Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on April 9, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

T.S. Golden Bear Incinerator Installation

Awarded
DTMA94Q20130014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Misty Barge Dry Dock Services
Solicitation # 1240BF27Q0002
Solicitation 1240BF27Q0002 is a total small business set-aside for the Department of Agriculture, specifically the USDA-FS CSA Northwest 4, to provide dry dock services for the Misty Barge in Wrangell, Alaska. The scope of work includes the haul out and blocking of the barge, sandblasting and painting of the interior and exterior hulls and exterior decks, cleaning of bilge tanks, and the installation of eight bolt-on zincs. Additionally, the contractor is required to fabricate a new anchor stand capable of accommodating two 1000 lb anchors. All painting must adhere to Preparation and Painting Specification 00300, and electrical work must comply with current ICC codes and NFPA 70, NEC. Award will be granted to the offeror providing the most advantageous quote, with price serving as the primary evaluation factor. Technical capabilities are evaluated based on the provision of a draft work schedule and proposed haul dates, while past performance is assessed based on the recency and relevancy of similar projects completed within the last three years. Proposals must be submitted via email by October 30, 2026, consisting of three separate attachments: technical capability, past performance, and pricing. The government maintains quality control through a Contracting Officer's Representative and requires a three-day notice prior to the inspection of bilge tanks.
Csa Northwest 4 Usda-Fs

POSTED

about 21 hours ago

DEADLINE

in 7 days
NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

about 21 hours ago

DEADLINE

in 10 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 21 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCG STA COOS BAY (47302-47242) FY27 DD REPAIR
Solicitation # 70z04027SSBPL28928
The Department of Homeland Security, through the U.S. Coast Guard SEA-C office in Norfolk, Virginia, has issued a Sources Sought Notice for dry dock repair services for two vessels, USCG STA COOS BAY (47302) and CG STA COOS BAY (47242). The anticipated work is scheduled to begin on March 2, 2027, in Charleston, Oregon, with an estimated period of performance of 121 calendar days per vessel. The scope of work requires the contractor to provide all necessary personnel, equipment, materials, and facilities to perform comprehensive repairs, including underwater body preservation, hull plating inspections, propulsion shaft and rudder assembly services, and the provision of marine chemist and sea trial support. The government intends to award a single firm-fixed-price contract, with the final competition and set-aside decisions based on market research conducted under NAICS code 336611. Interested sources must submit their capabilities, including company identification, UEI number, and business size certifications, to Troy Elliott by November 12, 2026. Evaluation of capabilities will include a review of past performance on projects of similar scope and a commitment to submit a proposal as a prime contractor. Economic considerations for the future award will include foreseeable costs such as crew lodging, messing, and travel in accordance with Joint Travel Regulations.
CG-SEA-C23

POSTED

about 21 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Department of Transportation Maritime Administration is seeking a firm fixed price contract for the installation of a new solid trash incinerator on the Training Ship Golden Bear in Vallejo, California. The project has a requested performance period of 30 days starting around April 1, 2013. Award evaluation is based on a pass/fail assessment of past performance and technical capability, with the final selection going to the lowest priced technically acceptable bidder. Offerors must provide a technical narrative, resumes for specialized personnel including ABS approved welders, and a history of similar work performed within the last three years. Recent amendments have extended the solicitation closing date to April 4, 2013, and significantly detailed the electrical requirements for the installation. The contractor is responsible for supplying and installing high voltage power, an emergency shutdown system, cabling for the flue gas damper and temperature transmitter, and fire suppression controls. All electrical work, wiring, and strapping must strictly adhere to ABS and USCG criteria. Additionally, the contractor must manage specific bulkhead penetrations and ensure all new cable supports are welded, primed, and painted.

General Info

Contract Value

$227,582.5

NAICS

336611 - Ship Building and Repairing

Place of Performance

200 Maritime Academy Drive, VALLEJO, CA, 94590, USA

Set-Aside

NONE

Award Issued Date

Documents

4

RFQ DTMA4Q20130014 TSGB Incinerator Installation - Terms and Conditions

PDF, High priority: read this firstrfq
High

Ship's Incinerator Installation Statement of Work

PDF, High priority: read this firstsow
High

ATT1_TSGB_INCIN_SF1449_QUOTE_SHEET_3-11-13_.pdf

PDF

ATT2_TSGB__INCIN_SOW_4-3-13.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 4, 2013 to Apr 5, 2013. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6991PE DOT Maritime Administration
Contacts1 person available
OfficeOAKLAND, CA, 94612, USA
Office AddressOAKLAND, CA, 94612, USA
Contacts
Patricia L. EtridgeContracting Officer

Full Description

Show more
Amendment 000003 changes the SOW and extends the closing date to 4/4/13 at 4PM PT as follows: 1. Statement of Work is changed to add Paragraph 5.8 to CLIN 001 SHIP'S INCINERATOR INSTALLATION to clarify the electrical requirements for installation. Revised copy of the Statement of Work is attached. It adds the following verbiage: CLIN 0001 Paragraph 5.8 INCINERATOR INSTALLATION ELECTRICAL - The following is a general overview of what is expected by the awarded contractor regarding the electrical part of the installation: 1) High Voltage supply to the Incinerator Control panel The Contractor is to supply and install the Voltage Supply and it is to be wired up from the location indicate during the Ship Check to the Control panel with appropriate wire size for the voltage and amperage needed. All parts of the application to meet ABS and USCG criteria for runs and connections and attachment. Reference: 5.4 Contractor shall make the electrical connection from the existing Motor Control Center at STB Aft Bhd - Engineers Operating Station to the New Incinerator as per Installation Drawing. Install a new 70A breaker with the same specification as existing. 2) Emergency Shutdown The Contractor is to supply and install an emergency shutdown outside of the space in a location designated by the Chief Engineer and/or First Engineer. The cabling and run to meet ABS and USCG criteria. The Shutdown assembly to be compatible with the environment namely to be waterproof and tamperproof. 3) External Alarm Ship's Force will be supplying the cabling and connections. Contractor should be prepared to assist and should price in costs for 3 each bulkhead/deck penetrations and 4 each cable support (steel welded metal) plus appropriate strapping. 4) Flue Gas Damper The Contractor is to supply and install cable from the First Engineer designated location for the Flue Gas damper operator to the Incinerator Control Panel. Cabling to be for the correct gauge and length for the application and to meet ABS and USCG criteria. 5) Temperature Transmitter from Flue The Contractor is to supply and install cable from the First Engineer designated locations for the Flue Gas Temperature Transmitter to the Incinerator Control Panel. Cabling to be of the correct gauge and length for the application and to meet ABS and USCG criteria. 6) Fire Suppression Controls The Contractor supplied Sub-Contractor for the Fire Suppression controls to designate the location of the fire suppression actuated contact that needs to be wired up to the Incinerator control panel. Contractor to supply correct wire gauge and length to the connect the Incinerator control panel and the fire suppression contact. The cable to be installed as appropriate to meet ABS and USCG criteria Reference: Contractor supplied drawings have a CO2 release mounted externally to the house at the 04 level and it shows a CO2 release shut-down pressure switch. The connection from the pressure switch to the Incinerator panel is not shown and needs to be added as a requirement for the Contractor. General Notes: 1) All Contractor wiring must be ABS/USCG approved - no smoke type with the proper size and rating for the service. 2) All Contractor strapping must be ABS approved and not plastic unless local ABS Surveyor approves of same. 3) All cabling must be attached to a solid structure and if none exists for the location, then the Contractor is responsible for same. All new cable supports to be welded or bolted and then cleaned, primed and painted with two (2) coats of paint. Color to be approved by First Engineer 4) Contractor to have Electrician to be familiar with terminal strips in the Incinerator Control cabinet and other locations and must use correct tools. If incorrect tool is used and terminal strips are damaged Contractor is responsible to supply and make good. 2. The Solicitation DTMA4Q20130014 close date is extended to 4/4/2013 at 4PM PT. All other terms and conditions remain unchanged. ********************************************************** Amendment 000002 changes Factor 2 - Technical Capability requirements for submission with Quote as follows: GENERAL REQUIREMENTS: 3-- EVALUATION FACTORS FOR AWARD The following two non-price factors and the cost factor shall be used to evaluate offers: FACTOR 1 - PAST PERFORMANCE The government will assess the relevance of the contract(s) or subcontract(s) performed in the last three years which required work similar in size and scope to the work described in the Statement of Work (SOW). FACTOR 2 - TECHNICAL CAPABILITY Offerors shall provide a narrative explaining the technical approach to completing the work (not to exceed three typewritten pages), specifically explaining the work sequencing logic and how the approach will optimize the installation and startup effort. Offerors will also provide copies of the resumes of proposed experts/technical representatives to accomplish but not limited to: 1) Rigging and fitting personnel 2) Welding specialist with current certificates approved by ABS 3) Fire Safety for the shutdown of the Incinerator & closing of the Rollup Door & closing of the incinerator damper 4) Connecting to the Engine Control Room from the Incinerator Control Panel alarm No change to the Solicitation DTMA4Q20130014 close date 4/3/2013 at 4PM PT. All other terms and conditions remain unchanged. ************************************************************** Amendment 000001 1. The ship check is changed to Thursday, 3/21 at 9AM onboard the vessel. No change to the Solicitation DTMA4Q20130014 close date 4/3/2013 at 4PM PT. 2. Reference availability of drawings mentionned at SOW paragraphs 2.1, 2.2, and 2.3 hard copies will be scanned and available for distribution at the ship check or for viewing aboard the vessel. To schedule an appointment contact John T. Coyle, First Engineer Training Ship Golden Bear via email at contact@example.gov. 3. All other terms and conditions remain unchanged. ************************************************************** The Department of Transportation, U.S. Maritime Administration (MARAD), San Francisco, CA intends to award a firm fixed price contract to install a new Ship's Solid Trash Only Incinerator. The requested period of performance for the above service is 30 days starting on or about April 1, 2013. Proposed ship check is scheduled for xxxxxxxxxxxx at 9:00 AM on board the Training Ship the Golden Bear. Solicitation DTMA4Q20130014 closes 4/3/2013 at 4PM PT. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. NAICS code 336611 applies. This is NOT a small business set-aside. The solicitation number is stated above, and it is being issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-61B dated October 15, 2012. GENERAL REQUIREMENTS: 1-- INSTRUCTIONS TO OFFERORS a) This solicitation is issued in accordance with FAR Part 12, Commercial Items for Vessel Repairs on the Training Ship the Golden Bear. The Department of Transportation, U.S. Maritime Administration (MARAD), San Francisco, CA intends to award a firm fixed price purchase order for TS Golden Bear for an Incinerator Installation. The proposed contract will be performed while the vessel is located at Vallejo, California, at the foot of 200 Maritime Academy Drive. 2-- INSTRUCTIONS TO OFFERORS - submittal required with quote The following information is required from Offerors and must be submitted with your quote: A. PRICE - Individual prices for all items listed in the schedule, summed to establish a Total Price. B. PAST PERFORMANCE - Offerors shall provide a list of all contracts (Not to exceed three), commercial and/or government performed within the last 3 years for work similar to the instant procurement, including a brief summary, original contract dollar value, completed period of performance, and customer point of contract (address, telephone number and e-mail). C. TECHNICAL PROPOSAL - Offerors shall provide a narrative explaining the technical approach to completing the work (not to exceed three typewritten pages), specifically explaining the work sequencing logic and how the approach will optimize the performance and reliability of the vessel's automation system upgrades. Offerors will also provide copy of the resumes of proposed experts/technical representatives. 3-- EVALUATION FACTORS FOR AWARD The following two non-price factors, listed below in order of importance, and the cost factor shall be used to evaluate offers: FACTOR 1 - PAST PERFORMANCE The government will assess the relevance of the contract(s) or subcontract(s) performed in the last three years which required work similar in size and scope to the work described in the Statement of Work (SOW). FACTOR 2 - TECHNICAL CAPABILITY AMENDMENT 000002 REVISED REQUIREMENTS. 4-- EVALUATION CRITERIA The Government will evaluate bids in response to the solicitation without discussion and will award a contract to the technically responsive bidder whose bid, conforming to the solicitation will be most advantageous to the Government will be considering the total price of all line items. The Government will evaluate all non-price factors as pass/fail, and if all non-price factors pass the quote is technically acceptable. All quotes are compared in order to determine the lowest price, which will be the quote that is selected for award. The Government will evaluate the lowest price bid by taking the total of Contract Line items to include all Option items. Option items will be awarded based on availability of funds. 5-- SITE VISIT/SHIP CHECK - A pre-solicitation ship check is scheduled for Wednesday March 20, 2012 at 9 AM pier-side on board the vessel located in Vallejo, CA. Interested parties please contact Jim Sunfors, Contracting Officer Representative via email at contact@example.gov or by calling +1 (555) 000-0000. The solicitation DTMA4Q20130014 closes on Wednesday, 4/3/2013 at 4PM. 6-- QUOTE SUBMITTAL - This solicitation allows quotes to be transmitted by email. All email bids shall be addressed to Patricia Etridge, Contracting Officer at contact@example.gov. In accordance with FAR 52-216-1, quotes must be received by the Contracting Officer, including any amendments and revisions and all evaluation factors required above by the time specified in the solicitation. 7-- REPS AND CERTS - The FAR requires that offerors provide Reps & Certs at least annually via ORCA. Reference FAR 52.212-03 for further instructions. The link to ORCA is http://orca.bpn.gov.5 8-- DEPT OF LABOR WAGE DETERMINATION - SOLANO COUNTY CA WD 05-2069 (Rev.-12) was first posted on www.wdol.gov on 06/19/2012 and a copy is included in the statement of work. ATTACHMENT 1: REQUEST FOR QUOTE - STANDARD FORM 1449 ATTACHMENT 2: QUOTE SHEET ATTACHMENT 3: STATEMENT OF WORK ATTACHMENT 4: TERMS AND CONDITIONS

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS