SMUD Gas Pipeline Anomaly Inspection and Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento Municipal Utility District (SMUD) is undertaking the Gas Pipeline Anomaly Inspection and Repair Project to inspect and maintain its Line 700A natural gas pipeline across three locations within the Yolo Bypass Wildlife Area in Yolo County, California. The work involves excavating to expose the pipeline using mechanical, hydro-vac, and soft-dig methods, conducting inspections for anomalies, making necessary repairs, and safely removing a segment of idle pipeline that has been inactive since 2000. Two sites will feature 8-by-10-foot excavations for inspection and repair activities, while the third site requires four 12-by-16-foot excavations and one narrow 15-by-2-foot excavation to exhume, cap, and remove the dormant infrastructure. Wetland protective matting will be installed to minimize environmental disturbance, and all work will comply with applicable pipeline safety codes and industry standards, including air monitoring and shoring procedures. Equipment such as backhoes, hydro-vac trucks, haul trucks, and water trucks will be deployed, with all activities conducted during daytime hours. Each location is expected to take approximately 14 days to complete, with the entire project targeted for finish by August 2026. Upon completion, excavations will be backfilled with native soils and revegetated to restore the site to its original condition. Access to the work areas will be via existing roads within the pipeline right-of-way, avoiding new infrastructure. SMUD, as the Lead Agency and public utility, is responsible for overseeing and executing the project under categorical exemptions provided by the California Environmental Quality Act (CEQA), specifically Classes 1, 6, and 9, which classify this as a routine maintenance operation with no significant environmental impact. No federal acquisition regulations (FAR) clauses are applicable, and no formal contract type, pricing data, or competitive solicitation process is documented, suggesting an internally managed, non-competitive action. The primary point of contact is Ammon Rice, Supervisor of Environmental Services, who can be reached via email or phone for further inquiries. No formal contract clauses, evaluation factors, or source selection criteria are outlined in the supporting documentation, reinforcing the project’s nature as a direct operational undertaking rather than a competitive procurement. Environmental compliance is ensured through prior agency determinations, including a No Effect Determination from the California Department of Fish and Wildlife, and a Notice of Exemption was filed to formally document the CEQA exemption. There are no specified invoicing systems, payment offices,

General Info

SMUD inspects and repairs Line 700A pipeline in Yolo Bypass, removes idle segment, restores site, complies with CEQA exemptions.

Agency

California → Sacramento Municipal Utility District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

SMUD Gas Pipeline Anomaly Inspection and Repair Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A
Contacts
Ammon RiceSupervisor, Environmental Services

Full Description

Show more
Sacramento Municipal Utility District (SMUD) is proposing to perform gas pipeline inspections at three separate locations within the Line 700A Gas Pipeline right-of-way (ROW). All three of the proposed excavation sites fall within the section of ROW encompassed by the Yolo Bypass Wildlife Area. The work proposed includes excavations to expose the pipeline, inspect for anomalies, and make necessary repairs. Two of the work areas would include 8-by10-foot excavation sites, soil stockpiles, equipment parking, and staging. Additionally, one location will include work to safely remove a section of idle pipeline which has been inactive since 2000. This site will require four, 12-by-16-foot excavations and one, narrow, 15-by-2-foot excavation to exhume, cap off, and remove the idle facilities. Wetland protective matting would be utilized within the work areas to minimize ground disturbance. SMUD would access the pipeline ROW using existing roads. The excavations will be performed using a combination of mechanical excavation, hydro-excavation, and soft-dig methods, and will include shoring, air monitoring, and compliance with all applicable codes and industry standards. Equipment anticipated for this work includes pickup trucks, backhoe or excavator, equipment trailers, hydro-vac truck, haul truck, and water truck. Upon completion of the necessary maintenance work, the excavations would be backfilled with sand and native soils and revegetated at the surface. Activities would be performed during daytime hours. Work is expected to take approximately 14 days at each location. Construction is expected to be completed by August 2026 or soon thereafter.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,