Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Southeast Service Area (Service Area 3) Lateral Pipeline Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of approximately 28,600 linear feet of new water pipelines ranging from 8 to 42 inches in diameter, along with associated appurtenances and turnouts for agricultural water distribution in an unincorporated area southwest of Porterville, California. Key components include the construction of a new pump station adjacent to the Friant-Kern Canal, the upgrade of an existing pump station in the same location, and the building of a new turnout structure within the Poplar Ditch near South Newcomb Street. All infrastructure is to be installed underground with valve boxes at finish grade, primarily within public rights-of-way and executed easements, and no new water supplies or groundwater extraction are part of the scope. The project is led by the Porterville Irrigation District, with performance occurring in Tulare County at the designated site, and the construction duration is expected to be 311 days, though specific start and end dates are not provided. Environmental compliance forms a central requirement of the project, mandating adherence to CEQA and NEPA, as well as federal and state regulations related to endangered species, cultural resources, and water quality. Mitigation measures are a condition of approval and include pre-construction biological surveys, seasonal activity restrictions to protect nesting birds, establishment of buffer zones around sensitive habitats, and consultation with Native American tribes under AB 52 and the National Historic Preservation Act. A formal Mitigation Monitoring and Reporting Program is required, with ongoing compliance reports and public disclosure obligations. Supporting documentation includes detailed inventories of local vascular plants and terrestrial vertebrates, official species lists from federal wildlife agencies, staff resumes demonstrating qualified environmental expertise, and site photographs. While specific pricing, contract value, and payment details are not available, agency-specific codes like 240-150-028 and 302-320-033 are referenced, likely corresponding to funding or accounting identifiers. No formal contract clauses, evaluation factors for award, invoicing methods, or COR/COTR designations are specified in the documentation, and there is no indication of small business set-asides, UEI or CAGE codes, or standard FAR clauses. The procurement process, while posted on a state environmental review platform, lacks traditional contractual elements such as line items, delivery schedules, or FOB terms, suggesting the document is primarily an environmental planning record with contractual obligations embedded within compliance conditions rather than standard acquisition terms.

General Info

Install 28,600 ft of water pipelines and pump stations in Tulare County with strict environmental compliance and no new water extraction.

Agency

California → Porterville Irrigation District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Highway 190 and S. Westwood St. (Road 224), Porterville, CA, 93258

Set-Aside

NONE

Documents

(8)

Porterville ID Service Area 3 Pipeline Project Summary Form

PDFenvironmental-summary

Porterville ID Service Area 3 Pipeline Project Mitigated Negative Declaration

PDFmitigated-negative-declaration

Porterville ID Service Area 3 Pipeline Project Notice of Determination

PDFdetermination-and-findings

Porterville ID Service Area 3 Pipeline Project Draft Mitigated Negative Declaration

PDFmitigated-negative-declaration

Porterville ID Service Area 3 Pipeline Project Monitoring and Reporting Program

PDFmonitoring-and-reporting-program

Porterville ID Service Area 3 Pipeline Project Initial Study

PDFinitial-study

Porterville ID Service Area 3 Pipeline Project Notice of Intent to Adopt MND

PDFspecial-notice

Porterville ID Service Area 3 Pipeline Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Porterville Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Porterville Irrigation District
Office AddressN/A
Contacts
Sean GeivetGeneral Manager

Interested Companies (1)

Show more
Dennis R. Keller Consulting Civil Engineer
Visalia, CA

Full Description

Show more
The Project consists of the installation of approximately 28,600 linear feet of new 8-inch through 42-inch diameter water pipelines, water pipeline appurtenances and turnouts for agricultural water distribution in an unincorporated area southwest of the City of Porterville. The Project includes the construction of one (1) new pump station adjacent to the Friant-Kern Canal, upgrading an existing pump station adjacent to the Friant-Kern Canal and construction of one (1) new turnout structure within the Poplar Ditch near South Newcomb Street.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,
FA3029 71 Ftw Cvc

POSTED

2 days ago

DEADLINE

in 17 days
View Details