Service Contract Correct Suicide Prevention Deficiencies, PG1 and PG2

Awarded
36C26226C0151Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)

Contract Value

$264,308

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

San Diego, CA, 92161, USA

Set-Aside

SDVOSBC

Awardee

JT West Construction, Inc.View Profile

Award Issued Date

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Posted

award-notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)
Contacts1 person available
OfficeGilbert, AZ, 85297, USA
Organization / Agency
Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)
Office AddressGilbert, AZ, 85297, USA
Contacts

Full Description

Show more

This requirement is for construction services to perform a Design/Build service that includes the installation of fall netting at PG-2 Level 1, and metal fencing at PG-1 north end, Level 2.  


  1. Area of work:

The project work area is at PG-1 Level 2 north end, and PG-2 Level 1 at center west end. The construction will take place on government owned land at the Jennifer Moreno VA Medical Center. The Contractor will need to provide a cost proposal based on the Scope of Work.


  1. Project Requirements:

The scope of work for this project consists of designing, furnishing, installing, and removing the following:


  1. The design shop drawings and construction of a metal suicide prevention wall:

  1. Concrete Anchor Bolts for plate attachments (to match existing plate attachment specifications)
  2. Fabrication of new metal wall framing to match existing in form, material and color
  3. Attachment of specified metal paneling to framework
  4. Installation of ‘angled metal panel stepping prevention elements’ at column tops for climbing prevention
  5. Existing chain-link fence pole relocation at NE corner
  6. Specifically, Includes:

  • Demolish approximately 100 linear feet existing metal railing at the north upper level indicated on sheet A-1.1
  • Demolish approximately 160 linear feet of existing metal guardrail and embedded post anchors at the light well area indicated on sheet A-1.0
  • Patch concrete walls at areas of guard rail demolition to match existing finish.
  • Install new wedge anchor eye bolts @ 4’ off center indicated on plans
  • Provide 3rd party pull testing for eye bolts installation
  • Install new 177’x10’4” safety netting in light well
  • Fabricate and install new metal railing with 2”x2” galvanized tube steel railing with stainless steel metal corrugated mesh to match existing rail on PG-1
  • Clean up and demobilize

  1. The installation of suicide prevention fall netting:

  1. Removal of existing metal fencing and repair.
  2. Installation of new wedge anchor eye bolts
  3. Provide suicide prevention netting per specification
  4. Attachment of new safety netting
  5. Specifically, Includes:

  • 18 Gauge Stainless Steel T304 2B Perforated 3/8” Dia. on 1/2” Staggered Center panels mounted on 5 prefabricated sections of fencing frames from; 1.25" x 2" x 2" pre-galvanized square tube, 1/2" x 6" x 18" galvanized mounting plates anchored onto concrete to match existing fencing and drawings provided for parking structure. We will use a combination of a 2-man extended boom lift and reach forklift with jib to complete the work. After fencing frame is erected and anchored a welder will complete final points of connection. The corrugated panels will then be installed by being fastened to galvanized frame and supported by stainless steel J-Mold. We understand some of this work may have to be completed after ours and/or on weekends.

  1. The general design will need to include approved heights, materials, colors, and form, which will be provided by the VASD COR Representative.
  2. Only two design shop drawings submissions (50 and 100) % are required.
  3. Need to post permits in accordance with VASD Safety Office and Infection Control Department.
  4. Notify the COR and cc the CO of any activity outside the working hours. A VA representative should always be present.
  5. An independent third-party reviewer (PE CA licensed) is mandatory.
  6. The Master Construction Specification site is https://www.cfm.va.gov/til/spec.asp

Similar Contracts

NAICS: 236220
New
SLED
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Lockers, Signage, Final CleanSwinerton is inviting qualified subcontractors and suppliers to prequalify for a collaborative design-build project at the California State University Bakersfield campus. The project involves the design and construction of a new 56,500 gross square feet Energy and Innovation Building, which will feature offices, research and teaching laboratories, a capstone design lab, an event space with flexible design, and outdoor engagement areas. This public works project is subject to prevailing wage requirements and includes specific trade bid packages such as signage, final cleaning, and solid phenolic core lockers. There is a required Disabled Veteran Business Enterprise (DVBE) participation goal of 6%. Interested subcontractors must submit completed prequalification forms by July 2, 2026, with trade bid packages expected to be posted on June 12, 2026. Construction is anticipated to start on January 1, 2026, and is scheduled for completion by June 16, 2027. Required submittals include the Swinerton Builders Prequalification form and the Master Service Agreement. For further information or to prequalify, subcontractors are directed to contact the Swinerton Prequalification Team via the provided email. Relevant documents and updates can be accessed through Swinerton’s subcontractor prequalification portal.
CSU, Bakersfield

POSTED

about 23 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Lake Mountain School District Design-Build Services Centralized District Operations & Institutional FacilityThis contract involves awarding a single Design-Build team a turnkey project to provide comprehensive services including civil engineering, architectural and structural design, utility extension, permitting, procurement, and full construction for a new approximately 25,000 square foot pre-engineered steel institutional facility. The facility will be located on a seven-acre site owned by the Lake Mountain School District in Utah County and is intended to consolidate the district's centralized operations, administrative functions, public assembly spaces, technical departments, and specialized student services into one integrated campus. The successful offeror will hold single-point responsibility for all design and construction phases, ensuring coordination and completion under one contract. The procurement is managed by Alpine School District's Department of Purchasing on behalf of Lake Mountain School District, with the solicitation number LMSD06292026. Proposals must be submitted by 4:00 PM Mountain Time on June 29, 2026. The contract duration is project-based, with construction expected to begin on October 15, 2026, and substantial completion targeted for June 2027. The selection will be made based on the highest score that meets the procurement code criteria, emphasizing responsiveness and responsibility of the proposing Design-Build teams.
Utah

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details