Sewer Lift Station S-7 Reconstruction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Long Beach is planning the reconstruction of Sewer Lift Station S-7 to meet current municipal standards and ensure its long-term operational viability. The project entails the complete demolition of the existing lift station and the construction of a new circular wet well equipped with submersible pumps, along with a rectangular valve vault and flow meter vault to enhance system control and monitoring. A new 8-inch-diameter sewer main, approximately 1,450 linear feet in length, will be installed within existing city rights-of-way to connect the new station to the broader sewer infrastructure. A dedicated generator building with associated electrical systems will also be constructed to provide reliable backup power. Upon completion, the upgraded facility will deliver a total pumping capacity of 860 gallons per minute and maintain force main flow velocities between three and six feet per second, ensuring efficient and sustainable wastewater conveyance. The site is not identified as a hazardous materials location under state guidelines, and all work will occur within established public corridors to minimize environmental and community disruption.

General Info

Long Beach重建S-7污水提升站,新建泵井、阀门 vault、8英寸管道1450英尺及备用发电机,实现860加仑/分钟容量。

Agency

California → City of Long Beach

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Lakeview Avenue, Monrovia Avenue, Appian Way, Long Beach, CA, 90803

Set-Aside

NONE

Documents

(15)

Appendix A - Long Beach Sewer Lift Station S-7 CalEEMod Input and Emissions Report

PDFsupporting-document

Sewer Lift Station S-7 Reconstruction Project Draft Initial Study/Mitigated Negative Declaration July 2026

PDFismnd

Geotechnical Evaluation S-7 Sewer Lift Station Rehabilitation Long Beach Water Department

PDFgeotechnical-evaluation

Sewer Lift Station S-7 Reconstruction Project Summary Form

PDFsummary-form

Appendix D - CAAP Greenhouse Gas Emission Reduction Action Consistency Checklist

PDFchecklist

Noise and Vibration Study for Sewer Lift Station S7 Reconstruction Project

PDFtechnical-memorandum

Biological Resources Letter for Sewer Lift Station S-7 Reconstruction Project

PDFother

Sewer Lift Station S-7 Reconstruction Project Notice of Completion

PDFnotice-of-completion

Sea Level Rise and Coastal Flooding Study Memorandum for Sewer Lift Station S-7 Reconstruction Project

PDFstudy-memorandum

Phase I Environmental Site Assessment for 349 Lakeview Avenue, Long Beach CA

PDFenvironmental-assessment

Cultural Resource Technical Study for Sewer Lift Station S-7 Reconstruction Project

PDFtechnical-memorandum

AB 52 Consultation Invitation for Sewer Lift Station S-7 Reconstruction Project

PDFspecial-notice

Appendix K - Mitigation Monitoring and Reporting Program for Sewer Lift Station S-7 Reconstruction

PDFmitigation-monitoring-reporting-program

VMT Memorandum for Sewer Lift Station S-7 Reconstruction Project

PDFmemo

Sewer Lift Station S-7 Reconstruction Project NOI MND July 2026

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Long Beach
Office AddressN/A
Contacts
Sergio GutierrezPlanner V
Myung ChunProject Engineer
Clint MeyerEnvironmental Planner

Interested Companies (1)

Show more
HDR
San Diego, CA

Full Description

Show more
The proposed Project involves the reconstruction of the existing Sewer Lift Station S-7 to conform with current City standards and facilitate continued long-term use. Proposed improvements include the demolition of the existing lift station and the installation of a new circular wet well with submersible pumps and a rectangular valve vault and flow meter vault. Additionally, a new 8-inch-diameter sewer main would be constructed to connect the existing sewer infrastructure to the new wet well. The total length of pipeline installed would be approximately 1,450 linear feet in existing City rights-of-way. The proposed Project would also install a new generator building with associated electrical equipment. Upon completion, the proposed Project would provide a total pumping capacity of 860 gallons per minute and a force main flow velocity of between three (3) to six (6) feet per second. The Project is not located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5.