This Solicitation opportunity from South Carolina was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Stevenson Performing Arts Center Marquee
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Orangeburg is soliciting a turnkey solution for the design, construction, and installation of a custom full-facade marquee at the Stevenson Performing Arts Center located at 979 Middleton St., Orangeburg, SC. The marquee is intended to serve as a prominent architectural feature that enhances the building's façade while incorporating functional elements such as LED lighting, digital displays, and illuminated channel letters spelling "STEVENSON." The project requires a comprehensive scope including structural steel framing compliant with wind and seismic standards, aluminum composite panel soffits, a roof deck with integrated rubber membrane and drainage, laser-cut aluminum cladding with decorative caps, two full-color digital displays with a five-year manufacturer warranty, and optional programmable RGB lighting with a DMX controller. The vendor must provide conceptual and production-ready drawings, 3D renderings, and engineering plans stamped by a licensed professional, along with field surveys, crane-based installation, and coordination for potential brick removal and restoration. All work must comply with ADA, OSHA, and local building codes, and materials must be selected to withstand South Carolina’s humid, UV intensive, and windy climate. The vendor is responsible for securing permits and coordinating road closures, though permit fees will be passed through at actual cost. Power will be supplied by the City, and the contractor is not responsible for electrical infrastructure beyond connection. The budget is capped at $250,000, inclusive of all taxes and contingencies, with proposals required to include an itemized cost breakdown aligned with the scope elements. The timeline demands design completion within 4–6 weeks of award, fabrication in 8–12 weeks, and installation within 2–4 weeks, targeting full completion by August 15, 2026. A minimum one-year warranty covers labor and materials, while digital components require a five-year manufacturer warranty, with defective parts replaced within 90 days at no cost. Proposals must include organizational overview, technical methodology, insurance and bonding proof, itemized pricing, and at least three references for similar projects, submitted as a single PDF to three designated city email addresses by May 29, 2026. Evaluation will prioritize cost competitiveness and value at 30%, followed by technical approach, qualifications, and timeline each at 20%, with lesser weight given to innovation, sustainability, and reference quality. The City reserves the right to reject proposals, negotiate terms, or award in part, and gives preference to local contractors.
General Info
Place of Performance
SC, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from South Carolina → City of Orangeburg
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
