Stream Gage Equipment Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the installation of a stream gage system in the creek bed within San Luis Obispo, utilizing only hand tools for all aspects of the work. The system must include a pressure transducer and a water temperature sensor, both connected via appropriate cabling, and secured firmly using drive pins and rock anchors to ensure long-term stability and accuracy in data collection. The installation must be performed with precision to withstand environmental conditions and maintain functionality without mechanical or powered assistance. This subcontract, posted on June 16, 2026, falls under NAICS code 238990 and is managed by San Luis Obispo County in California. The project is focused on environmental monitoring infrastructure in a natural waterway setting, with no specified set-aside provisions or additional organizational details provided. All work must comply with site-specific constraints and environmental factors inherent to the creek bed location, ensuring the installed equipment remains operational and undisturbed under natural flow and sediment conditions.

General Info

Install stream gage with pressure transducer and temperature sensor in San Luis Obispo creek bed using only hand tools.

Agency

California → San Luis Obispo County

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

San Luis Obispo, CA

Set-Aside

NONE

Documents

This scope was carved out of ED No. 26-0081.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

San Luis Obispo Creek at San Luis Bay Drive near Avila Beach Stream Gage Project No. 455R277613/ ED No. 26-0081

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install a stream gage system including pressure transducer, water temperature sensor, and cabling using hand tools only, secured with drive pins and rock anchors along the creek bed.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS