Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on October 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Snow Plowing, Snow Removal, Ice Control for Harrington Warehouse, PE

Closed
30006947International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 7 hours ago

DEADLINE

in about 11 hours
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The project concludes with a final site inspection to ensure all properties are left in a clean, orderly, and safe condition. Proposals are due by November 5, 2026, and must be submitted to the CCT IT Department. The contract term is for an as-needed period not to exceed three years, with payments contingent upon the availability of funds in the tribal treasury. Evaluation is based on a 100-point scale considering reliability, budget, and TERO designations, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. Awardees must provide proof of insurance and sign a certification regarding debarment and suspension. Furthermore, any contract exceeding 100,000 dollars requires a performance bond, otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
SLED
Landscaping Services
Solicitation # 260572
The Orange County Transportation Authority is soliciting bids for a one-year landscaping services contract with a budget of $354,050. The awarded contractor will provide comprehensive maintenance for various transit center facilities and maintenance and operations bases, including locations in Santa Ana, Garden Grove, Anaheim, Irvine, Newport Beach, Huntington Beach, Fullerton, Laguna Hills, and Brea, as well as specific OC Streetcar project areas. The scope of work encompasses weekly turf mowing and edging, shrub and ground cover care, slope maintenance, irrigation system management, and general debris removal. This is a prevailing wage contract requiring strict adherence to the California Labor Code and federal Davis-Bacon Act regulations. To be eligible, contractors must possess a California class C-27 State Contractors license, an MGB License, a Qualified Applicator License (QAL) with Category B attachment, and employ an ISA Certified Arborist. Bids will be awarded to the lowest responsive and responsible bidder based on a weighted calculation of 90% for the lump sum total price and 10% for the percent cost mark-up on parts. Submissions must be made electronically via the OpenGov Procurement portal by November 2, 2026, at 11:00 a.m. The contract includes rigorous safety and environmental specifications, mandatory insurance coverage, and compliance with Disadvantaged Business Enterprise (DBE) program requirements.
F&A-Contracts Administration and Materials Management

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Department of Fisheries and Oceans requires snow plowing, removal, and ice control services for the Harrington Warehouse in Prince Edward Island. The contractor must begin clearing activities once snow accumulates to 8cm or upon request from the Departmental Representative. Parking lots must be cleared daily by 0700hrs, and all roadways must be maintained to ensure snow accumulation does not exceed 8cm during storms. The contractor is responsible for providing all ice control materials, such as salt and sand, to keep walkways and parking areas safe and ice-free at all times. Specific operational requirements include keeping fire hydrants accessible, angling blades away from structures, and avoiding piling snow against landscaping or buildings. Upon request, snow must be trucked to a municipality-approved location within three calendar days of a storm's end. At the conclusion of the season, the contractor must remove all markers and debris, repair any damage to landscaping, and ensure all paved areas and neighboring properties are cleaned and returned to their pre-winter condition by April 30th.

General Info

Snow plowing and ice control services for Harrington Warehouse in Prince Edward Island.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Terri JonesPoint of Contact

Full Description

Show more
The contractor must start snow clearing activities when 8cm (Eight) of snow has accumulated or when deemed necessary by the Departmental Representative. The contractor must remove snow and use contractor provided materials for ice control by the application of salt, a mixture of sand and salt, or ice melt to prevent slippery conditions on all locations indicated on Appendix A – Site information. All pathways and areas around fire hydrants must be kept clear and accessible. Parking lot(s) must be cleared of snow by 0700hrs daily, and must be kept clear of snow, as identified under the scope of work, in a timely manner to facilitate both shift and day workers as applicable. General working hours for the Souris Search and Rescue Station are 0800hrs to 1600hrs daily. For all roads and roadways, the area to be blown/plowed is from the edge of the pavement to the edge of pavement or from the curb to curb, with the shoulder to be winged back, paying particular attention to intersections for visibility purposes. These will be blown or plowed after 8 (eight) cm accumulations and repeated during the storm so as to hold snow accumulation to 8 (eight) cm or less, with final complete removal and clearing at the end of the storm. Plow and equipment blades shall be adjusted, including down pressure if required to leave a minimum amount of snow on the roadway and other areas. The said blades shall also be angled away from vehicles, fire hydrants, fences, concrete abutments, and the perimeter wall. The Contractor shall not push or pile snow around or against any shrubs or landscaping on the property, nor against the walls of the buildings and/or fences, without the permission of the Departmental Representative. If requested, removal of snow from the site shall be on completion of each plowing operation to ensure that there is no obstruction to vehicle traffic, parking spaces, personnel, or equipment movement. When requested, all snow shall be trucked away and moved to an approved location. The contractor must obtain approval from the local municipality as to the location for the excess snow. At the request of the Department Representative, it is anticipated that the snowbank is to be cleared within 3 calendar days after each snow event has ended. All parking and walkway areas are to be kept ice free at all times for the duration of this contract. Where immediate application of de-icing material is not practical due to continued snowfall, all areas are to be maintained in a reasonably safe condition until snow-clearing operations allow for the application of sufficient de-icing material to make vehicular and foot traffic safe and free of ice. At the end of the snow season the contractor shall remove all snow markers, debris, sand, as well as repair any damage to landscaping and structures. Sand, stone or de-icing material remaining on paved or concrete areas will be mechanically or hand swept and completely removed from site. All adjacent areas (including neighboring properties) affected by snow removal and de-icing operations shall be cleaned and returned to pre-winter condition, this includes the removal of all sand, gravel, sod and debris left behind by snow plowing, shoveling or mechanical blowing on non DFO Property. These cleaning operations shall be completed by April 30th of each contract year.

More opportunities from Government of Canada → Department of Fisheries and Oceans

Same awarding agency

NAICS: 332312
New
International
Gulf NB 12 Metre Module Floating Docks Cap de St-Louis, NB
Solicitation # 30008535
Fisheries and Oceans Canada has issued solicitation 30008535 for the fabrication, transportation, and land delivery of twenty-three 12-meter floating wharf modules to be located in New Brunswick. The project requires the delivery of thirteen modules (twelve Type A and one Type B) to Cap-de-St-Louis and ten modules (eight Type A and two Type B) to Le Goulet. The scope encompasses all necessary labor, materials, equipment, and supervision, though on-site installation is explicitly excluded. All work must be completed by March 31, 2027, and must adhere to the National Building Code of Canada and specific technical standards, including ASTM and CSA requirements for hot-dip galvanized steel, HDPE piping, and treated dimensional lumber. The contract is restricted to Canadian contractors and is subject to the Federal Prompt Payment for Construction Work Act, requiring payment within 28 calendar days of a proper invoice. Successful bidders must provide contract security within 14 days of acceptance, choosing between performance and payment bonds or a security deposit/letter of credit. Quality control is stringent, requiring professional engineer-sealed shop drawings and specific marking for manufacture dates and lift points. Contractor performance will be formally evaluated based on workmanship, timeliness, project management, and health and safety, with unsatisfactory ratings potentially impacting future bidding privileges.
Fabricated Structural Metal Manufacturing

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS