Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sewer Line Installation – Lake George

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves the installation of new sewer lines, encompassing all necessary steps such as excavation, trench preparation, bedding, backfill, compaction, and proper waste disposal. These activities must adhere to the standards set by the Colorado Department of Transportation (CDOT) and the specifications outlined in Section 312317. The project is designated as a subcontract and is set aside exclusively for small businesses under the SBA Total Small Business Set-Aside program (FAR 19.5), with the primary NAICS code 237110, which relates to sewer and water line construction. Issued by the Department of Agriculture under the Csa Intermountain 8 Usda-Fs agency, this contract is located in the area with the zip code 80433, although specific city and state details are not provided. The solicitation was posted on June 1, 2026, and responses must be submitted by July 13, 2026, at 4:00 PM. While contact details and a physical address for the office are not listed, the project is publicly accessible via the SAM.gov workspace link, which provides additional information and documentation related to the opportunity.

General Info

Small business subcontract for sewer line installation, adhering to CDOT standards, deadline July 13, 2026.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CO, 80433, USA

Set-Aside

SBA

Documents

This scope was carved out of 1240LT26Q0090.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pike Underground Utility Upgrade

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new sewer lines including excavation, trench preparation, bedding, backfill, compaction, and waste disposal in compliance with CDOT and Section 312317 standards.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237310
New
Federal
Selkirk to Surf Road Maintenance
Solicitation # 1240LT26Q0115
Solicitation 1240LT26Q0115 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Selkirks to Surf road maintenance project. Located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest in Okanogan County, Washington, the project focuses on deferred transportation maintenance along FSR 5400 Harts Pass Road and FSR 5400600 Slate Peak Road. This is a total small business set-aside under NAICS code 237310. The scope of work includes a base package for roadway clearing, ditch and culvert reconditioning, aggregate surface placement, and riprap armor installation, as well as five optional items for additional aggregate placement and landslide or flood damage repairs. The contract is a firm fixed price award with a period of performance from September 14, 2026, to October 13, 2027. Award will be based on the lowest price technically acceptable criteria, requiring a technical approach, construction schedule, and a record of three similar projects completed within the last three years. Compliance with the Davis-Bacon Act and specific Forest Service fire and camping regulations is required. Proposals must be submitted as four separate PDF documents to the designated contract specialist by September 14, 2026, at 1:00 PM Pacific Time. Payment will be based on actual work performed, with progress payments available monthly.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Federal
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Solicitation # 1240LT26Q0094
Solicitation 1240LT26Q0094 is a total Small Business set-aside for the Palisades Lagoon Liner and Effluent Sprinkler System Replacement project at the Coronado National Forest in Pima County, Arizona. The project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, specifically requiring the replacement of the existing lagoon liner with a double geomembrane system, the installation of a new effluent sprinkler system, and the reconstruction of approximately 660 linear feet of access road. To ensure uninterrupted wastewater services during construction, the contractor must provide a temporary above-ground wastewater conveyance system and manage the disposal of existing liners and effluent sludge. The estimated contract value ranges between 500,000 and 1,000,000 dollars, with a performance period from October 1, 2026, to December 1, 2026. The acquisition is governed by FAR Part 12 and NAICS code 237110. Award will be based on best value, evaluating technical approach, project management, performance schedules, specialized experience, and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. Contractors must comply with the Davis-Bacon Act for wage determinations and provide a written quality control plan for approval by the Contracting Officer's Representative before work begins. Final acceptance is contingent upon the system being tested under operating conditions. All invoicing must be processed electronically via the Department of Treasury's Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS