Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on November 20, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Modification of T Line in Building 340

Closed
PANRSA-23-P-0000014937Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation (MTC) is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off (PTO) system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The project is complete once the Facility Maintenance Department verifies proper clutch engagement and PTO operation under load. This is a small business set-aside opportunity under NAICS code 811310, open to various SBA-certified categories including VOSB, SDVOSB, WOSB, and HUBZone businesses. Proposals must be submitted via email to Angie Mahoney by November 3, 2026, and must include a lump sum bid sheet, a completed supplier packet with a W-9 and self-certification form, and proof of insurance. Award will be based on best value, considering the contractor's qualifications, experience, and the itemized cost breakdown. The contract is subject to Federal Acquisition Regulation (FAR) clauses regarding the Buy American Act, combating trafficking in persons, and Service Contract Labor Standards per Wage Determination No. 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
**Certified SB/DVBE Only** IFPQ Boiler Inspection, Maintenance, Repair, Testing, and Reporting in Los Angeles County
Solicitation # 07A6539
The California Department of Transportation (Caltrans) is soliciting price quotes for an Invitation for Price Quote (IFPQ 07A6539) to provide comprehensive boiler inspection, maintenance, repair, testing, and reporting services at the District 7 Office facility in Los Angeles, California. The scope of work includes annual and quarterly preventative maintenance for three Unilux water tube boilers and six boiler pumps, ensuring compliance with manufacturer standards, ASME Code, OSHA requirements, and South Coast Air Quality Management District standards. This is a set-aside solicitation exclusively for certified Small Business (SB), Microbusiness (MB), or Disabled Veteran Business Enterprise (DVBE) entities. The contract will be awarded to the responsible bidder offering the lowest price quote who meets all specifications. Key operational requirements include a 48-hour response time for routine service requests and a strict prohibition on subcontracting any portion of the work. The contractor must adhere to State General Prevailing Wage Rates for Los Angeles County and provide a payment bond for any service request exceeding 25,000 dollars. Required submission documents include a Price Quote Proposal, Bidder Certification Sheet, Non-Collusion Declaration, and certifications for California Civil Rights Laws and the Darfur Contracting Act. Invoicing is conducted monthly in arrears and must be accompanied by certified payroll records and DVBE utilization reports. The agreement is subject to a budget contingency clause, meaning it is enforceable only if sufficient funds are provided by the California State Legislature or the United States Government.
California Department of Transportation

POSTED

about 7 hours ago

DEADLINE

in 15 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 12 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Corpus Christi, TX, 78413, USA

Set-Aside

SBA

Documents

1

PWS for Modification of T Line at CCAD

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Ccad Contr Office
Contacts2 people available
OfficeCORPUS CHRISTI, TX, 78419-5260, USA
Office AddressCORPUS CHRISTI, TX, 78419-5260, USA
Contacts
Dawyn M. Martinez

Full Description

Show more
THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR QUOTE (RFQ) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS IS STRICTLY VOLUNTARY. Your response to this Sources Sought shall be electronically submitted to the Contract Specialist, Harold "Jay" Russell, Jr., in either Microsoft Word or Portable Document Format (PDF), via email to contact@example.gov no later than 4:30 p.m. Central Standard Time (CST) on 29 November 2023. Reference this synopsis number in subject line of e-mail and on all enclosed documents. Market research responses received after the time and date specified will be determined to be late and may not be considered. Information and materials submitted in response to this request WILL NOT be returned. If your organization has the potential capacity to meet this requirement, please provide the following information: Organization name, address, cage code, primary points of contact (POCs) and their email address, Web site address, and telephone number. All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government. ______________________________________________________________________________________ 5.0 REQUIREMENTS: 5.1 Basic Services: The Contractor shall modify the T line in conformance to the specification in 5.2. 5.2 Task/Requirement: 5.2.1 The control cabinet for the T line containing a PLC and multiple I/O modules for the T line shall be relocated from directly behind tank T4 to a location directly behind tanks T6 and T7. This will require disconnection of signal and power wiring and reconnection of the wiring after the cabinet is relocated. The Contractor shall document this work with both wiring diagrams and ladder diagrams. 5.2.2 Tank T4 shall be converted from a rinse tank into a process tank containing an aqueous degreaser. This will require the fabrication and installation of a cover plate for the rinse overflow which cascades into the adjacent rinse tank (note: tanks T3 and T4 are countercurrent rinse tanks with incoming water flowing into T4, outgoing water from T4 flowing into T3, and outgoing water from T3 flowing to the rinsewater drain line). Tank T4 is constructed of 304 stainless steel so this cover plate shall also be fabricated from 304 stainless steel and welded into place. 5.2.3 Immersion heaters, heater controller, and branch fusing shall be installed on tank T4. The Government shall supply the heaters, heater controller, and branch fusing for installation. The Contractor shall provide any additional materials such as wiring to the controller and heaters in order to make this installation. All hardware required to properly mount the heaters, controller, and branch fusing shall be supplied by the Contractor. Immersion heater system shall be tied into the existing SCADA system and operating information viewable on the human machine interface (HMI). 5.2.4 Exhaust hood shall be installed on tank T4. The Government shall supply the exhaust hood for installation. The Contractor shall supply all hardware required for proper installation on tank T4. 5.2.5 Ducting between the T4 exhaust hood and the ventilation system shall be procured and installed by the Contractor. The ducting at tank T14 shall be disconnected by the Contractor, the stub at T14 shall be blanked off and the riser for the ducting at T14 which connects to the main ventilation line below the second-floor level shall be made ready for connection with ducting from T4. The ducting from T4 shall be routed from the exhaust hood to the second-floor level and then routed along the top of the grating for the second floor to the riser at T14. All ducting including 90-degree elbows and straight duct shall be 16 inch diameter and constructed from polyvinyl chloride (PVC) and shall be supplied by the Contractor. 5.2.6 The incoming rinse water line to T4 shall be relocated by the Contractor to T3; all materials and hardware necessary for this relocation shall be supplied by the Contractor. 5.2.7 A push air line shall be installed by the Contractor at the front of T4 and shall be of similar design as the push air lines in use by other process tanks in the T line. This line shall be connected by the Contractor to the existing push air system for the T line. All materials and hardware required for this push air line shall be supplied by the Contractor. 5.2.8 A pump constructed of chlorinated polyvinyl chloride (CPVC) shall be installed on T4 by the Contractor. This pump shall be supplied by the Government. 5.2.9 Tank T2 shall be converted from an alkaline cleaning bath to a phosphoric acid bath. This shall require the use of a PVC liner of minimum thickness of 1/8 and of dimensions at 72 long x 42 wide x 168 deep with a 4 flange. The Contractor shall procure and install this liner. 5.2.10 Rectification shall be installed for Tank T2 by the Contractor. The rectifier (asset M3499) shall be provided by the Government but shall be relocated by the Contractor from its current location on the first floor near Tank G5 to the new location on the first floor adjacent to Tank T7 on the former Chiller #3 pad. The Contractor shall make connection between the rectifier and tank bussing on Tank T2. The wiring for the positive polarity shall be coated with red insulation and the wiring for the negative polarity shall be coated with black insulation. The Contractor shall install this wiring using appropriate connection lugs between the wiring and the rectifier and between the wiring and the tank bussing. The 500 KCMIL wire with red and black insulation shall be supplied by the Government. The rectifier controller shall be relocated from Tank G5 to Tank T2 and tied into the T line SCADA system with the operating information viewable on the HMI. 5.2.11 Tank bussing for Tank T2 to hold 316 stainless steel cathodes shall be installed by the Contractor. The bus bars shall be of copper metal of sufficient thickness to support the weight of the cathodes (approximately 100 pounds) and to conduct up to 500 A of DC current and shall be supplied by the Government. The Contractor shall supply the proper number of supports for the cathode bussing to minimize deflection in the bus bars from the weight of the cathodes. The bus bars shall be electrically isolated from the stainless-steel tank and shall be connected to the positive polarity wiring supplied from the rectifier. Two conductive bronze saddles (rated for 500 A) for holding the anode bar shall be procured and installed by the Contractor. The anode bus bar shall be of copper metal and a diameter of 1 with a length of 80 and shall be supplied by the Government. 5.2.12 Two cathodes of 316 stainless steel and a thickness of 14 gauge shall be procured and installed on Tank T2 by the Contractor. These cathodes shall be of dimension 40 width and 110 length and shall be hung on each cathode bus bar using 316 stainless steel straps. 5.2.13 Tank T1 shall be converted from an aqueous degreasing bath to a phosphoric acid bath. This shall require the use of a PVC liner of minimum thickness of 1/8 and of dimensions at 72 long x 42 wide x 168 deep with a 4 flange. The Contractor shall procure and install this liner. 5.2.14 Rectification shall be installed for Tank T1 by the Contractor. The rectifier (asset M0014) shall be provided by the Government but shall be relocated by the Contractor from its current location on the first floor near Tank T14 to the new location on the first floor adjacent to Tank T1 on the east side of the T line. The Contractor shall make connection between the rectifier and tank bussing on Tank T1. The wiring for the positive polarity shall be coated with red insulation and the wiring for the negative polarity shall be coated with black insulation. The Contractor shall install this wiring using appropriate connection lugs between the wiring and the rectifier and between the wiring and the tank bussing. The 500 KCMIL wire with red and black insulation shall be supplied by the Government. The rectifier controller shall be relocated from Tank T14 to Tank T1 and tied into the T line SCADA system with the operating information viewable on the HMI. 5.2.15 Tank bussing for Tank T1 to hold 316 stainless steel cathodes shall be installed by the Contractor. The bus bars shall be of copper metal of sufficient thickness to support the weight of the cathodes (approximately 100 pounds) and to conduct up to 500 A of DC current and shall be supplied by the Government. The Contractor shall supply the proper number of supports for the cathode bussing to minimize deflection in the bus bars from the weight of the cathodes. The bus bars shall be electrically isolated from the stainless-steel tank and shall be connected to the positive polarity wiring supplied from the rectifier. Two conductive bronze saddles (rated for 500 A) for holding the anode bar shall be procured and installed by the Contractor. The anode bus bar shall be of copper metal and a diameter of 1 with a length of 80 and shall be supplied by the Government. 5.2.16 Two cathodes of 316 stainless steel and a thickness of 14 gauge shall be procured and installed on Tank T1 by the Contractor. These cathodes shall be of dimension 40 width and 110 length and shall be hung on cathode bus bar using 316 stainless steel straps.

More opportunities from Department Of Defense → W6QK Ccad Contr Office

Same awarding agency

NAICS: 811310
New
Federal
AH-64 Non-Rotating Control Swashplate Assembly Liner Replacement
Solicitation # AP63B4-6246-6056
Solicitation W912NW-27-Q-A001 is a firm fixed price contract issued by the Army Contracting Command Redstone Arsenal Corpus Christi Army Depot for the refurbishment of 40 AH-64 Non-Rotating Control Swashplate assemblies, part number 7-311527061. The scope of work requires a mandatory Teflon liner replacement using the qualified KAHR-LON X-1200S system and the application of proprietary Dicronite dry film lubrication. All work must be performed at the contractor's facility in compliance with OEM Drawing 7-311527061 and DMWR 1-1615-315. The period of performance runs from November 19, 2026, to November 18, 2027, with a strict turnaround time of 20 weeks from the receipt of assets to delivery at the Corpus Christi Army Depot. The contract will be awarded to the responsible offeror providing the lowest price, with the government evaluating the total price of the basic requirement and all options. Technical requirements include strict marking and labeling using two-dimensional data matrix symbology per ISO/IEC 16022 and detailed reporting of unique item identifiers upon delivery. The contractor is responsible for final inspection and functional testing, while final government acceptance is conducted by the CCAD Directorate of Quality Assurance. Administrative requirements include invoicing through the Wide Area Work Flow database and adherence to various federal and defense regulations, including NIST SP 800-171 for cybersecurity and the Buy American and Balance of Payments Program.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

4 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS