Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Street Sidewalk Repair And Replacement Project

Closed
OPS-2023-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and cathodic protection; site work involving land surveying, clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additionally, the project requires the supply of various materials such as ready mix, precast concrete, and valves, as well as the implementation of storm water pollution prevention (SWPPP). This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their bids by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

40 minutes ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

3 days ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

3 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the removal and replacement of sidewalks, asphalt pavement, and curb and gutter at multiple locations throughout the City of Lake Forest, California. Additionally, the project requires tree root pruning at applicable sites to ensure proper pavement and sidewalk integrity. The work is expected to be completed within a contract value ranging from $500,000 to $1,500,000, reflecting a significant infrastructure improvement effort. The solicitation was posted on July 9, 2024, with a deadline for responses set for July 30, 2024. The project is managed by the City of Lake Forest, with Justin Kirk serving as the primary contact for inquiries. Interested parties can find more details and submit their responses through the designated procurement portal.

General Info

Documents

6

Attachment B Slot Patch Detail - City of Lake Forest

PDF, High priority: read this firstspecifications
High

OC Public Works Sidewalk Details STD Plan 1205

PDF, High priority: read this firstspecifications
High

Payment Bond Section 00620 for City of Lake Forest Project

DOCX, High priority: read this first4 pages · payment-bond
High

Performance Bond Section 00610 for City of Lake Forest Project

DOCX, High priority: read this first4 pages · performance-bond
High

RFB OPS-2023-01 Street Sidewalk Repair and Replacement Project

PDF, High priority: read this firstrfb
High

Attachment A Locations Map, List, and Pictures

PDF, Low prioritysupporting-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lake Forest
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The work to be performed consists, in general, of removing and replacing sidewalk, AC pavement, and curb and gutter at various locations within the City.  Tree root pruning will be required at locations where applicable.

More opportunities from California → City of Lake Forest

Same awarding agency

NAICS: 238210
New
SLED
Low Voltage System Support And Maintenance Services
Solicitation # 20261019028
The City of Lake Forest is seeking a consultant to provide hourly on-call maintenance and support services for its audio-visual and low voltage systems for a one-year term. The scope of work includes troubleshooting, repair, software and firmware updates, and installation support across multiple facilities, including City Hall, the Police admin building, the Performing Arts/Council Building, the Senior Clubhouse, and the Conference/Community Center. Key deliverables include bi-annual functional inspections of equipment listed in the provided inventory, which must include firmware updates, configuration backups, and physical condition checks of cabling and backbones. Response times are strictly defined, requiring a 24-hour turnaround for critical public safety outages and 2 to 3 business days for non-urgent issues. Proposals must be submitted via the OpenGov Procurement portal by October 30, 2026. Required submission components include a technical proposal detailing experience and qualifications, hourly rates for roles such as technicians, engineers, and programmers, an estimated cost for a single AV system inspection, and a disclosed equipment markup percentage. All work must be performed by appropriately certified personnel who adhere to City health and work policies. Payment is processed via invoicing after the delivery and City acceptance of products or services, with invoices requiring detailed documentation of part numbers, serial numbers, and service descriptions.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS