Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Solicitation is Restricted to the NC MATOC Road Maintenance and Construction Holders.

Active
12363N26Q4190Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation is restricted exclusively to holders of the NC MATOC Road Maintenance and Construction contract, limiting eligibility to those already authorized under that program. It is designated as a Total Small Business Set-Aside under FAR 19.5, ensuring that only small businesses can compete for this opportunity. The contract falls under NAICS code 237310, which pertains to Highway, Street, and Bridge Construction, and is issued by the Stewardship Contracting Branch of the USDA Forest Service under the Department of Agriculture. The solicitation number is 12363N26Q4190, posted on July 2, 2026, with a response deadline of July 29, 2026, at 4:00 PM. Performance is required in Pisgah Forest, North Carolina, with the primary point of contact being Jim Kaminski, reachable via email or phone, and Chad A.T. Bullock as the secondary contact. The contract is managed from the agency’s office in Washington, D.C., and further details can be accessed through the provided SAM.gov link.

General Info

NC MATOC holders only; small business set-aside for highway work in Pisgah Forest, NC.

Agency

Department Of Agriculture → Stewardship Contracting Branch Usda-FsView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Pisgah Forest, NC, 28768, USA

Set-Aside

SBA

Documents

(1)

Solicitation 12363N26Q4190 - Bent Creek, Wash Creek and Hendersonville Reservoir Repairs

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
Contacts2 people available
OfficeWashington, DC, 202501138, USA
Organization / Agency
Department Of Agriculture → Stewardship Contracting Branch Usda-Fs
View Agency Profile
Office AddressWashington, DC, 202501138, USA

Full Description

Show more

Solicitation is Restricted to the NC MATOC Road Maintenance and Construction Holders.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details