Sewer Lift Station S-7 Reconstruction Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Long Beach is planning the reconstruction of Sewer Lift Station S-7 to meet current municipal standards and ensure its long-term operational viability. The project entails the complete demolition of the existing lift station and the construction of a new circular wet well equipped with submersible pumps, along with a rectangular valve vault and flow meter vault to enhance system control and monitoring. A new 8-inch-diameter sewer main, approximately 1,450 linear feet in length, will be installed within existing city rights-of-way to connect the new station to the broader sewer infrastructure. A dedicated generator building with associated electrical systems will also be constructed to provide reliable backup power. Upon completion, the upgraded facility will deliver a total pumping capacity of 860 gallons per minute and maintain force main flow velocities between three and six feet per second, ensuring efficient and sustainable wastewater conveyance. The site is not identified as a hazardous materials location under state guidelines, and all work will occur within established public corridors to minimize environmental and community disruption.
General Info
Agency
NAICS
Place of Performance
Lakeview Avenue, Monrovia Avenue, Appian Way, Long Beach, CA, 90803Set-Aside
Documents
(15)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
