Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Specialized Component Supply (Flow Meter & Valves)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract, titled Specialized Component Supply (Flow Meter & Valves), involves the supply and installation of monitoring and control hardware for prime contractors supporting US Air Force 56CES projects at Luke Air Force Base. The scope of work specifically requires the replacement of McCrometer flow meters and the installation of oil drum vent pipes equipped with electric solenoid and manual dripper valves. The final deliverables include fully installed and calibrated flow meters along with a functional vent and dripper valve system. The opportunity is designated as a total Small Business Set Aside under NAICS code 423810 and is managed by the Department of Defense. Interested parties must respond by September 9, 2026, following the posting date of September 2, 2026.

General Info

Supply and install flow meters and valves for USAF projects at Luke Air Force Base.

NAICS

423810 - Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers

Place of Performance

Luke Air Force Base, AZ, 85309, USA

Set-Aside

SBA

Documents

This scope was carved out of FA488726Q0051.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Luke AFB Well Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs monitoring and control hardware for prime contractors on US Air Force 56CES projects. Replaces McCrometer flow meters and installs oil drum vent pipes with electric solenoid and manual dripper valves. Delivers installed and calibrated flow meters and a functional vent/dripper valve system.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price contract set aside for small businesses under NAICS 335921. The project requires a contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The installation will connect Radar Approach Control to several critical sites, including the Air Traffic Control Tower, Command Post, Base Operations, and various flightline equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The work involves utilizing both existing manhole/handhole duct systems and direct burial methods. The contractor must provide all new, rust-proof, and corrosion-resistant materials, labor, and equipment, as the government will provide no supplies. The period of performance is not to exceed 180 calendar days. Award will be based on the lowest priced, technically acceptable quote, with evaluations focusing on the installation design, a quality control plan, and past performance via the Supplier Performance Risk System. Key deliverables include as-built drawings, meeting minutes, and an OPSEC plan. Technical acceptance requires rigorous testing using Optical Time Domain Reflectometer and Optical Power Meter tests in accordance with TIA 526-7. Contractors must adhere to strict base access protocols, environmental guidelines regarding lead-based paint and hazardous materials, and utilize the Wide Area WorkFlow system for all invoicing and payments.
Fiber Optic Cable Manufacturing

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS