Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Oregon was posted on February 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Engineering Design & Load Strengthening Analysis

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is soliciting architectural services for the repair of the Lifeguard Headquarters located at 1 Municipal Wharf. The primary objective is to implement necessary repairs to ensure the facility is safe and operationally ready while the city conducts long-term planning for future use and expansion. The scope of work is divided into six key tasks: the preparation of 30 percent and 100 percent building permit plan sets and project specifications, the provision of construction cost estimates, bid support, construction support, and the delivery of final as-built drawings and annotated specifications. The selected architect must coordinate with multiple regulatory agencies, including the California Coastal Commission and NOAA, and ensure all designs comply with ADA standards and professional guidelines from organizations such as the AIA and ASCE. The selection process is qualifications-based, where an evaluation committee ranks the top three respondents based on expertise and experience without initial regard to fee, provided the final cost fits within the project budget. Proposals must be submitted by December 3, 2026, and include a main proposal with firm information, references from similar projects completed within the last five years, and a project schedule, with the fee proposal submitted in a separate sealed envelope. The contract is a Professional Services Agreement requiring compliance with California prevailing wage laws and equal employment opportunity regulations. Performance includes mandatory site visits to monitor quality and progress, culminating in a punch list and final certification of work.
Fire

POSTED

about 16 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Eugene in Oregon is seeking a subcontractor for a structural engineering design and load strengthening analysis project focused on the Ferry Street Bridge. The scope of work involves performing a detailed structural analysis and design to strengthen the bridge's load capacity, which includes evaluating current existing conditions and the preparation of as-constructed plans. This opportunity was posted on February 26, 2025, and requires responses to be submitted by the deadline of March 26, 2025. The project falls under NAICS code 541310 for engineering services.

General Info

City of Eugene seeks structural engineering subcontractor for Ferry Street Bridge load strengthening.

Place of Performance

OR, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 20252046.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP 20252046 Ferry Street Bridge Load Strengthening Engineering Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
  • Architectural Design ServicesOpen now, due in 59 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → City of Eugene
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → City of Eugene
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform structural analysis and design for load strengthening of the Ferry Street Bridge, including evaluation of existing conditions and preparation of as-constructed plans.

More opportunities from Oregon → City of Eugene

Same awarding agency

NAICS: 238220
SLED
COE IRFP HVAC Boiler and Chiller Water Treatment and Related Services
Solicitation # IRFP 20272022
The City of Eugene is seeking an experienced and certified vendor under solicitation IRFP 20272022 to provide full-service turnkey HVAC water treatment services, chemicals, and maintenance for water heating and cooling equipment across 10 city locations. The scope of work includes monthly site services consisting of cleaning, monitoring, testing, analysis, and reporting, as well as the provision of toxicologically safe chemicals to prevent corrosion, scale buildup, and biological growth. The selected contractor is responsible for the removal of unused chemicals and the disposal of all empty containers. Proposals must be submitted via OregonBuys by November 18, 2026, and must include a service plan, pricing for all locations, a cover letter, and three professional references. Award selection is based on a 100-point system, with the highest weights placed on the service plan (45 points) and proposal pricing (35 points). The contract requires the vendor to maintain a performance bond equal to the annual bid amount and provide evidence of insurance within ten days of the award. Key compliance requirements include adherence to the Eugene Code regarding non-discrimination and fair employment practices, as well as strict packaging guidelines to reduce waste through the use of reusable or sustainable materials. Payment is processed net 30 days following the submission of itemized invoices to the City of Eugene.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

20 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS