Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Sitework and Drainage Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Sitework and Drainage Installation involves the execution of drainage systems, catch basins, and underground piping to manage surface water effectively within the City of Louisville, Kentucky. The work is classified as a subcontract under NAICS code 237110, which corresponds to water and wastewater line and related structures construction, indicating the technical nature of the plumbing and civil infrastructure requirements. The solicitation was posted on July 14, 2026, with a response deadline set for August 12, 2026, allowing interested parties a four-week window to prepare and submit their proposals. Performance of the work is expected to occur within the jurisdiction of the City of Louisville, though specific location details are not provided. The contract is managed by the City of Louisville’s organizational unit under the state of Kentucky, and all submissions must be made through the official portal linked in the posting. There is no set-aside designation indicated, meaning the opportunity is open to all eligible contractors regardless of business size or certification status.

General Info

Drainage and underground piping work in Louisville, Kentucky, open to all contractors, proposals due August 12, 2026.

Agency

Kentucky → City Of LouisvilleView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

KY, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → City Of Louisville
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → City Of Louisville
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of drainage systems, catch basins, and underground piping for surface water management.

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle through its Aviation Project Management Group is initiating a project to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured in place pipe (CIPP) technology, following a Design-Bid-Build delivery method. This effort is aimed at long-term infrastructure preservation by rehabilitating the aging pipeline without full excavation, leveraging CIPP to create a seamless, durable liner within the existing pipe structure. The work is classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction and is intended to enhance the reliability and service life of critical water infrastructure serving airport operations. Moraa Omwega serves as the primary point of contact, with Ray Moreno designated as the Project Manager, both reachable through the Port of Seattle’s official channels. The solicitation was posted on July 15, 2026, and while no solicitation number or set aside details are provided, interested parties are directed to the official portal for further documentation and procurement details. The place of performance is aligned with the Airport Expressway corridor, though exact city and state identifiers are not specified in the data, emphasizing the localized nature of the repair within the Port's operational jurisdiction. No bid deadlines or award timelines are indicated, but the forecast nature of the posting signals a preparatory phase for upcoming competitive bidding.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Van Dyke Flow Diversion (Pump Station and Pipeline)Hillsborough County is soliciting competitive sealed proposals from qualified Professional Engineering firms for the Van Dyke Flow Diversion (Pump Station and Pipeline) project, a major infrastructure initiative to decommission the Van Dyke Wastewater Treatment Facility and replace it with a master pump station that will convey wastewater to the Northwest Regional Water Reclamation Facility. This project will be delivered under the Construction Manager at Risk (CMAR) method and is estimated at $2,000,000 over a five-year term, with the contract awarded based on technical merit. The scope requires the preparation of a preliminary design including technical memoranda, alternative analyses of wastewater collection and transmission systems, final cost estimates, preliminary opinions of probable construction cost, and a Master Implementation Plan. Additional work may include final design, construction engineering and inspection, and design of potable and reclaimed water distribution mains upon approval. Key deliverables must align with regulatory standards from FDOT, FDEP, and the Hillsborough County Environmental Protection Commission, and include detailed evaluations of right-of-way, utilities, traffic impacts, and constructability. The project involves constructing a transfer force main, a reclaimed water booster pump station, and electrical improvements at the former wastewater facility site. Proposals must be submitted exclusively through the Euna Procurement electronic bidding system by August 21, 2026, and are evaluated based on firm experience (40 points), ability of personnel (35 points), capacity to meet schedule and budget (20 points), and current and projected workload (5 points). Bonus points are available for Small Business Enterprise participation up to five percent, along with additional points based on past performance and volume of work delivered in prior fiscal years. Offerors must comply with stringent legal and administrative requirements including a sworn affidavit certifying exclusion from any Foreign Country of Concern as defined by Florida Statute 287.138, mandatory use of E-Verify for workforce verification, adherence to a drug-free workplace policy requiring notification of controlled substance convictions within five days, and provision of full insurance coverage including directors and officers liability with a $1,000,000 combined single limit, liquor liability, motor truck cargo, and physical abuse and molestation coverage. All firms must complete a firm data sheet, submit resumes for key personnel, and provide evidence of experience with similar-sized projects. Final contract award will be made to the highest-ranked firm, with payments processed via ACH direct deposit upon completion of the Hillsborough County Substitute W-9 and Direct
Hillsborough County

POSTED

1 day ago

DEADLINE

in about 1 month
View Details