submit a completed quote sheet and provide comprehensive manufacturer literature, data sheets, or certifications to demonstrate that the equipment meets all salient characteristics. Quotes are due by November 10, 2026, and must be submitted via email to the designated contract specialist and contracting officer. Shipping is designated as FOB Destination to Tinker AFB, and all freight costs must be included in the quoted price. Payment will be processed through the Wide Area Workflow (WAWF) application with default Net 30 terms upon government acceptance of the items.
Machine Tool Manufacturing

POSTED

7 days ago

DEADLINE

in 7 days
View Details
NAICS: 334519
Federal
A27-022 Videoscope
Solicitation # FA812527Q0004
Solicitation FA812527Q0004 is a Total Small Business Set-Aside for a Firm Fixed Price contract to procure commercial off-the-shelf Industrial HD articulating 4mm videoscopes for the Air Force Sustainment Center at Tinker AFB, Oklahoma. These devices are used for engine inspections to identify imperfections and foreign object debris. The requirement specifies a system with a 3 to 6 meter insertion tube, 4-way 120-degree articulation controlled by a joystick, and a 6.5 to 12 inch backlit color touchscreen display with a minimum resolution of 1,920 x 1,080 pixels. Key capabilities include 3D surface modeling, live measurements, battery power, and support for JPEG and MP4 formats, with a total system weight not exceeding 20 pounds. Award will be based on the Lowest Price Technically Acceptable (LPTA) criteria, evaluating whether the offered item meets all minimum salient characteristics and technical specifications. Offerors must provide manufacturer literature and certifications to demonstrate compliance. Quotes are due by November 2026 and must be submitted via email to the designated contract specialists. Delivery is required FOB Destination to Tinker AFB, and all shipping costs must be included in the quoted price. Invoicing and payments will be processed through the Wide Area Workflow application with default Net 30 terms.
Other Measuring and Controlling Device Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 488190
Federal
Advanced Fuel Accessories Test System (AFATS) 02-02 Upgrades
Solicitation # H7TC13
The Air Force is seeking a small business contractor to perform upgrades on the Advanced Fuel Accessories Test System (AFATS) 02-02 Test Stand and its associated calibration cart at Tinker AFB, Oklahoma. The primary objective is to replace obsolete Honeywell doser modules, instruments, sensors, and AC/DC power supplies with commercial off-the-shelf (COTS) equivalents. The upgraded system will be used to test fuel flow proportioners, float valves, refueling receptacles, and transfer pumps. The project includes the delivery of upgraded hardware, comprehensive training on maintenance and calibration, and the provision of all necessary components and parts. This is a firm-fixed-price effort under NAICS 488190, with final acceptance conducted at Tinker AFB following successful functional testing, AFMETCAL certification, and the submission of detailed validation and vibration reports. The contractor is responsible for the packaging and shipping of government furnished property at their own expense and must adhere to strict technical standards, including MIL-STD-461E for EMI controls and NFPA 70 Article 500 for electrical safety in hazardous environments. Key deliverables follow a strict timeline after the date of contract, including a Preliminary Design Review by 60 days, an Intermediate Design Review by 75 days, and a Critical Design Review by 90 days. High security and quality standards are mandated, including NIST SP 800-161 for supply chain risk management, Section 889 NDAA compliance, and a minimum 730-day warranty on all equipment and workmanship. Proposals must demonstrate past performance on similar fuel or hydraulic test stand projects and confirm the availability of a National Instruments Certified LabVIEW Architect and a Mechanical Engineer.
Other Support Activities for Air Transportation

POSTED

11 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS