Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SP-158-2025

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project SP-158-2025 involves the demolition of an existing building on a 2.15-acre lot at 7441 Lincoln Way in Garden Grove, California, to facilitate the construction of a 50,300 square foot Type III-B warehouse. The facility will feature a 5,000 square foot office, including a 3,500 square foot mezzanine, with a maximum building height of 46 feet. Site improvements include 52 parking spaces, six gated truck loading docks, a 40-foot driveway connection, and 12,010 square feet of landscaping. Security measures will consist of an eight-foot-tall block wall, tubular steel fencing, and security lighting. Managed by the City of Garden Grove and the applicant JYJ Logistics, LLC, the project is classified as a forecast and is subject to a Categorical Exemption under CEQA Guidelines Section 15332 for In-Fill Development Projects. Key compliance requirements include adherence to the Migratory Bird Treaty Act, necessitating pre-demolition avian surveys by a qualified biologist. The project has been reviewed for traffic, noise, air, and water quality, with findings indicating no significant environmental impacts. No federal acquisition regulations or specific contract pricing were identified, as the documentation focuses on land use, zoning, and environmental regulatory approval.

General Info

Demolition and construction of 50,300 sq ft warehouse with office, parking, loading docks, and landscaping in Garden Grove under local approval.

Agency

California → City of Garden Grove

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Northwest corner of Lincoln Way and Western Avenue, Garden Grove, CA, 92841

Set-Aside

NONE

Documents

(1)

Site Plan No. SP-158-2025 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Garden Grove
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Garden Grove
Office AddressN/A
Contacts
HUONG LYAssociate Planner
Annie Gallagher4 Park Plaza, Suite 830, Irvine, CA 92614

Full Description

Show more
The proposed project would involve the demolition of the existing building on a 2.15-acre lot and the construction of a 50,300 square foot, Type III-B warehouse building as well as the associated parking and landscaping. The proposed warehouse would include a 5,000 square foot office of which 3,500 square feet would be a mezzanine. The maximum height of the warehouse would be 46 feet. In total, 52 parking spaces would be provided as well as six truck loading docks. The loading docks and rear parking area are gated and would be accessed through an automatic gate. Access to the site would be provided by one, 40-foot driveway connection and an internal drive aisle connected to the adjacent parcels in the office complex. As part of the site improvements, an existing driveway connection to the north side of Lincoln Way would be removed to make space for the proposed building. Landscaping would total 12,010 square feet and would also include an eight-foot-tall block wall, tubular steel fencing and security lighting.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS