Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Commerce was posted on January 6, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought Design Build Services

Closed
NB194000-14-B1R-P4-9Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

325 Broadway, BOULDER, CO, 80335, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA

Full Description

Show more
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY - Solicitations are not available at this time. Requests for a solicitation will not receive a response. This notice does not constitute a commitment by the United States Government. The National Institute of Standards and Technology (NIST) Acquisition Management Division (AMD) in Boulder, CO is conducting market research to develop an acquisition strategy for the potential procurement of Design Build Services for renovation construction work for Building 1 (also known as the Radio Building) at the NIST campus in Boulder, CO. Background. Bldg 1 was constructed in 1954 and is a cast-in-place reinforced concrete building. It serves as the main laboratory facility for research and measurements at NIST Boulder, supporting the NIST mission to provide measurements, standards, and technology that advance economic growth and address national needs. Building 1 comprises a total of approximately 320,000 square feet, and includes administrative and support staff offices as well as laboratories. Building 1 includes a wide range of laboratory facilities that support research and measurements in areas such as electronics, nanotechnology, time and frequency measurements, quantum computing and quantum communications, laser science, optics, superconducting sensors, radio-frequency communications, magnetic field measurements, and many other areas. In many of these areas NIST Boulder performs the world's best research and measurements, including the world's leading quantum computing research programs, the world's most accurate atomic clocks, and some of the world's most sensitive measurements using unique superconducting devices. The extremely demanding and sensitive research and measurements performed in Building 1 require tight control of environmental conditions such as temperature, vibration, humidity, and air quality. Renovation of Building 1 is a necessity for NIST's continued long-term support of US industrial competitiveness in the world market. The Building 1 Renovation (B1R) will provide extensive renovation of approximately three- fourths of Building 1, including the Central Utility Room, Wings 3, 4, 5, 6 and the portion of the Center Spine connecting Wings 3&4 to Wings 5&6. This will provide approximately 80,000 net assignable square feet of high performance laboratory space to perform research and measurements needed by industry and the scientific community. The renovation will support key technology areas such as nanotechnology, biotechnology, new energy sources, computing and telecommunications in a high performance facility. Renovated spaces shall be sufficient to support NIST's vision well into the 21st Century and will be supportive of infrastructure recently developed on site. A LEED-CI (Commercial Interiors) Silver certification from the United States Green Building Council is a minimum requirement for the completed project. Renovation designs shall integrate the design goals and standards of LABS 21 Best Practice Guide. Current renovation efforts have been acquired under the traditional design-bid-build approach. Phase 1 of the renovation included exterior renovation of Wings 6 & 3 and is scheduled to be completed in 1st Quarter 2014. Phase 2 & 3 of the renovation includes interior renovation of Wings 6 & 3 and is scheduled to begin 1st Quarter 2014. A design build approach is under consideration for the remaining 6 phases of construction renovation. The magnitude of construction for the remaining phases is more than $10,000,000 per phase. Response to this sources sought notice shall be limited to 10 pages and shall include the following information: 1. Firm's capability and experience as a prime contractor or leading a design build team for renovation or new construction projects for scientific research and laboratory type facilities similar in size and scope. Include a brief description and location of the project, value of the project, a list of key personnel and subcontractors involved, and facility owner point of contact information. 2. Firm's Business Size - LB, SB, 8(a), HUBZone, SDVOSB, or WOSB. Also submit information on existing Joint Ventures, mentor-prot'g's and teaming arrangements. To be considered relevant, the Joint Venture, mentor-prot'g's and/or teaming arrangement must demonstrate previous successful completion of design build projects similar in size and scope. 3. Firm's Bonding Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from bonding company. All information submitted in response to this announcement is voluntary; the United States Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the United States Government. The response date for this market research is February 6, 2014. All responses to this RFI must be submitted via e-mail to Rob Brackett, Contract Specialist at Robert.brackett@nist.gov.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS