This Sources Sought opportunity from Department Of Defense was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1

Closed
W912EK28UMRRQBProjectStage1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
PWC Mosquito ADA Fishing Pier
Solicitation # SRC0000042902
The Ohio Department of Natural Resources is soliciting bids for the replacement and installation of an ADA-compliant fishing pier at Mosquito Lake State Park. The project requires the fabrication, delivery, and installation of a modular aluminum dock system, which includes a gangway, a 40 by 8 foot main walkway, and a 40 by 8 foot fishing extension. The contractor is responsible for providing all labor, materials, and equipment, and must remove existing old structures and debris from the site. All components, including handrails and fishing benches, must conform to ADA requirements. Work is scheduled to commence on December 1, 2026, with a final completion and delivery deadline of April 30, 2027. The contract will be awarded to the lowest responsive and responsible bidder based on the low lot total, calculated by multiplying unit costs by estimated usage. To be deemed responsive, bidders must provide quotes for all items. The selected contractor must maintain a performance bond and insurance from a provider with an A.M. Best rating of A or better and a financial size of VII or better. Additionally, the contractor must comply with Ohio ethics laws, maintain financial records according to Generally Accepted Accounting Principles, and provide a signed Affirmation and Disclosure Form regarding the location of services and data.
Dnr353411 Mosquito Lake State Park Dnrtru

POSTED

about 11 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
The Cayuga Inlet Flood Risk Reduction and Restoration project, identified as Project No. 46108-C, is a unit price construction contract issued by the New York State Department of Environmental Conservation and the Office of General Services. Located at 900 Taber Street in Ithaca, New York, the project has an estimated value between 23 million and 24 million dollars. The primary scope of work involves comprehensive environmental remediation and construction, specifically focusing on hydraulic dredging, earthwork for the preparation of a site management facility cell, and the establishment of staging and laydown areas. Key technical requirements include the use of geotextile tubes for dewatering, the implementation of a marine traffic control plan, and strict adherence to USACE and APWA standards for surveying and utility marking. Bids are submitted via Bid Express, with the contract awarded to the apparent low bidder based on responsiveness and responsibility, including an evaluation of financial data and past performance on similar projects. Bidders must provide bid security of 599,200 dollars, and the successful contractor is required to furnish performance and labor and material bonds for 100 percent of the contract amount. The project mandates compliance with New York State prevailing wage schedules, MWBE-EEO guidelines, and specific safety certifications for the transport of hazardous materials like calcium oxide. Deliverables include pre-construction and progress bathymetric surveys, daily dredge reports, and detailed waste manifests for disposed materials.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Dothan All-Wheel Park
Solicitation # 271007
Bid 271007 is a solicitation by the City of Dothan for the construction of the Dothan All-Wheel Park located at 100 Recreation Road, Dothan, Alabama. The project scope includes the development of a BMX Pump Track and a Freestyle Park, along with comprehensive site improvements such as grading, landscaping, site lighting, parking lot enhancements, and the installation of connecting sidewalks and pedestrian pathways. A critical requirement for the project is that the General Contractor must employ a specialty construction subcontractor who is a USA BMX-approved builder to handle the construction of the BMX facilities. The procurement follows a two-stage process beginning with pre-qualification proposals, which were due by November 23, 2026, in three hard copies and one digital copy on a USB flash drive. Only General Contractors licensed under the State Licensing Board for General Contractors per the Code of Alabama, 1975, are eligible. Following pre-qualification, sealed bids for the base project and alternates are due by December 17, 2026, at 2:00 PM CST. Bidders must provide a cashier's check or bid bond of at least 5 percent of the bid amount, capped at 10,000 dollars. A mandatory pre-bid conference was scheduled for December 3, 2026. Upon contract signing, the selected contractor must provide performance and payment bonds, insurance, and immigration documentation in compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act.
City of Dothan

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Milpitas Sports Center Football Bleacher Replacement
Solicitation # 26-283
The City of Milpitas is soliciting bids for Project No. 3505, the Milpitas Sports Center Football Bleacher Replacement. This project involves the demolition and removal of existing football bleachers and footings, followed by the construction of new home bleachers and various site improvements. The scope of work includes earthwork, grading, erosion and sediment control, concrete work, electrical conduit routing and relocations, and the installation of fencing and gates. Additionally, the project requires comprehensive ADA upgrades to parking areas, restrooms, and access ramps. The engineer's estimate for the base bid is between $1.2 million and $1.4 million, with a required completion timeframe of 330 calendar days from the Notice to Proceed. Eligible bidders must hold a Class A contractor license and comply with California prevailing wage laws for Santa Clara County. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid alone. Submission requirements include a 10% bid security, a noncollusion declaration, and certification of registration with the Department of Industrial Relations. The successful contractor must self-perform at least 40% of the work. Project administration includes progress payments at 95% of the City's estimate with a 5% retention, contingent upon the submission of updated CPM schedules and construction photographs. Liquidated damages for delays are set at $4,200 per day.
Engineering (CIP)

POSTED

about 15 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
Lewis Park Improvements
Solicitation # 2026-IFB-222
Solicitation 2026-IFB-222 is an invitation for bids issued by the City of Pittsburgh Department of Public Works for a general contractor to perform improvements at Lewis Park in Hazelwood. The scope of work includes the construction of two basketball courts, a playground area, a pavilion, and greenspace. Base bid activities encompass staking, demolition, site preparation, grading, concrete and asphalt work, site furnishings, pavilion installation, and backfill and seeding. The project also includes several alternates for the installation of trees, trash and recycling receptacles, general landscape plantings, and an upgrade to six-inch concrete for vehicular access. The contractor is responsible for coordinating the installation of owner-supplied items, including the pavilion, spray features, safety surfaces, and playground equipment. The contract will be awarded to the lowest responsive and responsible bidder on a lump sum basis. Bids must be submitted electronically via OpenGov by November 16, 2026, at 2:00 pm. Required submission documents include a Vendor Questionnaire, a Schedule of Values following the provided template, a Vendor Contact Sheet, a Vendor Registration Form, and an EORC Participation Form. The City has established specific participation goals for disadvantaged business enterprises, including 18 percent for MBEs, 7 percent for WBEs, 5 percent for Veteran-Owned Small Businesses, and 3 percent for LGBTQIA+ businesses. Performance is subject to strict compliance with Pennsylvania prevailing wage rates and certified payroll requirements. Post-award requirements include the submission of a performance bond equal to 100 percent of the contract price, a payment bond, and current certificates of insurance. The City intends to pay invoices within 45 calendar days of receipt, provided they are submitted within 30 days of work completion and include the necessary purchase order and controller numbers. All work must adhere to the provided bid drawings and meet industry standards, with final acceptance contingent upon a pre-final inspection and the completion of a deficiency punch-list.
Public Works

POSTED

about 16 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
2026008-RFP3819 RIVERWOOD PARK
Solicitation # 2026008-RFP3819
Columbia County, Georgia, is soliciting bids for the construction of Riverwood Park under solicitation number 2026008-RFP3819. The project requires a General Contractor to provide all labor, equipment, materials, and supervision to execute a comprehensive scope of work including site demolition, clearing, grading, and the construction of facilities. Key deliverables include the installation of play structure assemblies, splash pad equipment and plumbing, mountain biking trails, concrete paths, parking lots, site lighting, furnishings, and landscaping improvements. The project must be completed within 480 consecutive calendar days following the notice to proceed, with liquidated damages set at 1,000 dollars per day for delays. Bidders must submit a Non-Collusion Affidavit, a list of at least five clients for similar projects of comparable size and complexity, and a comprehensive list of all major subcontractors. The base bid includes a general allowance of 500,000 dollars covering overhead and profit. Several deductive alternates are available, including sports field lighting, sand cap and sod, toddler play equipment, bonded rubber surfacing, a slide mound, and mountain bike trails. Bids must remain valid for 60 calendar days after the closing date, and the successful bidder must execute the formal contract and provide surety bonds as required by AIA 101 and AIA 201 standards within 10 days of acceptance.
Columbia County

POSTED

about 17 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Rock Island District, is conducting a Sources Sought and Request for Information for Stage 1 of the Upper Mississippi River Restoration Quincy Bay Habitat Rehabilitation and Enhancement Project. Located in Adams County, Illinois, the project aims to restore critical waterfowl habitat and address sedimentation and invasive species within a 2,350-acre area. The government is seeking information on the availability and capabilities of qualified contractors to determine the appropriate acquisition method and whether a small business set-aside is feasible. The anticipated solicitation may utilize a FAR 14 Invitation for Bid under NAICS code 237990, with a size standard of 45 million dollars. Stage 1 of the project focuses on mechanical excavation and dredging of approximately 260,000 cubic yards of material across 35 acres to create overwintering habitat and access channels. Key activities include side casting and hauling material to specific placement sites for topographic diversity, tree and brush clearing, and the installation of 1,100 tons of RR3 sized stone for bank stabilization on Cedar Creek. The project also includes the creation of river training structures. Construction is primarily planned for 2028. Interested parties must submit a capability statement, including three relevant references and socio-economic status, to the designated contract specialists by the specified deadline.

General Info

USACE seeks contractors for Quincy Bay habitat restoration and dredging in Adams County.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Quincy, IL, 62301, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-5001, USA

Full Description

Show more

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1


Purpose and Objectives:  The purpose of this notice is to obtain information regarding: (1) the availability and capability of all qualified companies;  (2) whether they are small or large businesses; HUBZone small businesses; service-disabled, veteran- owned small businesses; 8(a) small businesses; veteran-owned small businesses; woman-owned small businesses; or small disadvantaged businesses; and (3) their understanding and experience relative to the proposed acquisition to assist the Government in determining the expectation of receiving bids from responsible contractors at fair market prices. Your responses to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set- aside is possible. An organization that is not under the applicable NAICS code can submit a response to this notice, however their capabilities may/may not be assessed for the purposes of this notice. 


A determination by the Government not to compete this requirement as a set-aside based upon responses to this Notice is solely within the discretion of the Government.


The Corps of Engineers (COE), Rock Island District does not intend to award a contract on the basis of responses received. This announcement is for information and planning purposes only and is not to be construed as commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. NO AWARD will be made from this Sources Sought Notice. This is NOT a request for proposal, quote or invitation for bid.  Interested parties are expected to review this Notice and the Project Requirements to familiarize themselves with the requirements of this project.


NAICS Code and Size Standard:  In the event a solicitation is issued, North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction, with a size standard of $45 Million, is being considered.


Solicitation Type: The Government is considering using a RFO FAR 14 Invitation for Bid for solicitation of this project.


Background: The Quincy Bay Habitat Rehabilitation and Enhancement Project area spans approximately 2,350 acres along the right descending bank of the Upper Mississippi River System, situated between River Mile 327.0 to 332.0 within Pool 21. It is located in Adams County, Illinois adjacent to the City of Quincy. The project area contains several Mississippi River Project Master Plan land classifications, including Wildlife Management, High Density Recreation, and Vegetation Management land classifications.


Historically, Quincy Bay was an important stopover point for diving ducks during spring and fall migrations. Sedimentation within the project area has resulted in decreased water depths and reduced habitat availability. Today, the reduced depth of the Upper Bay and lack of aquatic vegetation supports very few migratory waterfowl. Furthermore, floodplain forests have experienced an increase in invasive species and a decrease in regeneration and diversity. Relatively diverse pre-settlement floodplain forests are now largely dominated by silver maple and cottonwood. Without restoration, the project area’s open waters would continue to convert to shallow backwaters and drier bottomland forests would continue to develop into plant communities dominated by flood tolerant species and invasive species such as reed canary grass and Japanese hops.


The entirety of the Quincy Bay Habitat Rehabilitation and Enhancement Project consists of the following proposed activities and features: dredged material placement with forest rehabilitation, dredging for overwintering habitat and sediment reduction, bank stabilization, river training structures, cut-through channel modification, Cedar Creek modification, vegetated overflow structures, aquatic vegetation plantings, timber stand improvement, and pothole enhancement. The total project will be carried out in multiple stages. The focus of this Sources Sought is Stage 1: dredging for overwintering habitat, access dredging, topographic diversity enhancement, bank stabilization, and river training structures.


Project Requirements:


Stage 1: Dredging for Overwintering Habitat (OW 1-3), Access Dredging (AD-OW-1 AD-OW-3), Topographic Diversity (TD 1-4), Bank Stabilization (BS 2), and River Training Structure (RTS 4-5) See Figure 1 for feature locations.


Areas considered as part of this Project and described as the Project area include Quincy Bay, Quinsippi Island, backwater areas, and adjacent federally owned General Plan Lands.


Approximately 16 acres of Quincy Bay and backwater channels will require access dredging (AD-OW-1 AD-OW-3), with approximately 19 acres requiring additional dredging to create deeper overwintering habitat (OW 1-3) for native species. Mechanical excavation/dredging will be required.  Channel depths are up to 8 feet below flat pool and will have a channel bottom between 50 and 60 feet wide.  Quantities excavated will be approximately 260,000 cubic yards of material over a total length approaching 16,000 feet. 


Excavated material will be side cast where possible and shaped to tie into the existing bankline. This material will be handled multiple times. Side casting will only be possible for a portion of the material to be removed from the dredge cuts. Material that cannot be side cast and shaped will need to be hauled to the shoreline placement sites. Placement sites are located at a minimum of 25 feet from the channel cut. The placement sites vary in width ranging from approximately 40 feet wide to 60 feet wide. Material will be required to remain within the placement site limits, with no material allowed to reenter the channel cuts, or be removed from the project area.  


These dredge placement sites will be used for topographic diversity features (TD 1-4). A top elevation may not be exceeded at the placement sites, and material will be required to be spread evenly across the placement sites in preparation for future work. Shaping of these sites to maintain a side slope will also be required. Tree/brush clearing will be required in select locations to ensure placement sites tie into the bankline. Trees outside of the placement site limits will not be damaged or removed.


Bank stabilization (BS 2) for approximately 400 linear feet on Cedar Creek will require clearing; hauling, grading, and shaping; and placement of 1,100 tons of RR3 sized stone, with approximately 8 inches of bedding stone underlay. The bank will be shaped to maintain a predetermined slope to height ratio per the project design, with consideration for the width of the stone placement. Surveying after the bank stabilization to confirm the appropriate ratio will be required.


River Training Structures (RTS 4-5) along the exterior edge of topographic diversity placement (TD1) will require specific shaping of dredged material to create more diversity in the placement alignment/orientation.


This will be a construction contract to be primarily constructed during 2028.


Capability Statement/Information Sought:  All parties interested in this project must demonstrate that they would have the potential to be a responsive and responsible contractor. Interested businesses shall include the following information to be considered for this Sources Sought announcement:


  1. Company Name, UEI/CAGE (If your company does not have at the time of this sources sought, please be aware that you will be required to register your company in the System of Award Management (SAM) system to be eligible for any future Federal contracts), POC information including an email, current small business and socio-economic status for the NAICS code listed above.
  2. Three references for successful work of a similar scale and nature to the requirements of UMRR – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1.
  3. Company’s interest if a solicitation for this project is issued.
  4. Company’s business category and size
  5. Company’s capability to perform on the project description outline above.

In order for the Government to make Small Business (SB) set-aside (or other socioeconomic subcategory) determination, it is emphasized that SB concerns provide sufficient written information to clearing demonstrate their capacity, capability, and responsibility (in accordance with RFO 9.1.


Information Submission Instructions:


1. Page Limitations: Interested qualified firms should submit a tailored response that clearly details the firm’s ability to perform the aspects of the notice described above and in the Project Requirements.  An organization’s submission is not to exceed five (5) single sided pages.


2. Number of Copies:  All submissions sent in response to this SOURCES SOUGHT/Request for Information notice must be submitted via e-mail to the contract specialist, Bobbi Boeh at Sign up to see this detail and Deputy, Small Business Programs, Troy Robbins at Sign up to see this detail. The e-mail subject line must specify “Response to Sources Sought: UMRR Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1”.


3. Due Date/Time:  Electronically submitted submissions are due no later than the date listed on the SAM.gov Sources Sought Notice, however this does not restrict the Government from accepting responses after this time, if it is in the best interests of the Government for market research purposes, and also does not prohibit the Government from seeking potential capable, and responsible sources from information available from other resources (for instance:  small business databases, known sources, previous contractors) to determine a final procurement strategy.


More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 562111
New
Federal
Lake Red Rock Refuse Removal Services
Solicitation # W912EK27QA006
Solicitation W912EK27QA006 is a 100% Small Business Set-Aside for refuse and recycling waste management services at Lake Red Rock in Knoxville, Iowa. The project is issued as a firm fixed price contract consisting of a base period from March 1, 2027, to February 29, 2028, and four subsequent option years extending through February 29, 2032. The contractor is responsible for providing all labor, fuel, vehicles, and approved low-profile refuse storage containers to ensure 95% to 100% removal of waste from containers and adjacent areas. Key operational requirements include cleaning a 20-foot radius around each container during pickup, treating hauling trucks with odor-preventive chemicals weekly, and maintaining a response time of one hour for calls between 7:30 a.m. and 6:00 p.m. Award will be granted to the lowest priced offeror that meets the Performance Work Statement requirements and provides all necessary documentation, including a technical capability statement and a completed Past Performance Questionnaire. The contract incorporates strict quality standards, requiring a satisfactory rating of 95% or higher on random sampling inspections and 100% accuracy for monthly invoices processed via the Wide Area WorkFlow system. Additionally, the contractor must maintain specific insurance per FAR Clause 52.228-5 and adhere to the safety requirements of the Corps of Engineers Manual EM 385-1-1. Price evaluation preferences are available for HUBZone small business concerns.
Solid Waste Collection

POSTED

about 19 hours ago

DEADLINE

in 13 days
View Details
NAICS: 541690
New
Federal
Natural Resource Investigations in the Upper Mississippi River Basin, Mississippi Valley Division (MVD)
Solicitation # W912EK27TBD
The US Army Corps of Engineers, Rock Island District, is conducting a sources sought notice to identify qualified small business sources for natural resource investigations within the Upper Mississippi River Basin and potentially the lower Mississippi River. The scope of work involves specialized species surveys for federally endangered bats and freshwater mussels, requiring dive capabilities and specific permits from the USFWS and state agencies. Additionally, the requirement includes habitat evaluation, restoration design, biological data collection, GIS mapping, and the preparation of technical reports and mitigation plans in accordance with the National Environmental Policy Act. The government is utilizing this process to determine if a set-aside is appropriate for various small business categories, including HUBZone, 8(a), and veteran-owned entities. Interested parties must submit a tailored capability statement of no more than ten pages by December 4, 2026, detailing their performance approach and small business status. Key operational requirements include the ability to mobilize within seven days of a task order and the capacity to manage at least three simultaneous task orders. For teaming arrangements, the small business must incur at least 15 percent of the total contract value to comply with limitations on subcontracting.
Other Scientific and Technical Consulting Services

POSTED

4 days ago

DEADLINE

in 22 days
View Details
NAICS: 326199
New
Federal
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication
Solicitation # W912EK27RA001
The U.S. Army Corps of Engineers, Rock Island District, is soliciting proposals for the design, testing, fabrication, and delivery of ten Fiber Reinforced Polymer (FRP) composite structures for the Brandon Road Lock and Dam in Joliet, Illinois. The required deliverables include two 16 x 16 ft dam headgates, two 14 x 14 ft filling valves with corresponding downstream bulkheads, and two 8 x 8 ft flushing valves with corresponding bulkheads. This is a 100% Small Business Set-Aside under NAICS code 326199, with a size standard of 750 employees. The project follows a Lowest Price Technically Acceptable (LPTA) source selection process, where awards are made to the lowest-priced proposal that meets all technical and past performance requirements. Technical acceptability requires offerors to provide three fact sheets demonstrating the fabrication of FRP structures exceeding 10,000 pounds using the vacuum infusion process, as well as resumes for a Professional Engineer and a Fabrication Supervisor with equivalent experience. Proposals must be submitted electronically via the PIEE Solicitation Module by November 30, 2026, and must include a bid guarantee of 20 percent of the price or 3 million dollars. The performance period extends up to 730 calendar days from the Notice to Proceed, with the first product shipment due within 365 days. Delivery is FOB Destination, and the successful contractor must provide performance and payment bonds equal to 100 percent of the contract price within ten days of award.
All Other Plastics Product Manufacturing

POSTED

4 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS