Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Vermont was posted on June 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shared-Use Path Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 20 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety is soliciting bids for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. This turnkey project involves milling all existing asphalt surfaces to a minimum depth of 2.5 inches, repairing soft areas and potholes with base compaction to 98 percent, and installing new asphalt to a minimum finished depth of 2.5 inches. The scope also includes the removal, painting, and resetting of wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes. Electronic responses are due by November 13, 2026, at 5:00 P.M. CT via email or the DPS Online Bid Room. Bids will be evaluated based on responsiveness and past performance, with the award going to the responsible bidder representing the best value. Required submission volumes include contract forms, an information bid section with key personnel resumes, a subcontracting plan for contracts over 100,000 dollars, and a mandatory pricing schedule. Performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars, respectively. The contractor must provide a work phasing plan to ensure safe building access, including off-hours work, and adhere to prevailing wage rates per Texas Government Code Chapter 2258.
Department of Public Safety

POSTED

about 22 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the construction of a paved shared-use path designed for both pedestrians and cyclists. The scope includes preparing the base, applying the surface treatment, and adding necessary striping to ensure safe and organized use. This project aims to enhance community infrastructure by providing a dedicated, multi-use pathway that supports non-motorized transportation options and recreational activities. Issued by the Vermont Department of Economic Development, the subcontract opportunity is categorized under NAICS code 237310, which pertains to highway, street, and bridge construction. The solicitation was posted on June 8, 2026, with a response deadline set for June 29, 2026. Specific location details and point of contact information are not provided, but interested parties can access more details through the Vermont Business Registry website. This project emphasizes improving accessibility and safety for pedestrians and cyclists in the area.

General Info

Construct paved shared-use path for pedestrians and cyclists, including base, surface, and striping.

Documents

This scope was carved out of STP BP13(11).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Exchange Street Sidewalk STP BP13(11)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of a paved multi-use path for pedestrians and cyclists, including base prep, surface treatment, and striping.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 562112
New
SLED
Household Hazardous Products Extended Producer Responsibility with Solid Waste Management Entities (SWMEs)
Solicitation # 77289
The State of Vermont, through the Agency of Natural Resources Department of Environmental Conservation, is seeking applications from 28 Solid Waste Management Entities (SWMEs) with approved Solid Waste Implementation Plans for a reimbursement grant. This program is established under the Vermont Household Hazardous Products (HHP) Extended Producer Responsibility law to help cover the costs of end-of-life management for toxic solid waste. Eligible SWMEs can be reimbursed for up to 41 percent of HHP collection costs, with a total funding pool of up to 1.5 million dollars available. To qualify, grantees must provide free and accessible collection opportunities for covered household hazardous products, including orphan products. All eligible costs must be incurred between January 1, 2027, and December 31, 2027, with the overall period of performance ending on January 31, 2028. The agreement may be renewed for an additional four years upon written agreement. Payment requests must be submitted monthly via ANR Online and must be received within 30 days of the agreement's end date to be honored. Applicants are required to provide a 10-digit Vermont Supplier Number, a signed Certificate of Good Standing, and confirmation of a recent Annual Risk Questionnaire submission. The state will monitor performance and ensure compliance with the VT HHP EPR Collection Plan and state IT accessibility standards.
Hazardous Waste Collection

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 541618
New
SLED
Regional and Municipal Housing Needs Assessment and Planning
Solicitation # 77286
The Chittenden County Regional Planning Commission, in partnership with the City of South Burlington, is seeking qualified consultants to provide regional and municipal housing needs assessment and planning services. The project involves assessing current and future housing needs across Chittenden County, developing regional and municipal housing profiles, and identifying gaps in housing affordability, availability, and types. Key deliverables include materials to communicate regional housing forecasts and targets, as well as a specific housing action plan for South Burlington designed to serve as a model for other municipalities. The selection process follows a two-step approach, beginning with a qualifications review and followed by a cost review. Evaluation is based on a weighted scoring system: 40 points for a proven record of similar projects, 30 points for personnel qualifications, 20 points for the firm's understanding of the work, and 10 points for responsiveness to the RFQ. Applicants must submit a Statement of Qualifications including a cover letter, detailed experience in forecasting and housing assessments, key staff resumes, and at least three references. A cost proposal featuring an hourly rate schedule and overhead fee is also required. Submissions are due by December 1, 2026, at 4:00 p.m. EST to Anne Nelson Stoner. While consultants do not need a Vermont business license to apply, they must obtain one prior to the contract award. The project emphasizes the need for expertise in housing action plans and a commitment to engaging all populations.
Other Management Consulting Services

POSTED

3 days ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS