Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SR 70 Binney Junction Roadway Rehabilitation and Complete Streets Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Route 70 Binney Junction Roadway Rehabilitation and Complete Streets Project, managed by Caltrans District 3 in Marysville, Yuba County, involves extensive roadway and flood control infrastructure improvements. A critical component of this project is the relocation of a refined petroleum pipeline under Permit No. 3283-4, which is part of the broader work authorized under Permit No. 19755. The scope includes abandoning an existing pipeline in place within the floodway and beneath the levee and Union Pacific Railroad lines, while installing a new 8-inch pressurized welded steel pipeline. This installation will utilize the open-cut method along the waterside edge of the relocated railroad line and boring techniques to pass beneath the levee and adjacent railroad tracks. The project is situated along the waterside and landslide embankments of the Simmerly Slough levee near the intersection of State Route 70, extending from south of 14th Street to north of Cemetery Road. Comprehensive construction activities include levee setbacks, the installation of cutoff walls and pump stations, roadway realignment, railroad track relocation, and the construction of a new levee crown access ramp. The Central Valley Flood Protection Board has issued Notices of Determination for both the specific pipeline relocation and the overall project, concluding that the work will not have significant environmental effects within its jurisdiction based on an Environmental Impact Report. All work is conducted in accordance with the California Code of Regulations regarding adopted plans of flood control.

General Info

Caltrans District 3 project relocating petroleum pipelines and improving roadway and flood infrastructure.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Marysville, CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for CalTrans Binney Junction Project Permit No. 3823-4

PDFdetermination-and-findings

Notice of Determination for Permit No. 19755 - SR 70 Binney Junction Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist
Marta Martinez-TopeteEnvironmental Scientist

Full Description

Show more
Approval of Permit No. 19755, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct the State Route (SR) 70 Binney Junction Project which includes construction of a setback levee adjacent to the east finger levee to allow for the realignment of SR 70; installation of cutoff walls within the east setback and west finger levees and portions of the Marysville Ring Levee; construction of a pump station and discharge pipe through the west finger levee; removal or abandonment of portions of an existing culvert and remove an existing headwall crossing under the finger levee; removal of the existing pump station and discharge pipe; replacing the floodgate and pipe gate; realignment of a portion of the Marysville Ring levee in vicinity of new floodgate structure; realignment of portions of 24th Street to avoid project impacts to railroad and levee; removal of portions of an existing storm drain and the placement several drainage inlets to capture runoff; construction of new levee crown access ramp; replacement of the Marysville and Binney Junction underpass; placement of fill for the Union Pacific Railroad track relocation; lowering the roadway profile at the Marysville and Binney Junction underpass; and the use of land for a staging area adjacent to the east “finger” levee in Marysville along SR 70.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS