Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from District of Columbia was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Steel & Metal Fabrications

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to provide all labor, materials, equipment, and specialized tooling required to anchor 14 existing shipping containers to a cement-treated asphalt surface at 4300 West Capitol Avenue. The scope of work includes container pre-checks, drilling and cleaning holes, installing Bolthold asphalt anchors, bolting down plates, performing AWS welding for angle connections, and applying zinc-rich cold galvanizing spray for rust protection. All work must be performed according to PSE stamped drawings and structural calculations, with a total project duration of 90 working days from the Notice to Proceed. The estimated project value is 35,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish performance and payment bonds for 100 percent of the contract price. Compliance with California prevailing wage requirements and registration with the California State Department of Industrial Relations is mandatory. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, at 1:00 PM. Payment terms include 95 percent payment of progress estimates within 30 days, with a 5 percent retention held until final acceptance by the Engineer.
Capital Projects - Construction

POSTED

2 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This subcontract focuses on the fabrication and installation of structural steel and miscellaneous metal components for school modernization projects managed by the District of Columbia Department of General Services. The scope of work includes the delivery and installation of structural steel frames and metal supports, specifically covering intermediate floor framing for heights exceeding 14 feet, attachment plates, angle brackets, and various beam types including machine, divider, and hoist beams. Additionally, the contractor is responsible for installing pit ladders and machine room floor grates. The project falls under NAICS code 238120 and is associated with the District of Columbia. Interested parties should note that the response deadline for this opportunity is October 30, 2026.

General Info

Subcontract for structural steel fabrication and installation for DC school modernization by 10/30/2026.

Documents

This scope was carved out of DCAM-26-CS-RFP-0011.

The full solicitation package (46 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design-Build Services for Hendley ES Modernization

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Plumbing and Piping InstallationOpen now, due in 32 days
  • HVAC and Mechanical SystemsOpen now, due in 32 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → DCPS (C&P)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs structural steel and miscellaneous metal components for prime contractors on District of Columbia Department of General Services school modernization projects. Installs intermediate floor framing for heights over 14ft, attachment plates, angle brackets, machine beams, divider beams, hoist beams, pit ladders, and machine room floor grates. Delivers installed structural steel frame and metal supports.

More opportunities from District of Columbia → DCPS (C&P)

Same awarding agency

NAICS: 236220
New
SLED
LANGLEY ELEMENTARY SCHOOL MODERNIZATION
Solicitation # DCAM-27-CS-RFP-0003
The Langley Elementary School Modernization project, solicitation DCAM-27-CS-RFP-0003, is a design-build contract for the District of Columbia Public Schools to modernize a historic 1923 facility into an approximately 100,373 square-foot school including a Child Development Center. The scope involves a combination of renovation and new construction, specifically focusing on preserving the central auditorium and maximizing existing space to create a gymnasium compliant with DCPS Educational Specifications. The project also requires the design of new outdoor play areas, educational spaces, parking, loading facilities, and site fencing. A critical objective is resolving site safety and traffic concerns near the McKinley Tech entrance and improving accessible pedestrian pathways between the school, the parking lot, and the Harry Thomas Recreation Center field. The project is divided into design/preconstruction and construction phases, with a strong emphasis on retaining recent upgrades such as the 2024 HVAC and roof replacements and the 2022 elevator. Proposals are evaluated on a 112-point scale, with the highest weight placed on the Project Management Plan and Schedule. Award decisions are based on the most advantageous offer to the Department, with preferences given to Certified Business Enterprises (CBE) and Small Business Enterprises (SBE). Technical requirements include strict adherence to ADA accessibility, NFPA electrical and flammable storage standards, and ACI concrete tolerances. Financial allowances include $800,000 for permits, $500,000 for public art, and $400,000 for utilities. All submissions must be received by December 21, 2026.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS