Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Solids Handling Improvement Project (SHIP)

Forecast
2025100842State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Sanitary District is implementing the Solids Handling Improvement Project (SHIP) at its Water Resource Recovery Facility located at One William Moffett Place in Goleta, California. The project aims to upgrade existing solids and gas handling processes to mitigate regulatory uncertainties, diversify beneficial use outlets, and move toward energy neutrality. The primary objective is the design and construction of a new thermal dryer facility to transform dewatered sludge into Class A biosolids, which will reduce the volume of hauled sludge and increase the potential for beneficial reuse. Key project components include the thermal dryer, a natural gas-powered thermal heater system with future biogas conversion capabilities, loadout facilities for truck removal, a fire suppression pump, and all associated civil, structural, electrical, and instrumentation work. The project is governed by the 2022 California Building Code and adheres to specific engineering standards, including ACI 350 for concrete, AISC for steel, and TMS 402/602 for masonry. Environmental compliance has been managed through the California Environmental Quality Act (CEQA) process, resulting in a Mitigated Negative Declaration approved on December 1, 2025. Required permits include an Authority to Construct from the Santa Barbara County Air Pollution Control District and Coastal Development Permits from the County Planning Department. The facility will be situated within the existing Biosolids Handling Area, utilizing the site of two former sludge drying beds.

General Info

Goleta Sanitary District will build a thermal dryer facility for Class A biosolids.

Place of Performance

William Moffett Place, James Fowler Rd, Sandspit Rd, Goleta, CA, 93117

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Sanitary District
Contacts1 person available
OfficeN/A

Full Description

Show more
Goleta Sanitary District (GSD) owns and operates the Goleta Water Resource Recovery Facility (WRRF) located at One William Moffett Place, near the Santa Barbara Municipal Airport (SBA), in an unincorporated coastal area of Santa Barbara County, California. GSD is a special services district that provides wastewater collection, treatment, and disposal services to residents and businesses within the Goleta Valley. The GSD WRRF has an annual average design flow capacity to treat 7.64 million gallons per day (MGD) of wastewater, but it is currently treating an annual average flow of approximately 4.9 MGD. The treatment process at WRRF begins with bar screens to remove large debris, as well as aerated grit tanks and two cyclone separators to remove grit and sand. The wastewater then flows into three primary clarifiers for solids removal prior to secondary treatment. The secondary treatment at WRRF includes biofilters, three aeration basins, and four secondary clarifiers. Currently, GSD's WRRF has the following solids and gas handling process for treatment of solids recovered from wastewater. Primary Sludge (PS) coming from primary clarifiers is pumped to the digestion process. Waste activated sludge (WAS) generated from secondary treatment is thickened to 6% solids using two screw thickeners; the resulting thickened WAS (TWAS) is pumped to the digestion process. Combined PS and TWAS solids are stabilized in three mesophilic anaerobic digesters (MADs ), operated in parallel. Digested biosolids are dewatered by two screw presses and then loaded onto trucks for transport off-site. A small portion of the dewatered biosolids is diverted into sludge drying beds for further stabilization to become a Class A product. Biogas produced in the digesters is burned in boilers to provide hot water for heating the digesters and to supply other heating needs at the WRRF. Biogas that is not required for heating is flared through the waste gas burner. A condition assessment conducted in 2016 indicated that some of the unit processes at WRRF are nearing the end of their service life and would need rehabilitation and replacement soon. A Biosolids and Energy Strategic Plan (BESP) was developed in August 2019 by Hazen and Sawyer (Hazen), which evaluated biosolids unit processes in detail and recommended upgrading existing facilities to mitigate regulatory uncertainties affecting biosolids disposition, to diversify beneficial use outlets, and to approach energy neutrality for the facility. The BESP summarized the capacity evaluation for the existing solids processes, including digesters considering the current and anticipated future flows and loads, and identified the need to build a new digester to maintain firm capacity. Firm capacity was defined as the ability to maintain full treatment capacity with the largest single process unit out of service. The BESP also included assessment of the High Strength Waste (HSW) co-digestion and the feasibility and benefits of reaching energy neutrality. BESP provided GSD with a suite of improvement options for the WRRF, each with its own independent utility and purpose. Goleta Sanitary District is proposing to implement a Solids Handling Improvement Project (SHIP) at its Water Resource Recovery Facility (Project), which includes the construction of a thermal dryer facility. The addition of the thermal dryer facility will decrease the amount of hauled sludge, as well as increase the quality of biosolids produced, thus increasing the potential for beneficial reuse of the product. The proposed Project includes the following components: (1) a thermal dryer, which will heat dewatered sludge to transform it into Class A biosolids; (2) a thermal heater system, which will use natural gas to provide heat to operate the thermal dryer, with the option to convert using biogas produced by the digesters in the future, when gas production increases; (3) loadout facilities, intended to load Class A biosolids into trucks for removal from the site; (4) associated civil, structural, electrical and instrumentation work; and (5) a fire pump for fire suppression system at the new buildings.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
CP25008
Solicitation # CP25008
The Bulk Terminal No. 1 Junction House Rehabilitation project, identified as CP25008, is a heavy construction contract issued by the Lake Charles Harbor and Terminal District in Louisiana. The scope of work involves the installation of various new conveyor components, including discharge hoods, deflectors, spouts, transitions, loaders, skirtboards, belt cleaners, and supports. The project requires strict adherence to industry standards such as API, ASTM, IEEE, NEMA, NFPA 70, OSHA, and UL. Performance is managed through a Critical Path Progress Schedule with Level 3 detail and bi-weekly updates, with specific equipment lead times estimated between 6 and 10 weeks. The contract will be awarded to the lowest qualified bidder based on the summation of quantities and unit bid prices. Bidders must provide a non-collusion declaration, a corporate resolution of authority, and, for bids exceeding 100,000 dollars, a Byrd Anti-Lobbying Amendment Certification. The successful contractor must provide performance and payment bonds from an approved surety or a Louisiana-domiciled insurance company with at least an A- rating. Technical requirements include specific piping color coding, chloride-free adhesives for stainless steel and nickel alloys, and electrical system identification complying with ANSI and NFPA standards. Final acceptance is contingent upon the owner verifying that the system is functional and operational.
Port of Lake Charles

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) solicitation (FA8137-26-R-0040) for general construction services. The contract has a total aggregate maximum value of 950 million dollars over a ten-year period, consisting of a five-year base period and one five-year option. The scope of work encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects for real property facilities at Tinker AFB, Oklahoma. Project execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The government is utilizing a Highest Technically Rated Offeror (HTRO) source selection process based on a Minimum Technical Threshold Rating (MTTR). Offerors are evaluated across four key sections: relevant construction experience, design experience, certifications/licenses, and staffing. To be eligible for award, offerors must meet specific point thresholds, with 8,190 points required for the Small Business pool and 7,140 points for the Full and Open pool. The solicitation is a partial small business set-aside under NAICS 236210. Key administrative requirements include mandatory registration in the System for Award Management (SAM.gov) and compliance with CMMC Level 1 cybersecurity standards. Performance and payment bonds are required at 100 percent of the original contract price. Proposals must be submitted electronically to the designated MACC Workflow Org Box by November 30, 2026. While the solicitation is active, funds are anticipated to become available in FY27, at which point task orders will be issued.
FA8137 Afsc Pzioc

POSTED

4 days ago

DEADLINE

in 13 days
View Details
NAICS: 236210
New
SLED
IFB 06-26 Biochar Facility Construction
Solicitation # IFB 06-26
The Southeastern Public Service Authority of Virginia (SPSA) is soliciting bids for the construction of a 40,872 square foot biochar processing plant located in Portsmouth, Virginia. The facility is designed to manage the organic portion of the SPSA SORT System. The successful contractor will be responsible for providing all labor, materials, and warranties to deliver a fully operational facility, which includes coordinating construction activities with SPSA and AMP regarding the installation and commissioning of specialized equipment. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on technical compliance, the ability to meet quality standards, and the provision of descriptive literature and references for similar completed projects. Key requirements include the submission of performance and labor and material payment bonds totaling 50 percent of the contract amount and adherence to strict safety and accessibility standards, including the Americans With Disabilities Act. Bidders must provide one original and four copies of their bid, along with an electronic copy on a flash drive, by the deadline of November 20, 2026. The contractor is required to provide as-built drawings upon completion and must comply with various federal and state regulations, including drug-free workplace and non-discrimination provisions. All work must be performed in accordance with the CED Project Manual and associated drawings, with specific quality assurance testing for concrete and asphalt as outlined in the inspection criteria.
Southeastern Public Service Authority

POSTED

5 days ago

DEADLINE

in 3 days
View Details
NAICS: 236210
New
SLED
HOR-2026-001-CMR-RFQ
Solicitation # 49965
Horizon/McClellan LLC is seeking a highly qualified Construction Manager at Risk (CMR) for the redevelopment of a 3.33-acre site at 160 William F. McClellan Highway in East Boston. The project involves the construction of an approximately 150,000 square foot, 2-story warehouse with an estimated value of $75,000,000. This facility will serve as a consolidated receiving and distribution center for Marketplace CRDC, LLC, and will include specialized features such as truck docks, refrigeration, freezers, and vehicle chargers for heavy-duty trucks and automobiles. The project must be executed in accordance with M.G.L. Chapter 149A, Massport’s Construction Management At-Risk Procedures dated January 2026, and a Project Labor Agreement. The selection process is a two-phase procurement. Phase I focuses on qualifications, where firms are evaluated on their proposed team, collaborative experience, budget discipline, and expertise in Virtual Design and Construction (VDC) and LEAN construction. Mandatory requirements include DCAMM certification, a surety letter confirming bonding capacity for 110% of the construction estimate, and a signed legal attestation. Shortlisted firms will proceed to Phase II to submit technical and pricing proposals. The project timeline targets a preconstruction services contract in January 2027, the start of construction in Spring 2027, and substantial completion in 2028. Submissions are due by November 25, 2026, via Bid Express.
Horizon/McClellan LLC

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS